Search results

Jump to navigation Jump to search
Results 1 – 20 of 116,541
Advanced search

Search in namespaces:

  • RBG-48247, Reply to Notice of Violation; EA-23-055 (category Licensee Response to Enforcement Action)
    Will Be Taken Corrective actions are in place to determine a permanent solution to the E22-S003 transformer. Corrective Actions to Prevent Reoccurrence (CAPR)
    6 KB (946 words) - 01:47, 27 November 2024
  • ML24022A158 (category Licensee Response to Enforcement Action)
    Finding. The purpose of this letter is to provide the required written response to NOV 05000395/2023002-001, pursuant to 10 CFR 2.201. Attachment 1 provides
    6 KB (810 words) - 06:51, 25 November 2024
  • L-24-008, Reply to a Notice of Violation EA-2024-023 (category Licensee Response to Enforcement Action)
    Results Achieved In response to the potential violation debriefed on the DTF. The licensee took prompt actions: Corrective Action Program (CAP) Incident
    8 KB (1,134 words) - 12:05, 2 January 2025
  • Plant - Units 1 and 2 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 Enclosure Response to Apparent Violation in
    11 KB (1,676 words) - 05:42, 27 November 2024
  • Atlanta, GA 30303-1200 Joseph M. Farley Nuclear Plant - Units 1 and 2 Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101
    2 KB (239 words) - 12:07, 27 November 2024
  • RBG-48049, Reply to a Notice of Violation; EA-20-058 (category Licensee Response to Enforcement Action)
    information to ensure that licensee personnel are qualified to perform safety-related activities. This is a Severity Level IV violation (NRC Enforcement Policy
    7 KB (1,032 words) - 14:37, 29 November 2024
  • air. Contrary to the above, on May 28, 2021, the licensee failed to use, to the extent practical, process or other engineering controls to control the concentration
    21 KB (2,956 words) - 07:07, 25 November 2024
  • W3F1-2024-0041, Reply to a Notice of Violation, EA-24-052 (category Licensee Response to Enforcement Action)
    power operation primary to secondary pressure differential. Contrary to the above, on November 5, 2023, the licensee failed to ensure that all in-service
    13 KB (1,927 words) - 10:40, 24 November 2024
  • ML24026A057 (category Licensee Response to Enforcement Action)
    20852-2738 EA-23-118 - Missing NRC' s 90-day written response to Aerotest Operations, Inc. response to NRC Inspection Report 050-00228/2023-001 and dispute
    3 KB (320 words) - 20:40, 24 November 2024
  • Category:Letter type:SVP [Table view] Category:Licensee Response to Enforcement Action [Table view] Category:Licensee Response to Notice of Violation [Table view]
    704 bytes (0 words) - 03:32, 16 November 2024
  • ML24061A023 (category Licensee Response to Enforcement Action)
    dated 3/6/19 was submitted to the NRC, Mitch Wilkinson was the acting CFH supervisor from when the last operator left (10/1/19) to 10/9/2020 and Malcom McCarthy
    4 KB (592 words) - 19:52, 24 November 2024
  • Report 05000414/2017012; Enforcement Action 17-122 Corrective Actions Planned Interim Action - Implement an engineering change to replace EDG voltage regulator
    10 KB (1,494 words) - 08:09, 8 January 2025
  • ML23067A209 (category Licensee Response to Enforcement Action)
    MD 20852-2738 Response to Apparent Violations in NRC Special Inspection Report 05000602/2022201;EA-22-134 This letter is in response to the apparent violation
    9 KB (1,291 words) - 08:04, 27 November 2024
  • IR 05000327/2009007 (category Licensee Response to Enforcement Action)
    Category:Letter [Table view] Category:Licensee Response to Enforcement Action [Table view] Category:Licensee Response to Notice of Violation [Table view]
    784 bytes (0 words) - 00:25, 17 April 2019
  • ML20274A014 (category Licensee Response to Enforcement Action)
    Counsel (OGC) and that the action was based, at least in part, on the former employee engaging in protected activity. TVA Response to the Violation TVA disagrees
    28 KB (4,330 words) - 18:20, 29 November 2024
  • ML111230053 (category Licensee Response to Enforcement Action)
    individual to perform his assigned fire watch rounds and then deliberately document that the fire watch rounds were complete. Dominion's response to the Notice
    8 KB (1,118 words) - 06:36, 13 January 2025
  • ML20274A012 (category Licensee Response to Enforcement Action)
    adverse action, and that the action is consistent with action taken for similarly situated employees. The ERB process also considers negative impacts to a Safety
    36 KB (5,689 words) - 18:20, 29 November 2024
  • ML051730109 (category Licensee Response to Enforcement Action)
    Cooling to Normal Operating Lineup," to fill the ECCS suction lines with borated water prior to returning the system to a mode where it is required to be OPERABLE
    19 KB (3,039 words) - 18:11, 15 January 2025
  • ML16200A219 (category Licensee Response to Enforcement Action)
    Plan, and Responses to Phase 1 Interim Staff Evaluation Open Items in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable
    13 KB (1,978 words) - 21:51, 9 January 2025
  • ML041270486 (category Licensee Response to Enforcement Action)
    NPF-58 Reply to a Notice of Violation; EA-03-208 Ladies and Gentlemen: Enclosed is the reply to the Notice of Violation, EA-03-208, issued to the Perry Nuclear
    8 KB (1,256 words) - 03:09, 16 January 2025
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)