Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212A745 + (ML17212A745)
- ML17212A747 + (ML17212A747)
- ML17212A758 + (ML17212A758)
- ML17212A759 + (ML17212A759)
- L-81-408, Forwards Responses to Matls Engineering Branch Request for Addl Info Re Loose Parts Monitoring Sys & Concrete Expansion Anchor Design.Responses Will Be Incorporated Into FSAR in Future Amend + (ML17212A760)
- ML17212A762 + (ML17212A762)
- ML17212A766 + (ML17212A766)
- ML17212A768 + (ML17212A768)
- ML17212A769 + (ML17212A769)
- ML17212A770 + (ML17212A770)
- ML17212A772 + (ML17212A772)
- ML17212A773 + (ML17212A773)
- L-81-401, Forwards Monthly Status Rept Re Const/Startup Progress for Aug 1981 + (ML17212A775)
- L-81-407, Forwards Response to NRC 810903 Request for Addl Info Re FSAR Open Items.Ser Can Be Issued + (ML17212A776)
- ML17212A782 + (ML17212A782)
- ML17212A784 + (ML17212A784)
- L-81-411, Forwards Response to Generic Ltr 81-14 Re Auxiliary Feedwater Sys Seismic Qualification,Per NRC 810210 Request. Plant & Sys Will Function as Designed & Would Enable Plant to Be Brought to Cold Shutdown Condition Safely + (ML17212A787)
- ML17212A788 + (ML17212A788)
- IR 05000335/1981019 + (ML17212A790)
- L-81-410, Forwards Response to NRC Requesting Addl Info Re Core Thermal Hydraulics + (ML17212A791)
- ML17212A792 + (ML17212A792)
- ML17212A806 + (ML17212A806)
- L-81-416, Informs of Progress Towards Implementing NUREG-0737 Item II.E.1.2 Safety-grade Equipment Associated W/Automatic Initiation of Auxiliary Feedwater Flow Will Be Installed During Current Refueling Outage + (ML17212A808)
- L-81-414, Notifies That Util Will Continue to Use Previously Submitted Proposed Inservice Insp Program Until 910201,subj to Restrictions in NRC + (ML17212A809)
- ML17212A810 + (ML17212A810)
- L-81-406, Responds to NRC Re Violations Noted in IE Investigation Rept 50-335/81-06.Corrective Actions: Procedure Revised to Require Verification of Actions in Util Responses to Nrc.Procedure Will Be Issued by 811001 + (ML17212A812)
- IR 05000335/1981006 + (ML17212A813)
- L-81-393, Requests That Info Re Identity of Employees & Positions in IE Investigation Rept 50-335/81-06 Be Withheld Per 10CFR2.790.Info Should Be Deleted as Shown in Encl marked-up Rept + (ML17212A813)
- ML17212A814 + (ML17212A814)
- ML17212A815 + (ML17212A815)
- ML17212A817 + (ML17212A817)
- ML17212A821 + (ML17212A821)
- L-81-392, Ack Receipt of IE Insp Rept 50-335/81-15,on 810622-0702. No Proprietary Info.Also Forwards Response to NRC Re Violation Noted in IE Insp Rept.Steps Taken to Store Records in Accordance W/Applicable Requirements + (ML17212A823)
- ML17212A824 + (ML17212A824)
- ML17212A825 + (ML17212A825)
- IR 05000335/1981015 + (ML17212A826)
- ML17212A836 + (ML17212A836)
- ML17212A837 + (ML17212A837)
- ML17212A839 + (ML17212A839)
- ML17212A843 + (ML17212A843)
- ML17212A845 + (ML17212A845)
- L-81-425, Application to Amend to App a of License DPR-67 Adding Limitations to Address Mode 5 Operation W/Rcs Partially Drained + (ML17212A850)
- ML17212A851 + (ML17212A851)
- ML17212A852 + (ML17212A852)
- ML17212A855 + (ML17212A855)
- L-81-428, Forwards Updated Interim Rept Re Review of Controls for Handling Heavy Loads Per NUREG-0612, Control of Heavy Loads at Nuclear Power Plants - Resolution of Tap A-36 + (ML17212A856)
- L-81-429, Forwards Itemized Review of Compliance W/Significant Rules & Regulations,Per 10CFR,in Response to NRC 810929 Request + (ML17212A861)
- L-81-426, Forwards Responses to NRC Requests for Addl Info Re Fsar. Responses Will Be Incorporated Into FSAR Amend + (ML17212A862)
- ML17212A864 + (ML17212A864)
- ML17212A865 + (ML17212A865)
- L-81-433, Forwards Response to Fire Protection Questions,Revision to Various 440 Series Questions & Revised FSAR Chapter 15, in Response to NRC Request for Addl Info.Responses Will Be Incorporated in Future FSAR Amend + (ML17212A874)