Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A111 + (ML17229A111)
- ML17229A112 + (ML17229A112)
- L-96-280, Informs That Summary Rept Will Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (ML17229A113)
- L-96-281, Advises That Summary Description Will Be Submitted to NRC Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, within 180 Days + (ML17229A114)
- L-96-283, Informs That Util Agrees W/Nrc Staff Re Importance of Issues Surrounding Revised LBLOCA Evaluation Model.Final Analysis of Impact of Model Error on ECCS Acceptance Criteria Will Be Prepared + (ML17229A115)
- ML17229A116 + (ML17229A116)
- L-96-256, Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs + (ML17229A117)
- ML17229A118 + (ML17229A118)
- ML17229A119 + (ML17229A119)
- ML17229A120 + (ML17229A120)
- ML17229A121 + (ML17229A121)
- ML17229A123 + (ML17229A123)
- L-96-295, Submits Info Contained in 30 Day 10CFR50.46 Rept Re Large Break Loca/Eccs Revised Analysis + (ML17229A125)
- ML17229A126 + (ML17229A126)
- ML17229A127 + (ML17229A127)
- ML17229A128 + (ML17229A128)
- ML17229A129 + (ML17229A129)
- ML17229A131 + (ML17229A131)
- ML17229A132 + (ML17229A132)
- L-96-301, Responds to Violations Noted in Insp Repts 50-335/96-13 & 50-389/96-13.Corrective Actions:Reviewed & Approved Inclusion of Key Radiation Monitors & Reviewed 961022 NRC Ltr & EPRI Technical Bulletin Re Reliability Criteria + (ML17229A134)
- ML17229A136 + (ML17229A136)
- ML17229A137 + (ML17229A137)
- L-96-297, Forwards MOR for Oct 1996 for St.Lucie Unit 1 & 2 & Revised Monthly Rept for Sept 1996 + (ML17229A138)
- ML17229A139 + (ML17229A139)
- 05000335/LER-1996-011, :on 960817,discovered Failure of Oxygen Analyzer.Caused by Degraded Sensor Membrane in Oxygen Detector.Calibr,Tested & Returned Oxygen Analyzer to Service & Replaced Sensor Membrane + (ML17229A143)
- L-96-304, Requests Approval to Incorporate Code Case N-533, Alternative Requirements for VT-2 Visual Exam of Class 1 Insulated Pressure-Retaining Bolted Connections,Section XI, Div 1, for Use in Unit 2 10-Yr ISI Program + (ML17229A144)
- 05000335/LER-1996-014, :on 961027,invalid Engineered Safety Features Actuation of Containment Isolation Components Occurred Due to Failed Relay.Failed Relay Was Inspected & Replaced + (ML17229A145)
- IR 05000335/1996016 + (ML17229A146)
- 05000335/LER-1996-015, :on 961029,operation Prohibited by Tech Specs Occurred.Caused by Inadequate Procedure for Isolating DC Grounds.Dc Power Restored,Failed Relay Replaced & Testing Performed to Determine Root Cause + (ML17229A147)
- L-96-302, Requests Approval to Incorporate Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section 11,Div 1, for Use in Ten Year Inservice Insp Program + (ML17229A148)
- ML17229A149 + (ML17229A149)
- ML17229A151 + (ML17229A151)
- ML17229A152 + (ML17229A152)
- ML17229A154 + (ML17229A154)
- ML17229A155 + (ML17229A155)
- IR 05000335/1996013 + (ML17229A156)
- L-96-315, Responds to Violations Noted in Insp Rept 50-335/96-15. Corrective Actions:Updated Measuring & Test Equipment Log, Briefed Instrument & Control Dept on Event & Revised Quality Instruction Qi 12-PR/PSL + (ML17229A157)
- ML17229A158 + (ML17229A158)
- L-96-298, Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values + (ML17229A159)
- ML17229A160 + (ML17229A160)
- ML17229A161 + (ML17229A161)
- ML17229A162 + (ML17229A162)
- ML17229A163 + (ML17229A163)
- ML17229A164 + (ML17229A164)
- ML17229A165 + (ML17229A165)
- L-96-331, Forwards St Lucie Plant Status Meeting on 961211, Which Includes Detailed Review of Plants Key Performance Indicators + (ML17229A167)
- ML17229A168 + (ML17229A168)
- ML17229A169 + (ML17229A169)
- L-96-327, Submits Request for Changes to Official Svc List for Units 1 & 2.New Address Specifically for NRC Mail Submitted + (ML17229A170)
- L-96-325, Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2 + (ML17229A171)
- ML17229A172 + (ML17229A172)