Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-81-545, Forwards Responses to NRC Questions 121.19 Through 121.22 Re Preservice Insp Program,Per 811016 Meeting + (ML17276A609)
- GO2-81-544, Provides Rationale for Changing Discharge Port Design from 18-inch Circular Pipe to 8-inch by 32-inch Slot,Noted in Des Section 4.2.2.4.Design Results in Greater Mixing by Providing Greater Jet Entrainment Surface.Related Info Encl + (ML17276A616)
- GO2-81-518, Forwards Open Items from Structural Engineering Branch 811005-08 Meeting in Woodbury,Ny + (ML17276A629)
- ML17276A633 + (ML17276A633)
- GO2-81-541, Forwards Responses to Open Items Discussed at 811117-18 Geosciences Meeting.Remaining Reponses Will Be Transmitted Prior to 811231 + (ML17276A636)
- ML17276A642 + (ML17276A642)
- GO2-81-551, Forwards Responses to Geosciences Branch Questions 360.14 & 360.17.Faults Along Rattlesnake-Wallula Alignment Are Not Capable According to NRC Criteria.Estimates of Potential Earthquake Magnitudes Encl + (ML17276A643)
- GO2-81-532, Forwards Info on Apps G & H Per Agreement at 810401 Meeting.Responses to Questions 121.011 Through 121.019 Also Encl.Responses Will Be Included in Amend to FSAR + (ML17276A651)
- GO2-81-561, Forwards Responses to Hydrologic Engineering Section Safety Questions 371.015,371.016,371.017 & 371.018 Contained in NRC .Other Responses Will Be Submitted by 820115.Ten Oversize Drawings Encl.Aperture Cards Are in PDR + (ML17276A658)
- ML17276A665 + (ML17276A665)
- ML17276A672 + (ML17276A672)
- ML17276A682 + (ML17276A682)
- ML17276A690 + (ML17276A690)
- ML17276A701 + (ML17276A701)
- ML17276A708 + (ML17276A708)
- ML17276A716 + (ML17276A716)
- ML17276A727 + (ML17276A727)
- ML17276A736 + (ML17276A736)
- ML17276A745 + (ML17276A745)
- ML17276A755 + (ML17276A755)
- ML17276A779 + (ML17276A779)
- ML17276A788 + (ML17276A788)
- ML17276A793 + (ML17276A793)
- GO2-81-563, Forwards Licensing Review Group App I to Fsar.App Will Be Included in Amend 23 + (ML17276A804)
- GO2-81-556, Forwards Suppl 2 to Engineering Evaluation of WNP-2 Sacrificial Shield Wall + (ML17276A823)
- GO2-81-562, Forwards marked-up FSAR Chapter 13, Conduct of Operations. Rewrite Will Be Incorporated Into Next FSAR Amend + (ML17276A829)
- ML17276A835 + (ML17276A835)
- IR 05000397/1981024 + (ML17276A844)
- GO2-81-564, Forwards Responses to SER Open Items Re Initial Test Program,To Be Incorporated Into Next FSAR Amend.Meeting to Resolve Disputed Open Items Suggested Prior to 810312 Safety Evaluation + (ML17276A855)
- ML17276A872 + (ML17276A872)
- ML17276A877 + (ML17276A877)
- ML17276A886 + (ML17276A886)
- ML17276A893 + (ML17276A893)
- ML17276A918 + (ML17276A918)
- ML17276A936 + (ML17276A936)
- ML17276A941 + (ML17276A941)
- ML17276A948 + (ML17276A948)
- ML17276A951 + (ML17276A951)
- ML17276A952 + (ML17276A952)
- ML17276A953 + (ML17276A953)
- ML17276A954 + (ML17276A954)
- ML17276A955 + (ML17276A955)
- ML17276A956 + (ML17276A956)
- ML17276A957 + (ML17276A957)
- ML17276A958 + (ML17276A958)
- ML17276A960 + (ML17276A960)
- ML17276A964 + (ML17276A964)
- ML17276A968 + (ML17276A968)
- ML17276A971 + (ML17276A971)
- ML17276A972 + (ML17276A972)
- ML17276A975 + (ML17276A975)