Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277A797 + (ML17277A797)
- GO2-83-828, Restates Util Commitment to Install Diesel Starting Air Dryers at First Refueling Outage,Not by Fuel Load. Installation Unnecessary at Fuel Load to Complete Safe Reliable Station + (ML17277A798)
- GO2-83-842, Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept + (ML17277A799)
- ML17277A800 + (ML17277A800)
- GO2-83-831, Forwards Response to SER (NUREG-0892),Confirmatory Issue 7, Question 110.42 Re Component Supports.Data Quantifies Difference Between Support Design Load W/ & W/O Inclusion of Thermal Loads + (ML17277A804)
- GO2-83-832, Advises of Util Decision to Add Auxiliary Steam Isolation Devices to Reduce Potential Reactor Bldg Accident Environ Conditions.Facility Can Be Operated Safely Until Mod Completed for Listed Reasons + (ML17277A805)
- GO2-83-833, Updates Response to Rev 1 to NUREG-0313 Re Intergranular Stress Corrosion Cracking in Bwrs.Summary of Selection Process Used to Determine Welds Receiving Induction Heating Stress Improvement Treatment Listed + (ML17277A806)
- GO2-83-840, Clarifies Use of Quality Verification Instruction QVI-09 by Facility Project Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures.Revised Page 3.8-190 to Be Incorporated Into Amend to FSAR + (ML17277A807)
- ML17277A808 + (ML17277A808)
- ML17277A811 + (ML17277A811)
- ML17277A817 + (ML17277A817)
- GO2-83-844, Forwards Response to Specific Issues Raised in Sser 3 (NUREG-0892) Addressing Seismic Qualification of safety- Related Electrical & Mechanical Equipment + (ML17277A818)
- GO2-83-814, Forwards WPPSS Unit 2 Single-Loop Operation Analysis. Rept Will Be Incorporated in Amend 32 to FSAR + (ML17277A820)
- ML17277A821 + (ML17277A821)
- ML17277A822 + (ML17277A822)
- GO2-83-085, Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983 + (ML17277A852)
- ML17277A853 + (ML17277A853)
- ML17277A854 + (ML17277A854)
- BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 + (ML17277A855)
- GO2-83-855, Forwards Response to FSAR Question 110.44 in NRC .W/One Oversize Drawing.Aperture Card Is Available in Pdr.Response W/O Encl + (ML17277A857)
- ML17277A858 + (ML17277A858)
- ML17277A859 + (ML17277A859)
- ML17277A861 + (ML17277A861)
- GO2-83-865, Forwards Response to 830907 Request for Addl Info Re Setpoint Methodology.Resolution of Issue Generically w/NRC- Recognized Util Group Presently Addressing Issue Requested + (ML17277A862)
- GO2-83-861, Discusses Agreement W/Nrc Affecting Surveillance Requirements in NUREG-0892,SER Suppl 2 Re TMI Action Item II.K.3.28 on Automatic Depressurization Sys.Bottle Pressure Verification Changed to 31 Days + (ML17277A864)
- GO2-83-863, Forwards Addl Info Re Containment Out-of Roundness Per NRC 830722 Meeting + (ML17277A865)
- ML17277A868 + (ML17277A868)
- ML17277A869 + (ML17277A869)
- ML17277A870 + (ML17277A870)
- GO2-83-872, Forwards Four Oversize Drawings,Closing Out NUREG-0892,SER Outstanding Issue 29 Re Vacuum Breaker Valves.Valve Response Meets Containment Design Bases for Response Time & Flow Capacity.Aperture Cards Are Available in PDR + (ML17277A871)
- ML17277A872 + (ML17277A872)
- ML17277A873 + (ML17277A873)
- ML17277A874 + (ML17277A874)
- ML17277A875 + (ML17277A875)
- ML17277A877 + (ML17277A877)
- GO2-83-880, Forwards Draft Tech Specs to Require Use of Shorting Links During Initial Source Range Monitors/Intermediate Range Monitors Overlap Demonstration or post-mod,per NUREG-0123 + (ML17277A883)
- ML17277A887 + (ML17277A887)
- GO2-83-891, Forwards marked-up Tech Spec Re ECCS in Response to 830923 Request for Proposed Change to Surveillance Requirements on Automatic Depressurization Sys Backup Air Supply,Per SER, NUREG-0892 & Item II.K.3.28 + (ML17277A890)
- GO2-83-884, Forwards Response to FSAR Question 110.41 Re Requirements for Equipment Nozzle Loads,Per SER Confirmatory Issue 7 on Component Supports + (ML17277A894)
- GO2-83-885, Forwards Response to FSAR Question 110.43 in NRC . Increased Damping & Seismic Spectra Resulting from Finite Element Model Utilized to Produce Phase II Refined Loads for Each of Five Sample Anchor Groups + (ML17277A898)
- GO2-83-881, Requests That Spent Fuel Storage Pool Monitors Not Be Made Requirement in Tech Specs,Based on Recent Exemption Granted for License SNM-1890.Storage in Spent Fuel Storage Area Exemption Predicated on Design of Storage Facility + (ML17277A902)
- ML17277A905 + (ML17277A905)
- ML17277A912 + (ML17277A912)
- ML17277A913 + (ML17277A913)
- GO2-83-906, Forwards marked-up FSAR Changes in Response to SER Confirmatory Issue 1 Re Break Locations.Info Based on Status as-built Configuration.Final as-built Analysis Not Expected to Result in Significant Differences + (ML17277A914)
- GO2-83-908, Forwards Response to Telcon Request for Addl Clarification of Response to Question 640.01 a & B Re Emergency Operating Procedures Generation Package.Ser (NUREG-0892) Confirmatory Issue 15 Re Emergency Procedures Review Closed + (ML17277A915)
- ML17277A916 + (ML17277A916)
- GO2-83-860, Forwards Loose Parts Detection Sys Conformance Evaluation, Including Action Requested in NUREG-0892,SER Section 4.4.6 + (ML17277A917)
- GO2-83-907, Forwards Draft Amend 33 to FSAR Consisting of Solid Waste Mgt Sys Re Utilization of Interim Portable Solid Radwaste Solidification Sys.Submittal Will Be Incorporated in FSAR Amend 33.W/two Oversize Drawings.Aperture Cards in PDR + (ML17277A918)
- ML17277A919 + (ML17277A919)
- ML17277A920 + (ML17277A920)