Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML092440544 + (ML092440544)
- Information Notice 2009-26, Spent Fuel Pool Neutron Absorbing Materials Degradation + (ML092440545)
- ML092440553 + (ML092440553)
- ML092440554 + (ML092440554)
- ML092440580 + (ML092440580)
- ML092440589 + (ML092440589)
- ML092440601 + (ML092440601)
- ML092440610 + (ML092440610)
- ML092440618 + (ML092440618)
- ML092440649 + (ML092440649)
- ML092440651 + (ML092440651)
- Press Release-09-144, NRC Announces Availability of License Renewal Applications for Salem and Hope Creek Nuclear Power Plants + (ML092440653)
- ML092440680 + (ML092440680)
- ML092440685 + (ML092440685)
- BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls + (ML092440704)
- ML092440721 + (ML092440721)
- ML092440755 + (ML092440755)
- 05000261/LER-2009-002, Failure to Complete Technical Specifications Required Action within the Allowed Completion Time + (ML092440761)
- BVY 09-053, Response to Regulatory Issue Summary 2009-11 + (ML092440762)
- L-PI-09-097, Supplemental Information Regarding Application for Renewed Operating Licenses + (ML092440763)
- HNP-09-088, Preparation and Scheduling of Operator Licensing Examinations + (ML092440764)
- DCL-09-051, Request to Be Considered Pilot Plant for Digital Instrumentation and Controls Interim Staff Guidance, DI&C-ISG-06, Task Working Group 6: Licensing Process + (ML092440765)
- LR-N09-0206, Special Report - North Plant Vent Radiation Monitoring System (RMS) + (ML092440789)
- 05000397/LER-2009-003, Manual Reactor Scram Due to a Fire Stemming from a Turbine Lube Oil Leak + (ML092440792)
- TMI-09-099, Submittal of Revision 12 of the Post-Defueling Monitored Storage Quality Assurance Plan + (ML092440797)
- L-2009-189, Issuance of Amendments Regarding Spent Fuel Boraflex Remedy and Request for Delay in Implementation + (ML092440802)
- 05000278/LER-2009-004, Regarding Inoperable Ventilation Fan Results in Condition Prohibited by Technical Specifications + (ML092440803)
- ML092440804 + (ML092440804)
- ML092440805 + (ML092440805)
- BYRON 2009-0092, Affirmation of 10 CFR 26, Subpart I, Implementation Prior to October 1, 2009 + (ML092450005)
- ML092450008 + (ML092450008)
- NL-09-1317, Supplemental Information for License Amendment Request to Revise Technical Specification Sections 5.5.9, Steam Generator (SG) Program and TS 5.6.10, Steam Generator Tube Inspection Report for Permanent Alternate Repair Criteria + (ML092450029)
- ML092450036 + (ML092450036)
- ML092450037 + (ML092450037)
- ML092450049 + (ML092450049)
- ML092450080 + (ML092450080)
- ML092450095 + (ML092450095)
- NL-09-1265, Response to RAI Related to License Amendment Request to Revise TS Sections 5.5.9, Steam Generator (SG) Program and TS 5.6.10,Steam Generator Tube Inspection Report for Permanent Alternate Repair Criteria + (ML092450101)
- ML092450107 + (ML092450107)
- ML092450108 + (ML092450108)
- ML092450109 + (ML092450109)
- ML092450118 + (ML092450118)
- ML092450233 + (ML092450233)
- IR 05000259/2009403 + (ML092450235)
- IR 05000327/2009403 + (ML092450247)
- ML092450274 + (ML092450274)
- ML092450276 + (ML092450276)
- ML092450278 + (ML092450278)
- HCH-2009-093, Submittal of Discharge Monitoring Report for July 2009 + (ML092450279)
- NG-09-0641, Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 1 of 2 + (ML092450294)
- ML092450325 + (ML092450325)