Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22257A0438 September 2022Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML22257A0408 September 2022Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22257A0398 September 2022Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML22257A0338 September 2022Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22257A0288 September 2022Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement
ML22257A0268 September 2022Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML22257A0218 September 2022Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML22257A0178 September 2022Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement
ML22257A0168 September 2022Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22257A0158 September 2022Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML22257A0138 September 2022Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML22257A0108 September 2022Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML22257A0058 September 2022Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22223A05111 August 2022Report of Technical Specification Bases Changes
ML22073A1678 March 2022Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22073A1848 March 2022Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML22073A1788 March 2022Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22073A1768 March 2022Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML22073A1728 March 2022Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML21306A3169 November 2021Digital IC Presentation 11/09/2021
ML21312A0349 November 2021Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting
ML21272A30330 September 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report
ML21081A19230 June 2021Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment
ML21272A3381 April 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report
ML21011A0682 February 2021Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure
ML21039A33827 January 2021Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML21039A33227 January 2021Updated Final Safety Analysis Report, Appendix a
ML21039A33127 January 2021Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML21039A33027 January 2021Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML21039A32527 January 2021Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML21039A32027 January 2021Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21039A27527 January 2021Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML21039A25527 January 2021Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21039A25627 January 2021Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML21039A26027 January 2021Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML21039A26527 January 2021Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML21039A26627 January 2021Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML21039A26727 January 2021Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement
ML20344A05710 December 2020Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors
GNRO-2020/00022, Report of Technical Specification Bases Changes21 July 2020Report of Technical Specification Bases Changes
ML20134H88712 May 2020Technical Specification Bases 3.2
ML20134H86712 May 2020Technical Specification Bases 2.0
ML19308B10711 December 2019Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio)
ML19168A08426 June 2019Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019
ML19084A21823 May 2019Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control
ML19085A21729 March 2019Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019
ML18215A19612 March 2019Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals
CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 27 March 2019Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2
GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation23 January 2019Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation
ML18085A57926 March 2018Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals