Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14252A893 + (ML14252A893)
- ML14252A898 + (ML14252A898)
- ML14252A901 + (ML14252A901)
- ML14252A905 + (ML14252A905)
- ML14252A910 + (ML14252A910)
- ML14253A006 + (ML14253A006)
- ML14253A014 + (ML14253A014)
- ML14253A015 + (ML14253A015)
- ML14253A016 + (ML14253A016)
- ML14253A048 + (ML14253A048)
- IR 05000298/2014202 + (ML14253A079)
- ML14253A117 + (ML14253A117)
- IR 05000313/2014009 + (ML14253A122)
- NL-14-002, Enclosure - NL-14-002, SAMA Engineering Project Cost Estimates Prepared by RCM Technologies + (ML14253A153)
- RNP-RA/14-0083, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14253A161)
- L-2014-243, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML14253A162)
- L-2014-277, Inservice Inspection Plan, RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 17 + (ML14253A182)
- L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) + (ML14253A184)
- ML14253A185 + (ML14253A185)
- CP-201401051, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14253A186)
- MNS-14-067, Third Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14253A187)
- MNS-14-066, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14253A188)
- ML14253A189 + (ML14253A189)
- ML14253A208 + (ML14253A208)
- RBG-47501, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14253A209)
- RBG-47502, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14253A210)
- CP-201401035, Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014) + (ML14253A211)
- L-2014-270, Response to Request for Additional Information Re License Amendment Request for Transition to 10CFR50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for LWR Generating Plants + (ML14253A216)
- RC-14-0142, Withdrawal of License Amendment Request LAR-13-02396, Request for NRC Approval of Radiation Emergency Plan Change + (ML14253A221)
- BSEP 14-0098, Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel + (ML14253A223)
- RBG-47503, Notification of Spent Fuel Cask Use + (ML14253A227)
- ML14253A262 + (ML14253A262)
- Information Notice 2013-13, Rev.1, Deficiencies With Effluent Radiation Monitoring System Instrumentation + (ML14253A270)
- Information Notice 2013-13, Rev.1, Deficiencies with Effluent Radiation Monitoring System Instrumentation + (ML14253A270)
- ML14253A288 + (ML14253A288)
- ML14253A303 + (ML14253A303)
- ML14253A313 + (ML14253A313)
- ML14253A316 + (ML14253A316)
- ML14253A317 + (ML14253A317)
- ML14253A318 + (ML14253A318)
- ML14253A319 + (ML14253A319)
- AEP-NRC-2014-59, Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3 + (ML14253A320)
- ML14253A321 + (ML14253A321)
- NL-14-106, 10 C.F.R. 50.59 Safety Evaluation and Supporting Analyses Prepared in Response to the Algonquin Incremental Market Natural Gas Project Indian Point Nuclear Generating Unit Nos. 2 & 3 + (ML14253A339)
- ML14253A378 + (ML14253A378)
- ML14253A380 + (ML14253A380)
- ML14253A388 + (ML14253A388)
- ML14253A397 + (ML14253A397)
- ML14253A408 + (ML14253A408)
- ML14253A422 + (ML14253A422)
- ML14253A477 + (ML14253A477)