Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N928 | 20 October 1999 | Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised | |
ML20217H363 | 14 October 1999 | Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su | |
ML18152A281 | 12 October 1999 | Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. | Liquid penetrant |
ML20212J925 | 1 October 1999 | Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant | VT-2 |
NPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with | |
ML20217D685 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20212D596 | 15 September 1999 | Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 | Hot Short High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake Fire Protection Program |
ML20211N261 | 8 September 1999 | Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable | |
NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with | |
ML20216E501 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with | |
ML20211J256 | 31 August 1999 | Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 | |
ML20211J242 | 31 August 1999 | Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 | Earthquake |
ML20210T079 | 13 August 1999 | Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable | |
NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with | 31 July 1999 | Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with | |
ML20210Q993 | 31 July 1999 | Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud | |
ML20210S141 | 31 July 1999 | Monthly Operating Repts for July 1999 for North Anna Power Station.With | |
ML20209E564 | 30 June 1999 | Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With | |
ML20209D269 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 | |
ML20196J425 | 30 June 1999 | Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 | |
ML20196F334 | 22 June 1999 | Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 | |
ML20195F978 | 10 June 1999 | Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Operability Determination Liquid penetrant Overspeed trip |
ML20195G190 | 31 May 1999 | Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with | |
NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with | |
ML20209D275 | 31 May 1999 | Revised MORs for May 1999 for Pbnps,Units 1 & 2 | |
ML20206L483 | 10 May 1999 | SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping | Probabilistic Risk Assessment Incorporated by reference |
ML20206Q667 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With | |
NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With | |
ML20196F352 | 30 April 1999 | Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) | Shutdown Margin Earthquake Fuel cladding |
ML20205S039 | 21 April 1999 | SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) | Nondestructive Examination VT-2 Flow Accelerated Corrosion Moisture barrier |
NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with | |
ML20205K304 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20207K592 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With | |
NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with | |
ML20207D675 | 22 February 1999 | Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars | |
ML20207E173 | 18 February 1999 | Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year | |
ML20206R900 | 13 January 1999 | SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 | Non-Destructive Examination Nondestructive Examination |
NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with | 31 December 1998 | 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Packing leak Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Hydrostatic Coatings Temporary Modification Zebra Mussel High Energy Line Break Foreign Material Exclusion Flow Accelerated Corrosion Process Control Program Stress corrosion cracking Eddy Current Testing Operability Determination Earthquake Biofouling Liquid penetrant Fire Protection Program Fire Watch Flow Induced Vibration Overspeed trip Water hammer |
NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with | Safe Shutdown Missed surveillance |
ML20205A024 | 31 December 1998 | Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Stroke time Post Accident Monitoring Hydrostatic Enforcement Discretion Coatings Temporary Modification Aging Management Foreign Material Exclusion Feedwater Heater Stress corrosion cracking License Renewal Exemption Request Earthquake Pressure Boundary Leakage Fire Protection Program Overspeed trip |
ML20199C878 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20198C767 | 10 December 1998 | Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 | Incorporated by reference |
ML20198H954 | 3 December 1998 | Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant | Time of Discovery Non-Destructive Examination Nondestructive Examination Through-Wall Leak |
ML20198J556 | 3 December 1998 | ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps | |
NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | Enforcement Discretion |
ML20197G855 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20195J510 | 16 November 1998 | Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program | |
ML20198J594 | 3 November 1998 | 1998 Graded Exercise,Conducted on 981103 | Boric Acid Health Physics Network High Radiation Area Safe Shutdown Earthquake Chernobyl Fuel cladding Power change Siren Overspeed trip Potassium iodide |
ML20196G138 | 3 November 1998 | Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit | Time of Discovery Non-Destructive Examination Nondestructive Examination Through-Wall Leak |
ML20195D057 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With | |
NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With |