 Issue dateTitleTopic
ML20217N92820 October 1999Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised
ML20217H36314 October 1999Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su
ML18152A28112 October 1999Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619.Liquid penetrant
ML20212J9251 October 1999Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for PlantVT-2
NPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with30 September 1999Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with
ML20217D68530 September 1999Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With
ML20212D59615 September 1999Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20Hot Short
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Earthquake
Fire Protection Program
ML20211N2618 September 1999Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable
NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with31 August 1999Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with
ML20216E50131 August 1999Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with
ML20211J25631 August 1999Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2
ML20211J24231 August 1999Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2Earthquake
ML20210T07913 August 1999Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable
NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with31 July 1999Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with
ML20210Q99331 July 1999Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud
ML20210S14131 July 1999Monthly Operating Repts for July 1999 for North Anna Power Station.With
ML20209E56430 June 1999Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With
ML20209D26930 June 1999Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2
ML20196J42530 June 1999Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02
ML20196F33422 June 1999Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2
ML20195F97810 June 1999Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1Boric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Operability Determination
Liquid penetrant
Overspeed trip
ML20195G19031 May 1999Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with
NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with31 May 1999Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with
ML20209D27531 May 1999Revised MORs for May 1999 for Pbnps,Units 1 & 2
ML20206L48310 May 1999SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 PipingProbabilistic Risk Assessment
Incorporated by reference
ML20206Q66730 April 1999Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With
NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With
ML20196F35230 April 1999Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power)Shutdown Margin
Earthquake
Fuel cladding
ML20205S03921 April 1999SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii)Nondestructive Examination
VT-2
Flow Accelerated Corrosion
Moisture barrier
NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with31 March 1999Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with
ML20205K30431 March 1999Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With
ML20207K59228 February 1999Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With
NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with28 February 1999Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with
ML20207D67522 February 1999Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars
ML20207E17318 February 1999Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year
ML20206R90013 January 1999SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2Non-Destructive Examination
Nondestructive Examination
NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with31 December 19981998 Annual Results & Data Rept for Pbnps,Units 1 & 2. withSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Tornado Missile
Hydrostatic
Coatings
Temporary Modification
Zebra Mussel
High Energy Line Break
Foreign Material Exclusion
Flow Accelerated Corrosion
Process Control Program
Stress corrosion cracking
Eddy Current Testing
Operability Determination
Earthquake
Biofouling
Liquid penetrant
Fire Protection Program
Fire Watch
Flow Induced Vibration
Overspeed trip
Water hammer
NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with31 December 1998Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. withSafe Shutdown
Missed surveillance
ML20205A02431 December 1998Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).WithSafe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Stroke time
Post Accident Monitoring
Hydrostatic
Enforcement Discretion
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Feedwater Heater
Stress corrosion cracking
License Renewal
Exemption Request
Earthquake
Pressure Boundary Leakage
Fire Protection Program
Overspeed trip
ML20199C87831 December 1998Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With
ML20198C76710 December 1998Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2Incorporated by reference
ML20198H9543 December 1998Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for PlantTime of Discovery
Non-Destructive Examination
Nondestructive Examination
Through-Wall Leak
ML20198J5563 December 1998ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps
NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.WithEnforcement Discretion
ML20197G85530 November 1998Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With
ML20195J51016 November 1998Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program
ML20198J5943 November 19981998 Graded Exercise,Conducted on 981103Boric Acid
Health Physics Network
High Radiation Area
Safe Shutdown Earthquake
Chernobyl
Fuel cladding
Power change
Siren
Overspeed trip
Potassium iodide
ML20196G1383 November 1998Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each UnitTime of Discovery
Non-Destructive Examination
Nondestructive Examination
Through-Wall Leak
ML20195D05731 October 1998Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With
NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With31 October 1998Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With