Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17289A824 + (ML17289A824)
- GO2-92-200, Forwards Amend 45 to FSAR Section Fire Protection Evaluation + (ML17289A825)
- ML17289A830 + (ML17289A830)
- ML17289A835 + (ML17289A835)
- GO2-92-208, Application for Amend to License NPF-21,changing TS 3/4.3.7.6 Re Source Range Monitor Surveillance Criteria Specified in LCO to Incorporate Guidance in Rev 1 of GE Svc Info Ltr Covering Channel Rate Count + (ML17289A836)
- ML17289A837 + (ML17289A837)
- ML17289A838 + (ML17289A838)
- GO2-92-209, Application for Amend to License NPF-21,changing TS 3/4.3.3 Re ECCS Actuation Intrumentation,Degraded Voltage Protection to Reflect Rev to Design Calculations Governing Values & Clarifying Degraded Voltage Protection Logic + (ML17289A839)
- ML17289A840 + (ML17289A840)
- ML17289A841 + (ML17289A841)
- GO2-92-210, Application for Amend to License NPF-21,changing TS Figure 3.1.5-2 Re Sodium Pentaborate Tank,Vol Vs Concentration Requirements to Reflect Actual Low Vol Alarm & Low Limit Values for Standby Liquid Control Tank + (ML17289A843)
- ML17289A844 + (ML17289A844)
- ML17289A845 + (ML17289A845)
- GO2-92-205, Forwards Response to 920815 Confirmatory Action Ltr Re 920815 Power Oscillation Event.Approx 80 Elapsed Between Beginning of Oscillation Event & Manual Scram.All Quarantine Records Will Be Available for NRC Review + (ML17289A846)
- GO2-92-214, Withdraws 861118 & 890615 Applications for Amend to License NPF-21,changing TS Tables 3.3.7.5-1 Re Accident Monitoring Instrumentation & 4.3.7.5-1 Re Srs.Existing Neutron Flux Instrumentation Adequately Addresses Listing in TS + (ML17289A847)
- ML17289A848 + (ML17289A848)
- ML17289A850 + (ML17289A850)
- ML17289A851 + (ML17289A851)
- GO2-92-216, Forwards Suppl to 920305 Response to Second Request for Addl Info Re Topical Rept WPPSS-FTS-129, BWR Transient Analysis Model, Consisting of Addl Clarifications Requested by NRC Contracted Reviewer in 920825 Telcon + (ML17289A853)
- ML17289A855 + (ML17289A855)
- ML17289A859 + (ML17289A859)
- GO2-92-220, Corrects Administrative Error in TS Table 3.3.7.12-1 Re Explosive Gas Monitoring Instrumentation Contained in 861118 & 910628 Applications for Amend to License NPF-21,per GL 89-01 + (ML17289A860)
- ML17289A861 + (ML17289A861)
- ML17289A862 + (ML17289A862)
- ML17289A866 + (ML17289A866)
- GO2-92-219, Forwards Response to Request for Addl Info on VIPRE-01 Mod-02 Documentation,Epri NP-2511-CCM, VIPRE-01:Thermal- Hydraulic Analysis Code for Reactor Cores + (ML17289A867)
- GO2-92-213, Responds to Open Followup Item in Insp Rept 50-397/92-05 Re Expiration of Ltr of Agreement Between Util & State of Wa Emergency Mgt Agency.Util to State Containing MOU for Emergency Preparedness Encl + (ML17289A868)
- ML17289A870 + (ML17289A870)
- ML17289A874 + (ML17289A874)
- ML17289A877 + (ML17289A877)
- ML17289A880 + (ML17289A880)
- GO2-92-221, Requests Waiver of Compliance from TS 3.8.1.1, AC Sources - Operating to Extend by 72 H,To 144 H,Action Statement to Allow post-maint Testing on Repaired Dg,Based on 920920 Failure of Div 1 EDG to Carry Full Load,Per TS SR + (ML17289A881)
- 05000397/LER-1990-019-01, Forwards LER 90-019-01,identified in Response to Insp Rept 50-397/90-20 W/Expected Submittal Date of 910114.Rev Delayed Due to Higher Priority Work.Ler Became Part of LER Suppl Backlog + (ML17289A882)
- ML17289A883 + (ML17289A883)
- 05000397/LER-1990-019, :on 900912,determined That Discrepancy Existed W/Pressure Suppression Limit Curve in EOPs During NRC Team Insp of Eops.Caused by Procedural Discrepancy. Procedure Revised to Reflect Correct Curve & EOPs Reviewed + (ML17289A884)
- 05000397/LER-1990-009, :on 900430,three Separate Spurious Trips of RPS Electrical Protection Assembly (EPA) Circuit Breaker Occurred.Caused by Degraded Component in Logic Board of Epa. RPS-EPA-3F Breaker & Logic Board Replaced + (ML17289A885)
- ML17289A886 + (ML17289A886)
- 05000397/LER-1987-025-01, Lengthens Replacement Period of Circuit Breakers in RPS Electrical Protection Assemblies,From 3 Yrs as Previously Committed to in LER 87-025-01 to 8 Yrs,Based on trouble-free Experience to Date W/Replacement of Circuit Break + (ML17289A887)
- GO2-92-229, Responds to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f) + (ML17289A888)
- ML17289A892 + (ML17289A892)
- IR 05000397/1992030 + (ML17289A894)
- GO2-92-228, Responds to NRC Bulletin 92-001,Suppl 1, Failure of Thermo- Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Util Has Identified Areas Which Use 1 or 3-hour Thermo-Lag 330 Matl + (ML17289A896)
- 05000397/LER-1992-025, :on 920522,during Insp of HPCS Pump Motor,Small Piece of Aluminum Upper Air Deflector Found Lodged Inside Motor Stator.Caused by Personnel Error.Evaluation of ECCS Will Be Performed to Prevent Future Damage + (ML17289A898)
- 05000397/LER-1992-035-01, Forwards LER 92-035-01.Suppls Provides Details & Clarifications Requested in NRC .Futher Review Indicates That Changes to post-mod Testing Plan Were Contributing Cause for Event + (ML17289A899)
- ML17289A900 + (ML17289A900)
- ML17289A903 + (ML17289A903)
- ML17289A905 + (ML17289A905)
- ML17289A907 + (ML17289A907)
- GO2-92-230, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-20.Corrective Actions:Pipe Welds Examined During 1991 Refueling Outage Using Digital Instruments Also Partially Reexam in Circumferential Scan Direction + (ML17289A914)
- GO2-92-237, Comment on Proposed Changes to SALP Program.Util Supports Comments Being Filed by NUMARC & Legal Firm of Winston & Strawn + (ML17289A915)
- GO2-92-234, Special Rept:On 920905,channel 1 on Main Steam Line D Nozzle in Drywell Did Not Pass Surveillance & Inoperable for More than 30 Days.Caused by Faulty Equipment in Drywell. Maint Work Request Initiated to Repair Failed Channel + (ML17289A916)