Semantic search
Jump to navigation
Jump to search
| Issue date | Title | |
|---|---|---|
| ML26044A157 | 25 February 2026 | SLR Audit Breakout Questions |
| ML26044A156 | 25 February 2026 | Aging Management Audit Report - Edwin I. Hatch, Units 1 and 2 - Subsequent License Renewal Application |
| NL-25-0421, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information, Set 1 | 22 December 2025 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information, Set 1 |
| ML25328A242 | 24 November 2025 | SLR - Request for Additional Information (Final Rev. 1) |
| ML25100A081 | 27 March 2025 | 20250327-Hatch-Pre-Application - Updated |
| ML25083A215 | 27 March 2025 | March 27, 2025 Hatch Pre-Submittal Public Meeting - Southern Slides |
| ML24352A167 | 13 November 2024 | Southern Company Presentation Slides |
| ML24313A105 | 13 November 2024 | November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) |
| NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 | 19 July 2024 | 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 |
| NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material | 22 July 2020 | 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material |
| ML17271A307 | 30 November 2017 | Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program |
| ML17010A374 | 10 January 2017 | Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 9 -Redacted |
| ML17010A361 | 10 January 2017 | Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 4 - Redacted |
| ML17010A336 | 10 January 2017 | Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 1 Redacted |
| ML16330A128 | 5 December 2016 | Request for Additional Information |
| ML16244A408 | 25 August 2016 | Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report. Part 2 of 22 |
| NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 22 | 25 August 2016 | Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 22 |
| ML15337A414 | 21 December 2015 | Safety Evaluation for High Density Polyethylene Piping Alternative HNP-ISI-ALT-HDPE-01 |
| NL-15-1628, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0, Final Stress Analysis for the Design of the Hdpe System | 3 September 2015 | Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0, Final Stress Analysis for the Design of the Hdpe System |
| ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 |
| IR 05000321/2013007 | 24 January 2014 | IR 05000321-13-007 & 05000366-13-007; 11/04/2013 - 12/13/2013; Edwin I. Hatch Nuclear Plant, Units 1, and 2; Post Approval Site Inspection for License Renewal |
| ML12355A631 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 |
| NL-12-2268, Edwin I. Hatch, Unit 1, SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 | 26 November 2012 | Edwin I. Hatch, Unit 1, SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
| NL-12-2269, SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 |
| NL-12-2269, SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
| ML12355A637 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
| NL-11-1812, Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and Control | 24 October 2011 | Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and Control |
| ML081200882 | 14 April 2008 | Notification of Potential Part 21 on Safety Related Noncompliance Deviation |
| ML071270284 | 30 April 2007 | Southern Nuclear Operating Company - Quality Assurance Topical Report, ANSI N18.7-1976 Conformance Matrix, Enclosure 5 |
| ML070640041 | 6 March 2007 | Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 |
| NL-06-2611, Request for Use of Radium Hurricane Hood Category-2 and Category-3 | 11 December 2006 | Request for Use of Radium Hurricane Hood Category-2 and Category-3 |
| ML070430092 | 20 November 2006 | E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan |
| ML062650312 | 1 September 2006 | Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) |
| NL-06-1042, NRC Generic Letter 2006-03 Response | 9 June 2006 | NRC Generic Letter 2006-03 Response |
| ML061600376 | 9 June 2006 | NRC Generic Letter 2006-03 Response |
| ML070430081 | 6 February 2006 | E. I. Hatch, Unit 1, Volume 1, Revision 1, Introduction Fourth Ten-Year Inservice Inspection Plan |
| ML053350002 | 6 January 2006 | Exemption MC6540, VT-3 Examination Containment Vent System |
| NL-05-1493, Third and Fourth 10-Year Interval Inservice Inspection Programs Submittal of Revised Exemption Request | 24 August 2005 | Third and Fourth 10-Year Interval Inservice Inspection Programs Submittal of Revised Exemption Request |
| NL-05-1372, Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request | 2 August 2005 | Third and Fourth 10-Year Interval Inservice Inspection Programs, Submittal of Revised Exemption Request |
| NL-05-0532, Third and Fourth 10-Year Interval Inservice Inspection Programs | 30 March 2005 | Third and Fourth 10-Year Interval Inservice Inspection Programs |
| NL-04-0563, Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension | 26 April 2004 | Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension |
| NL-03-0656, And Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310 | 7 May 2003 | And Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310 |
| HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 | 18 August 1999 | Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 |
| HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 | 30 July 1999 | Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 |
| ML20206P698 | 7 January 1999 | Ehnp Intake Structure Licensing Rept |
| ML20155C660 | 22 October 1998 | Safety Evaluation Supporting Amends 214 & 155 to Licenses DPR-57 & NPF-5,respectively |
| HL-5687, Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment | 19 October 1998 | Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment |
| ML20237D606 | 21 August 1998 | Forwards Draft SE Accepting Request to Increase Max Thermal Power from 2,558 Mwt to 2,763 Mwt,About 8 Percent Increase |
| NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
| ML20249A638 | 15 June 1998 | Summary of 980604 Meeting W/Listed Attendees in Rockville,Md to Discuss Containment Analysis for Extended Power Uprate for Plant,Units 1 & 2.Licensee Slides Encl |