Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 | 25 April 2022 | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 | Subsequent License Renewal |
ML21354A751 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 6 of 18 | |
ML21354A752 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 7 of 18 | |
ML21354A753 | 20 December 2021 | Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18 | Incorporated by reference |
ML21126A303 | 10 May 2021 | Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs) | |
ML21083A139 | 22 March 2021 | Strategy 1 | |
ML21083A137 | 22 March 2021 | NEIMA Reporting | |
ML21083A138 | 22 March 2021 | Rulemaking | |
ML21083A140 | 22 March 2021 | Strategy 2 | |
ML21083A141 | 22 March 2021 | Strategy 3 | |
ML21083A143 | 22 March 2021 | Strategy 5 | |
ML21083A144 | 22 March 2021 | Strategy 6 | |
ML21083A142 | 22 March 2021 | Strategy 4 | |
ML20365A070 | 30 December 2020 | Schedule Change to Open Phase Condition Detection Implementation | Open Phase Condition |
ML20318A386 | 13 November 2020 | Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic | Exemption Request Pandemic Coronavirus |
W3F1-2019-0001, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | 25 April 2019 | Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | License Renewal Power Uprate |
ML17347A127 | 20 December 2017 | Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) | Aging Management License Renewal |
ML16012A391 | 3 February 2016 | Schedule Revision for the Review of the Grand Gulf Nuclear Station, License Renewal Application | Aging Management License Renewal |
ML13297A250 | 30 October 2013 | Schedule Revision for the Environmental Review of the Grand Gulf Nuclear Station License Renewal Application | Aging Management License Renewal |
ML13002A430 | 26 February 2013 | Revision of Schedule for the Conduct of a Review of the Grand Gulf Nuclear Station, License Renewal Application | Aging Management License Renewal |
ML122640058 | 20 September 2012 | NFPA 805 SE Schedule - September 2012 | |
ML12242A545 | 7 September 2012 | Revision of Schedule for the Conduct of Review of the Grand Gulf Nuclear Station, LRA | Aging Management License Renewal |
ML11335A340 | 16 December 2011 | Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for Gulf Nuclear Station, Uni | Aging Management License Renewal Exemption Request Power Uprate |
GNRO-2011/00068, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination | 17 August 2011 | Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination | Generic Fundamentals Examination |
CNRO-2011-00003, Unit 1, Updated Schedule of Submittal of Future License Renewal Applications | 22 June 2011 | Unit 1, Updated Schedule of Submittal of Future License Renewal Applications | |
RBG-47153, Response to Regulatory Issue Summary 2011-04 | 15 June 2011 | Response to Regulatory Issue Summary 2011-04 | Generic Fundamentals Examination |
ML11137A201 | 17 May 2011 | Generator Inspection Conference Call | |
W3F1-2006-0047, Response to NRC RIS-2006-15, Preparation and Scheduling of Operator License Examinations | 14 September 2006 | Response to NRC RIS-2006-15, Preparation and Scheduling of Operator License Examinations | Generic Fundamentals Examination |