Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NOC-AE-11002716, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) + (ML11238A071)
- ML11238A071 + (ML11238A071)
- NOC-AE-11002714, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) + (ML11238A072)
- ML11238A072 + (ML11238A072)
- HNP-11-067, License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis + (ML11238A077)
- ML11238A078 + (ML11238A078)
- Press Release-III-11-032, NRC Cites Perry Nuclear Plant for Issues Involving Radiological Controls + (ML11238A081)
- IR 05000373/2011403 + (ML11238A111)
- ML11238A118 + (ML11238A118)
- ML11238A119 + (ML11238A119)
- ML11238A120 + (ML11238A120)
- ML11238A136 + (ML11238A136)
- ML11238A158 + (ML11238A158)
- ML11238A160 + (ML11238A160)
- ML11238A254 + (ML11238A254)
- ML11238A261 + (ML11238A261)
- ML11238A262 + (ML11238A262)
- ML11238A263 + (ML11238A263)
- ML11238A264 + (ML11238A264)
- ML11238A266 + (ML11238A266)
- ML11238A267 + (ML11238A267)
- ML11238A270 + (ML11238A270)
- RNP-RA/10-0065, Independent Spent Fuel Storage Installation (ISFSI) Safety Analysis Report, Revision 22 - Chapter 9, Conduct of Operations + (ML11238A273)
- L-81-027, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EPIP 1.2 Re Notification of Emergency Response Organization & Offsite Agencies.Proprietary Info Withheld Per Generic Ltr 81-27 + (ML112410143)
- ML112410168 + (ML112410168)
- NG-82-1173, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Emergency Response Organization Notification List & Procedure EPIP 1.1 Re Determination of Emergency Action Level + (ML112410175)
- NG-82-1391, Forwards Public Version of Revised Emergency Plan Implementing Procedures EPIP 3.3b, Followup Dose Projections & EPIP 1.2, Notification of Emergency Response Organizations & Offsite Agencies + (ML112410183)
- LR-N11-0267, Work Hour Controls Before and After a Hurricane Emergency Declaration + (ML112410184)
- ML112410210 + (ML112410210)
- NG-82-2125, Forwards Public Version of Revision 3 to Emergency Plan. Receipt Form Encl + (ML112410222)
- NG-82-2303, Forwards Public Version of Revision 4 to Emergency Plan Implementing Procedure EPIP-2.2, Activation & Operation of Technical Support Ctr. Receipt Form Encl + (ML112410226)
- NG-83-0937, Forwards Public Version of Rev 4 to Emergency Plan App 3 & P N-2 + (ML112410240)
- NG-82-3140, Forwards Public Version of Rev 4 to Emergency Plan Implementing Procedure EPIP 3.3a, Manual Dose Projections & Rev 3 to EPIP 3.3b, Computerized Dose Projections. W/830824 Receipt Form + (ML112410284)
- NG-83-1933, Forwards Public Version of Revised Emergency Plan Implementing Procedures EPIP 3.3a Re Initial Dose Projections,Epip 3.3b Re Followup Dose Projections & EPIP 6.4 Re Emergency Preparedness Communications Testing + (ML112410287)
- NG-83-3535, Forwards Public Version of Rev 5 to Corporate Plan Implementing Procedures,Including Procedures CPIP-1.2 Re Corporate Notification & CPIP-1.3 Re Activation & Operation of Emergency Operations Facility + (ML112410292)
- NG-83-3579, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1 Re Determination of Emergency Action Level & EPIP 1.2 Re Notifications.Receipt Form Encl + (ML112410295)
- ML112410302 + (ML112410302)
- NG-83-3853, Forwards Public Version of Rev 5 to Emergency Plan Implementing Procedure EPIP 1.2 Re Notification & Rev 19 to Index + (ML112410407)
- ML112410442 + (ML112410442)
- GNRO-2011/00073, Request for Additional Information Regarding Extended Power Uprate + (ML112410566)
- 05000331/LER-1980-055-01, /01T-0:on 801110,main Steam Relief Valve Stuck Open Resulting in Rx Scram.Caused by Wiring Error During 1980 Design Change Work & Inadequate post-installation Testing.Error Corrected & Test Procedure Revised + (ML112410804)
- ML112410805 + (ML112410805)
- 05000331/LER-1981-002-03, /03L-0:on 810106,temp Switch Tis 4477,zone 2, Tripped Outside Tech Spec.Caused by Instrument Drift.Switch Recalibr + (ML112410871)
- ML112410872 + (ML112410872)
- 05000331/LER-1981-004-03, /03L-0:on 810111,drywell Particulate Radiation Monitor B Failed Downscale.Caused by Condensate on NMC Model RAK-221F Radiation Element Re 8101B.Design Review Initiated & Particulate & Iodine Filters Examined Daily + (ML112410873)
- ML112410874 + (ML112410874)
- 05000331/LER-1981-003-03, /03L-0:on 810108,drywell Particulate Radiation Element Re 8101B Found Inoperable.Caused by Sensor Failure Due to Condensation on Particulate Detector.New Radiation Element,Mylar Window & Beta Phosphor Installed + (ML112410878)
- ML112410879 + (ML112410879)
- 05000331/LER-1981-008-03, /03L-0:on 810212,during Preventive Maint, Recirculation Pump B Tripped Upon Restart,Recirculation Pump Motor Hi/Lo Oil Level Alarm Activated & Would Not Clear.Caused by Lack of Oil in Recirculation Pump Motor B + (ML112410898)
- ML112410899 + (ML112410899)
- 05000331/LER-1981-007-03, /03L-0:on 810219,during Normal Operation,Pressure Differential Across RHR Svc Water Strainer 1S-90B Read High, Resulting in Loop B Inoperability.Caused by Sand Plugged in Strainer Mesh.Strainer Cleaned + (ML112410900)