Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22257A043 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML22257A040 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22257A039 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML22257A033 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML22257A028 | 8 September 2022 | Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement |
ML22257A026 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML22257A021 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML22257A017 | 8 September 2022 | Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement |
ML22257A016 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22257A015 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML22257A013 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 12, Radiation Protection |
ML22257A010 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML22257A005 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML22223A051 | 11 August 2022 | Report of Technical Specification Bases Changes |
ML22073A167 | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML22073A184 | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML22073A178 | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22073A176 | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML22073A172 | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML21306A316 | 9 November 2021 | Digital IC Presentation 11/09/2021 |
ML21312A034 | 9 November 2021 | Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting |
ML21272A303 | 30 September 2021 | Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report |
ML21081A192 | 30 June 2021 | Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment |
ML21272A338 | 1 April 2021 | Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report |
ML21011A068 | 2 February 2021 | Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure |
ML21039A338 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML21039A332 | 27 January 2021 | Updated Final Safety Analysis Report, Appendix a |
ML21039A331 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21039A330 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML21039A325 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML21039A320 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML21039A275 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management |
ML21039A255 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML21039A256 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 12, Radiation Protection |
ML21039A260 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML21039A265 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML21039A266 | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21039A267 | 27 January 2021 | Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement |
ML20344A057 | 10 December 2020 | Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors |
GNRO-2020/00022, Report of Technical Specification Bases Changes | 21 July 2020 | Report of Technical Specification Bases Changes |
ML20134H887 | 12 May 2020 | Technical Specification Bases 3.2 |
ML20134H867 | 12 May 2020 | Technical Specification Bases 2.0 |
ML19308B107 | 11 December 2019 | Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) |
ML19168A084 | 26 June 2019 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019 |
ML19084A218 | 23 May 2019 | Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control |
ML19085A217 | 29 March 2019 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 |
ML18215A196 | 12 March 2019 | Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals |
CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 | 7 March 2019 | Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 |
GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation | 23 January 2019 | Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation |
ML18085A579 | 26 March 2018 | Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals |