Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A860 + (ML18012A860)
- ML18012A862 + (ML18012A862)
- ML18012A863 + (ML18012A863)
- 05000400/LER-1997-019, :on 970720,turbine Trip/Reactor Trip Occurred. Caused by Three Phase Fault That Collapsed Excitation Field in Main Generator,Resulting in Generator Lockout.Exciter Rotor Assembly Was Replaced + (ML18012A864)
- HNP-97-163, Forwards Exercise Scenario W/Controller Info & Simulation Data for HNP Emergency Preparedness Exercise Scheduled for 971007.Package Reflects Change to Exercise Objectives Previously Submitted in .W/O Encl + (ML18012A865)
- HNP-97-162, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:Missile Shield Blocks Were Reinstalled on 970406 within Time Require by Action Statement + (ML18012A866)
- IR 05000400/1997006 + (ML18012A867)
- 05000263/LER-1917-006, Regarding Loss of Reactor Protection System Scram Function During Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests Due to Use of a Test Fixture + (ML18012A868)
- ML18012A869 + (ML18012A869)
- ML18012A871 + (ML18012A871)
- HNP-97-167, Forwards Proprietary Notification of Changes in Reactor Operator & SRO Status.Encl Withheld,Per 10CFR2.790(a)(6) + (ML18012A873)
- HNP-97-170, Provides Closeout Documentation Harris Nuclear Plant Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. Plant Will Restore Thermo-Lag Barrier Configurations to Svc & Discontinue Compensatory Actions Accordingly + (ML18012A877)
- ML18012A878 + (ML18012A878)
- ML18012A879 + (ML18012A879)
- ML18012A880 + (ML18012A880)
- ML18012A881 + (ML18012A881)
- ML18012A882 + (ML18012A882)
- ML18012A884 + (ML18012A884)
- ML18012A886 + (ML18012A886)
- ML18012A887 + (ML18012A887)
- ML18012A897 + (ML18012A897)
- ML18012A900 + (ML18012A900)
- 3F0118-02, 30-Day Spent Fuel Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pools + (ML18015A006)
- NOC-AE-18003540, Submittal of Revised Operations Quality Assurance Plan + (ML18015A007)
- ML18015A007 + (ML18015A007)
- RAIO-0118-58176, LLC Supplemental Response to NRC Request for Additional Information No. 112 (Erai No. 8983) on the NuScale Design Certification Application + (ML18015A008)
- RAIO-0118-58153, LLC - Supplemental Response to NRC Request for Additional Information No. 180 (Erai No. 9010) on the NuScale Design Certification Application + (ML18015A010)
- ML18015A012 + (ML18015A012)
- ML18016A001 + (ML18016A001)
- ML18016A008 + (ML18016A008)
- ML18016A011 + (ML18016A011)
- ML18016A021 + (ML18016A021)
- ML18016A025 + (ML18016A025)
- ULNRC-06408, Submittal of Single Positive Test Forms for January-December 2017 + (ML18016A026)
- ML18016A028 + (ML18016A028)
- CNL-18-008, Anchor Darling Double Disc Gate Valve Commitment Revision + (ML18016A032)
- ML18016A038 + (ML18016A038)
- ML18016A050 + (ML18016A050)
- ML18016A051 + (ML18016A051)
- ML18016A052 + (ML18016A052)
- NLS2018001, Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 59 + (ML18016A053)
- ML18016A054 + (ML18016A054)
- ML18016A056 + (ML18016A056)
- ML18016A057 + (ML18016A057)
- ML18016A064 + (ML18016A064)
- ML18016A065 + (ML18016A065)
- ML18016A066 + (ML18016A066)
- Press Release-I-18-001, New NRC Inspector Named at Nine Mile Point Nuclear Plant + (ML18016A070)
- ML18016A093 + (ML18016A093)
- ML18016A101 + (ML18016A101)
- ML18016A103 + (ML18016A103)