Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22026A48922 March 2022Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary
ML21312A0349 November 2021Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting
ML21306A3169 November 2021Digital IC Presentation 11/09/2021
ML21272A30330 September 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report
ML21081A19230 June 2021Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment
RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials15 June 2021Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials
IR 05000458/20210015 May 2021RBS2021001-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2021001
ML21272A3381 April 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report
ML21011A0682 February 2021Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure
ML19308B10711 December 2019Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio)
ML19085A21729 March 2019Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019
CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 27 March 2019Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2
ML18345A34221 December 2018Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line
ML18267A3417 November 2018Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
ML18212A15131 July 2018License Renewal Safety Evaluation Report
ML18043A0088 February 2018Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10
ML17348B1428 January 2018RBS Scoping and Screening Audit Report
RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control15 November 2017Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
IR 05000458/201700313 November 2017NRC Integrated Inspection Report 05000458/2017003
ML17156A21418 September 2017Transmittal Letter Requesting Licensee Comments on OPC 2.206 Proposed DD
ML17226A13028 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 4, Section 4.1 Through Appendix 4B
ML17226A11828 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15C
ML17226A12628 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 3, Section 3.1 Through Appendix 3D
ML17226A14828 July 2017Revision 25 to the Updated Safety Analysis Report, Index
ML15187A12730 July 2015Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating
ML15156A86030 June 2015Safety Evaluation Input - Regarding Application for Change to Technical Specifications 3.8.1, AC Sources - Operating
ML14192A83111 December 2014Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation
RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating9 July 2014Application for Change to Technical Specification 3.8.1, AC Sources - Operating
ML14136A00818 June 2014Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions
RBG-47464, License Amendment Request - Response to NRC RAI, Changes to Technical Specification 2.1.1, Reactor Core SLs8 May 2014License Amendment Request - Response to NRC RAI, Changes to Technical Specification 2.1.1, Reactor Core SLs
ML14106A00015 April 2014NRR E-mail Capture - River Bend Station, Unit 1, Request for Additional Information Regarding Proposed Changes to TS 2.1.1, Reactor Core SLs
ML13322A4295 March 2014Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process
RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs28 May 2013License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs
ML13060A21029 March 2013Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain Functions
IR 05000458/201200513 February 2013IR 05000458-12-005, 09/29/2012 - 12/31/2012, River Bend Station; Integrated Resident & Regional Report; Adverse Weather Protection; Operability Evaluations and Functionality Assessments; Surveillance Testing; Follow-up of Events & Notices o
ML12277A3085 December 2012Issuance of Amendment No. 176, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III Bus
ML12107055730 May 2012Issuance of Amendment No. 174, Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants
RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases3 August 2011Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases
RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation27 July 2011License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation
ML1027901225 January 2011Issuance of Amendment No. 170, Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities
IR 05000458/20100035 August 2010IR 05000458-10-003 on 04/01/2010 - 06/30/2010 for River Bend Station, Integrated Inspection Report; Maintenance Risk Assessments and Emergent Work Control;,Operability Evaluations; Occupational Dose Assessment
ML09243014529 September 2009Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method
ML09154057024 June 2009Issuance of Amendment No. 163, Revise Technical Specification 3.7.5, Main Turbine Bypass System
ML08357019220 November 2008License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR)
ML08044029325 January 2008License Amendment Request, Main Turbine Bypass System
RBG-46771, Emergency License Amendment Request (LAR 2007-22) Local Power Range Monitor Surveillance Frequency Extension Request17 December 2007Emergency License Amendment Request (LAR 2007-22) Local Power Range Monitor Surveillance Frequency Extension Request
ML0731000821 November 2007Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR Calculation
ML0728303348 October 2007Notification of Potential Part 21 Report - Areva Minimum Critical Power Ratio
ML07222002230 August 2007Issuance of Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr).