Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17213B266 + (ML17213B266)
- RAIO-0817-55190, LLC Response to NRC Request for Additional Information No. 76 (Erai No. 8792) on the NuScale Design Certification Application + (ML17213B267)
- ML17213B268 + (ML17213B268)
- ML17213B269 + (ML17213B269)
- L-83-240, Responds to Generic Ltr 83-10b Re Resolution of TMI Action Plan Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Program to Close Out Item Under Development in Conjunction w/C-E Owners Group Program + (ML17213B284)
- L-83-236, Responds to Generic Ltr 82-33 Re Requirements for Emergency Response Capability (NUREG-0737,Suppl 1).Status & Proposed Implementing Schedule Submitted + (ML17213B285)
- L-83-238, Responds to Generic Ltr 82-33 Re Requirements for Emergency Response Capabilities.Status & Implementation Schedule & List & Description of Reg Guide 1.97,Type a Variables Encl + (ML17213B286)
- L-83-230, Lists Info Re Reactor Vessel Internals & Thermal Shield Plant Recovery Program to Be Provided Prior to Startup,Per 830413 Telcon.Reactor Vessel Internals & Thermal Shield Insp Results Will Be Provided Prior to Startup + (ML17213B287)
- L-83-247, Application for Amend to License NPF-16,modifying Surveillance Requirements of RCS Pressurizer to Comply w/NUREG-0737,Item II.B.3.1 Emergency Power Supply for Pressurizer Heaters + (ML17213B288)
- ML17213B289 + (ML17213B289)
- ML17213B290 + (ML17213B290)
- ML17213B291 + (ML17213B291)
- ML17213B292 + (ML17213B292)
- ML17213B294 + (ML17213B294)
- ML17213B296 + (ML17213B296)
- ML17213B297 + (ML17213B297)
- ML17213B299 + (ML17213B299)
- ML17213B300 + (ML17213B300)
- ML17213B303 + (ML17213B303)
- L-83-261, Forwards Suppl 1 to 830412 Request for Exemption from Section III-0 of App R Requirements Re Reactor Coolant Pumps in Fire Protection Sys + (ML17213B305)
- L-83-257, Advises That First Reactor Vessel Matl Irradiation Surveillance Specimen Will Be Removed in Conjunction W/ Current Extended Outage to Remove Reactor Vessel Thermal Shield,Tentatively Scheduled for Completion in Dec 1984 + (ML17213B306)
- L-83-255, Advises of Changes That Should Be Made to to DG Eisenhut Re Reload Safety Analysis for Cycle 6.Ref 2 of XN-NF-83-81 Cycle 6 SAR Should Be Deleted & Ref 11 Should Be Changed to XN-NF-75-32(P),Suppls 1-4 + (ML17213B309)
- L-83-254, Requests Relief from Tech Spec 4.4.10.1.a & 10CFR50.55a(g) Requirements Re Inservice Insp.Relief Requested Due to Problems W/Thermal Shield Which Necessitated Removal of Reactor Internals + (ML17213B310)
- L-83-262, Withdraws 830405 Relief Request for Performing Inservice Insp.Relief Will Not Be Required + (ML17213B311)
- L-83-264, Forwards Plant Recovery Plan Presented at 830425 Meeting Re Reactor Vessel Internals & Thermal Shield,In Response to Item C of .Plan Will Be Revised Daily W/Updates Provided Upon Availability + (ML17213B312)
- L-83-263, Summarizes 830425 Meeting W/Nrc Re Reactor Vessel Internals & Thermal Shield Plant Recovery Program Concerning Pressurized Thermal Shock.Plant May Safely Operate W/O Restriction from Pressurized Thermal Shock Considerations + (ML17213B314)
- L-83-265, Forwards Reactor Vessel Internals & Thermal Shield Plant Recovery Program Per 830419 Commitment to Provide Safety Assessment of Possible Effects on Fuel Performance Due to Loose Parts.No Fuel Problems Indicated at Facility + (ML17213B318)
- ML17213B320 + (ML17213B320)
- ML17213B321 + (ML17213B321)
- ML17213B323 + (ML17213B323)
- ML17213B324 + (ML17213B324)
- ML17213B326 + (ML17213B326)
- ML17213B328 + (ML17213B328)
- ML17213B330 + (ML17213B330)
- ML17213B331 + (ML17213B331)
- ML17213B332 + (ML17213B332)
- L-83-227, Forwards Fire Hazard Analysis for Facility + (ML17213B333)
- ML17213B334 + (ML17213B334)
- ML17213B336 + (ML17213B336)
- ML17213B337 + (ML17213B337)
- ML17213B338 + (ML17213B338)
- ML17213B339 + (ML17213B339)
- ML17213B340 + (ML17213B340)
- ML17213B341 + (ML17213B341)
- ML17213B343 + (ML17213B343)
- L-83-280, Advises That 10-yr pressure-temp Operating Limits (P-T) for Plant Recovery Program Reactor Vessel Internals & Thermal Shield Valid for Upcoming Cycle 6.P-T Limits Will Be Reviewed & Revised,If Necessary,Prior to Exceeding 7.4 EFPY + (ML17213B344)
- L-83-285, Forwards Info Justifying Continued Operation W/Electrical Equipment in Item 114 Per .All Other Items Listed in Category Ii.B of Franklin Research Ctr Technical Evaluation Rept Replaced W/Qualified Transmitters + (ML17213B345)
- L-83-276, Advises That Vendor Safety Analysis to Support Installation of Mods to Auxiliary Sys,Per Util Re Main Steam Line Break W/Continued Feedwater Addition,Is Under Review. Response to Core Reactivity Question Expected by 830615 + (ML17213B347)
- ML17213B352 + (ML17213B352)
- ML17213B354 + (ML17213B354)
- ML17213B355 + (ML17213B355)