Browse wiki
Jump to navigation
Jump to search
ML21319A378 +
10 CFR 50.67 +, 10 CFR 50 Appendix A +, 10 CFR 100 +, 10 CFR 50 +, 10 CFR 50.36 +, 10 CFR 50.59 +, 10 CFR 50.4 +, 10 CFR 50.65 +, 10 CFR 50 Appendix G +, 10 CFR 50 Appendix H +, 10 CFR 50.55a +, 10 CFR 50.36#c2ii +, 10 CFR 50.65#a4 +, 10 CFR 50.59#d2 +, 10 CFR 50.55a#g +, 10 CFR 50.55a#g6i +, 10 CFR 50.48#c +, 10 CFR 50.48#a +, 10 CFR 31.5#c +, 10 CFR 31.5#c2ii +, 10 CFR 2.390#d1 +, 10 CFR 2.390#d +, 10 CFR 50.71#e + and 10 CFR 50.71#e4 +
RA-19-0007, License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications +, NLS-90-184 +, L-11 + and RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +
Duke Energy + and Maza K +
NRC Generic Letter 91-18, Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability +, NRC Generic Letter 85-19, Reporting Requirements on Primary Coolant Iodine Spikes + and NRC Generic Letter 90-03, Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2, "Vendor Interface for Safety-Related Components" +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +, RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes + and RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +
0.00116 d (0.0278 hours, 1.653439e-4 weeks, 3.805e-5 months) +, 8.333333e-4 d (0.02 hours, 1.190476e-4 weeks, 2.7396e-5 months) +, 3.472222e-5 d (8.333333e-4 hours, 4.960317e-6 weeks, 1.1415e-6 months) +, 2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months) +, 1.157407e-5 d (2.777778e-4 hours, 1.653439e-6 weeks, 3.805e-7 months) +, 6.944444e-5 d (0.00167 hours, 9.920635e-6 weeks, 2.283e-6 months) +, 0.00181 d (0.0433 hours, 2.579365e-4 weeks, 5.9358e-5 months) +, 1.851852e-4 d (0.00444 hours, 2.645503e-5 weeks, 6.088e-6 months) +, 9.027778e-4 d (0.0217 hours, 1.289683e-4 weeks, 2.9679e-5 months) +, 0.00162 d (0.0389 hours, 2.314815e-4 weeks, 5.327e-5 months) +, 0.00174 d (0.0417 hours, 2.480159e-4 weeks, 5.7075e-5 months) +, 1.388889e-4 d (0.00333 hours, 1.984127e-5 weeks, 4.566e-6 months) +, 3.472222e-4 d (0.00833 hours, 4.960317e-5 weeks, 1.1415e-5 months) +, 4.62963e-5 d (0.00111 hours, 6.613757e-6 weeks, 1.522e-6 months) + and 2.314815e-5 d (5.555556e-4 hours, 3.306878e-6 weeks, 7.61e-7 months) +
November 15, 2021 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
08:51:33, 7 February 2025 +
135 +
Request +
RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes + and RA-19-0007, License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications +
Regulatory Guide 1.183 +, Regulatory Guide 1.97 +, Regulatory Guide 1.25 +, Regulatory Guide 1.196 +, Regulatory Guide 1.27 +, Regulatory Guide 1.45 +, Regulatory Guide 1.93 +, Regulatory Guide 1.121 +, Regulatory Guide 1.160 +, Regulatory Guide 1.182 +, Regulatory Guide 1.99 + and Regulatory Guide 1.129 +
SR-4.7.1.2.1 +, SR-4.0.1 +, SR-4.0.3 +, SR-4.0.2 +, SR-4.0.4 +, SR-4.7.6.a +, SR-4.4.4.1 +, SR-2.1 +, SR-4.2.2.2.e +, SR-4.4.5.1 +, SR-4.4.5.2 +, SR-4.4.1.3.4 +, SR-4.2.2.2 +, SR-4.4.6.2.1 +, SR-4.4.4.2 +, SR-4.4.4.3 +, SR-4.2.3.2.b +, SR-4.2.3.2.c +, SR-4.4.4.1.b +, SR-4.7.6.b +, SR-4.7.6.g +, SR-4.7.6.d.1 +, SR-4.2.2.2.c +, SR-4.2.3.2.a +, SR-4.7.6.d.2 +, SR-4.4.4.1.a + and SR-4.2.2.2.d +
November 15, 2021 +
Steam Generator +, Reactor Coolant System +, Feedwater +, Service water +, Reactor Protection System +, Emergency Diesel Generator +, Main Steam Isolation Valve +, Auxiliary Feedwater +, Primary containment +, Main Turbine +, HVAC +, Reactor Pressure Vessel +, Residual Heat Removal +, Control Room Emergency Filtration System +, Remote shutdown +, Emergency Core Cooling System +, Decay Heat Removal +, Main Steam Line +, Control Room Envelope +, Control Rod + and Containment Spray +
TS-3.0.3 +, TS-3.7.4 +, TS-3.0.1 +, TS-3.5.2 +, TS-3.8.3.1 +, TS-3.6.2.1 +, TS-3.9.9 +, TS-3.0.4 +, TS-3.6.2.3 +, TS-3.4.5 +, TS-3.4.6.2 +, TS-3.4.8 +, TS-3.4.1.2 +, TS-3.4.6.1 +, TS-3.0.4.a +, TS-3.0.4.b +, TS-3.0.2 +, TS-3.0.6 +, TS-3.7.13 +, TS-3.4.1.4 +, TS-4.8.1.1 +, TS-3.8.3.2 +, TS-3.4.1.3 +, TS-3.4.1.1 +, TS-3.0.4.c +, TS-3.1.2.4 +, TS-3.4.9.4 +, TS-3.9.4.b + and TS-6.8.4.n +
Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes +
Safe Shutdown +, Boric Acid +, Shutdown Margin +, Ultimate heat sink +, Fire Barrier +, Anticipated operational occurrence +, Tornado Missile +, Internal Flooding +, Hydrostatic +, Past operability +, Probabilistic Risk Assessment +, Fire impairment +, Nondestructive Examination +, Incorporated by reference +, High Energy Line Break +, Missed surveillance +, Surveillance Frequency Control Program +, Stress corrosion cracking +, Loss of Offsite Power +, Operability Determination +, Maintenance Rule Program +, Turbine Missile +, Fuel cladding +, Pressure Boundary Leakage +, Offsite Circuit +, Power change +, Unidentified leakage +, Overspeed +, Operational leakage +, Water hammer +...
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
WCAP-10271 + and WCAP-13632-P-A +