Browse wiki
Jump to navigation
Jump to search
An apparent violation of Technical Specifi … An apparent violation of Technical Specification (TS) 3.8.4 was identified by the inspectors due to the licensees failure to maintain the train A and train B direct current electrical power subsystems operable while operating the reactor in Modes 1 through 4. Specifically, the licensee installed safety-related battery chargers which were susceptible to failure during certain design basis events. This issue was entered into the licensees corrective action program (CAP) as CAP 1250561. Upon identifying this issue, the licensee performed an operability evaluation and determined that the battery chargers remained operable because procedures were in place to recover the battery chargers if a failure occurred. After further interaction with the NRC, the licensee concluded that a designated operator position needed to be established to ensure that a specific individual would perform the battery charger recovery actions prior to the safety-related batteries being depleted. Long term corrective actions included replacing all four battery chargers. This finding was determined to be more than minor because it was associated with the design control and equipment performance attributes of the Mitigating Systems Cornerstone. In addition, this performance deficiency impacted the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors performed a Phase 1 SDP evaluation and determined that a Phase 2 evaluation was required because this finding represented an actual loss of safety function of a single train of equipment for greater than the TS allowed outage time. The inspectors performed a Phase 2 evaluation using the pre-solved SDP worksheets for Prairie Island and determined that this finding screened as Red. A Phase 3 SDP evaluation was required to assess reasonable credit for recovery by operators. The results of the Phase 3 SDP evaluation showed that this finding was preliminarily determined to be White for Unit 1, and Green for Unit 2. No cross-cutting aspect was assigned to this finding because licensee decisions made in regards to evaluating the performance of the battery chargers were made many years ago and therefore, not reflective of current plant performance.t reflective of current plant performance.
23:59:59, 30 June 2011 +
23:59:59, 30 June 2011 +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +, 05000282/FIN-2011010-01 +...
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:44:30, 21 February 2018 +
23:59:59, 30 June 2011 +