Search results
Jump to navigation
Jump to search
- Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc. ETAP Software Error in Transient Stability Program On June 26, 2024, Operation Technology2 KB (290 words) - 12:55, 24 November 2024
- include the entire UFSAR in portable document format (PDF), installation software that consists of Adobe Acrobat Reader (to access the PDF files), and an4 KB (568 words) - 01:36, 6 December 2024
- VERIFICATION OF SOFTWARE 4.1. VERIFICATION OF SOFTWARE REQUIREMENTS 4.2 VERIFICATION OF NEW SOFTWARE DESIGN 4.3 VERIFICATION OF PREVIOUSLY DEVELOPED SOFTWARE 4.4 VERIFICATION35 KB (5,483 words) - 10:07, 7 January 2025
- Electric and Gas Co. MCN47 PO Box 236 Hancock's Bridge, NJ 08038 C. Systems Software Specialist(s): Jack Southers Senior Engineer Public Service Electric and19 KB (3,132 words) - 23:59, 5 January 2025
- NEl/NUSMG 97-07, Nuclear Utility Year 2000 Readiness. The program applies to software, hardware and firmware whose failure due to a Y2K problem would prevent6 KB (824 words) - 18:43, 6 December 2024
- This software has been remediated and testing is underway but is not finished. The integrated testing is scheduled to be completed and the software is expected8 KB (1,199 words) - 18:43, 6 December 2024
- Creek Nuclear Generating Station. of the July 1,1999 letter, listed two software systems (i.e., ETUDE and j REM /AACS/CICO) that remained to be remediated3 KB (303 words) - 09:52, 3 December 2024
- include the entire UFSAR in portable document format (PDF), installation software that consists of Adobe Acrobat Reader (to access the PDF files), and an4 KB (540 words) - 09:30, 3 December 2024
- planned ERDS software change scheduled to take place February 15,1999. ) 10CFR50 Appendix E, Section VI.3.b requires planned hardware and software modifications2 KB (314 words) - 04:10, 8 December 2024
- program. TVA recognizes'that'as:the' software; change control: program' matures > improvements.will be made. The software.. change cont.rol; commitment" allows-for4 KB (495 words) - 16:44, 19 December 2024
- components along with software required to process all other channels in the affected racks. However, all LCP code has completed software l verification testing8 KB (1,186 words) - 17:02, 19 December 2024
- acronym for Significance Determination Process OR SDP is an acronym for Software Development Plan82 bytes (17 words) - 20:26, 27 March 2018
- design package (including Baseline % software) is expected from GENE on or about July 6,1999. The " Baseline 96" software package has been verified to be Year6 KB (909 words) - 18:44, 6 December 2024
- documentation associated with the DFCS software. Personnel involved with the change were unfamiliar with the DFCS software design and were highly reliant upon11 KB (1,540 words) - 00:20, 1 December 2017
- AP1000 Vogtle Unit 4 PMS Software Installation - Software Release 9.0.0.1 (Reference 11) and PMS Software Installation - Software Release 9.0.0.4 (Reference51 KB (8,385 words) - 02:41, 27 November 2024
- revision of software code. This change was in. the test secuence. processor analog input calibration routine. The final version of the affected software has also13 KB (2,815 words) - 17:10, 19 December 2024
- vendor software, networking software, real-time and batch programming software, telecommunications programming, process control and monitoring software, etc150 KB (24,665 words) - 05:09, 11 December 2024
- discovered error in the software which ' produces the report, it has been determined that the data calculated by,the: software for the " Cumulative Joint2 KB (239 words) - 03:27, 17 December 2024
- requirements. The staff also reviewed Westinghouse computer software requirements to ensure the software is in compliance with the ASME NQA 1 quality assurance107 KB (17,086 words) - 06:18, 10 January 2025
- and office automation software required for access to the CEI network r I b) Intranet access software c) Telnet and IBM host software d) Data applications4 KB (618 words) - 20:07, 2 December 2024