Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
NRC Generic Letter 1994-02 | 11 July 1994 | NRC Generic Letter 1994-002: Long-Item Solutions and Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors |
NRC Generic Letter 1992-04 | 19 August 1992 | NRC Generic Letter 1992-004 - Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10 CFR 50.54(F) |
NRC Generic Letter 1990-06 | 25 June 1990 | NRC Generic Letter 1990-006: Resolution of Generic Issue, Power-Operated Relief Valve and Block Valve Reliability, and Generic Issue 94, Additional Low-Temp. Overpressure Protection for Light-Water Reactors, Pursuant to 10 CFR 50354 (F) |
NRC Generic Letter 1988-11 | 12 July 1988 | NRC Generic Letter 1988-011: NRC Position on Radiation Embrittlement of Reactor Vessel Materials and Its Impact on Plant Operations |
NRC Generic Letter 1979-56 | 30 October 1979 | NRC Generic Letter 1979-056: Discussion of Lessons Learned Short Term Requirements |
NRC Generic Letter 1979-50 | 10 October 1979 | NRC Generic Letter 1979-050: Transmittal of Document on the Basis for Emergency Actions Levels |
ML093421045 | 9 August 1979 | Requests Utils Provide Description of Methods to Verify That Offsite Power Sys & Onsite Distribution Sys Are Capable of Automatically Restarting & Maintaining All Required Safety Loads in Event of LOCA or Loss of Onsite or Offsite Power |
NRC Generic Letter 1979-03 | 18 January 1979 | NRC Generic Letter 1979-003: Submittal of Guidance on the General Contents of the Offsite Dose Calculation Manual to Aid in Its Preparation for NRC Approval |