Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-90-393, Submits Addl Info on Proposed License Amend to Increase Max Allowable RTD Delay Time as Requested at 900920 Meeting W/ NRC + (ML17223A997)
- ML17223B000 + (ML17223B000)
- L-90-398, NPDES Discharge Monitoring Rept for Sept 1990 + (ML17223B004)
- L-90-397, Forwards Monthly Operating Repts for Oct 1990 for St Lucie Units 1 & 2 & Revised Data Rept for June 1990 for Unit 1 + (ML17223B005)
- ML17223B006 + (ML17223B006)
- L-90-404, Informs That 10CFR50.46 Rept of Changes/Errors in ECCS Limiting Transient Models for 891017-901016 Will Be in Mar 1991.Changes Discussed W/Facility NRC Project Manager + (ML17223B007)
- ML17223B010 + (ML17223B010)
- ML17223B011 + (ML17223B011)
- L-90-400, Confirms That All Mods for Facility Completed & Operational. All Actions to Be Taken in Response to Generic Ltr 88-17 Complete + (ML17223B013)
- L-90-413, Documents 901123 Request & Verbal Approval of Temporary Waiver of Compliance from Tech Spec 3.7.3, Ccws + (ML17223B015)
- L-90-407, Quarterly Turtle Activities Rept for Third Quarter 1990 + (ML17223B016)
- L-90-402, Advises That Licensee Completed First Verification of Structural Integrity of old-style CEAs in Unit Core on 901128,per NRC Request + (ML17223B017)
- ML17223B018 + (ML17223B018)
- ML17223B020 + (ML17223B020)
- ML17223B021 + (ML17223B021)
- L-90-399, Advises That ATWS Sys Implementation Complete & in Compliance w/10CFR50.62, Requirements for Reduction of Risk from ATWS for LWR Power Plants + (ML17223B023)
- ML17223B029 + (ML17223B029)
- 05000389/LER-1990-004-02, :on 901109,inadvertent Actuation of Assorted Engineered Safeguards Equipment,Including Emergency Diesel Generator 2A,occurred.Caused by Personnel Error.Personnel Counseled + (ML17223B030)
- L-90-436, Forwards Monthly Operating Repts for Nov 1990 for St Lucie Units 1 & 2 & Revised Operating Data Rept for Aug 1990 for Unit 2 Also Encl + (ML17223B031)
- ML17223B032 + (ML17223B032)
- ML17223B033 + (ML17223B033)
- ML17223B034 + (ML17223B034)
- 05000389/LER-1989-009, :on 891128,containment Purge Valve Local Leak Rate Exceeded Tech Spec Limits.Caused by Valve Closure Stop Out of Adjustment.Testing Frequency Increased to Once Every 6 Wks + (ML17223B035)
- L-90-435, Forwards Response to Generic Ltr 90-06 Re Resolution of Generic Issue 70 on PORV & Block Valve Reliability & Generic Issue 94 on Addl Low Temp Overpressure Protection + (ML17223B036)
- ML17223B037 + (ML17223B037)
- L-90-437, Revises 881024 Application for Amend to License NPF-16, Increasing Max Allowable RTD Delay Time from 16 to 14 s, Per NRC Request + (ML17223B039)
- L-90-452, Submits Comments on Draft Safety Evaluation on Station Blackout Rule (10CFR50.63),per NRC 901121 Request + (ML17223B040)
- L-90-451, Advises of Completion of All Recommendations in Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment for Unit 2,per .Unit 1 Implementation Scheduled for Completion During Fall 1991 Refueling Outage + (ML17223B041)
- L-90-453, Forwards Results of Unknown Spiked Samples Received on 901024 + (ML17223B042)
- L-90-454, Advises That Emergency Response Agencies Will Conduct Exercise of Emergency Plan for Plant on 910320 & 21. Odjectives for Exercise Encl + (ML17223B043)
- IR 05000335/1990023 + (ML17223B044)
- L-90-455, Corrects 901121 Response to Violations Noted in Insp Repts 50-335/90-23 & 50-389/90-23.Corrective Actions Re Maint Personnel Training on Revised Matl Control Procedures Will Be Completed by 910228 + (ML17223B044)
- L-90-395, Application for Amends to Licenses DPR-67 & NPF-16,revising Tech Specs Re Organizational Titles + (ML17223B045)
- ML17223B046 + (ML17223B046)
- ML17223B047 + (ML17223B047)
- ML17223B053 + (ML17223B053)
- ML17223B055 + (ML17223B055)
- ML17223B056 + (ML17223B056)
- ML17223B057 + (ML17223B057)
- 05000389/LER-1990-006-03, :on 901219,inadvertent Actuation of Auxiliary Feedwater Sys Equipment Occurred During Monthly Functional Testing.Caused by Equipment Failure.Details of Event & Troubleshooting Plan Reviewed + (ML17223B058)
- ML17223B059 + (ML17223B059)
- ML17223B060 + (ML17223B060)
- IR 05000335/1990027 + (ML17223B062)
- ML17223B066 + (ML17223B066)
- ML17223B067 + (ML17223B067)
- ML17223B069 + (ML17223B069)
- ML17223B070 + (ML17223B070)
- ML17223B072 + (ML17223B072)
- ML17223B073 + (ML17223B073)
- ML17223B074 + (ML17223B074)
- ML17223B075 + (ML17223B075)