 Start date
RIS 2001-15, Update of Evacuation Time Estimates Performance of DC-Powered Motor-Operated Valve Actuators1 August 2001
RIS 2001-16, Update of Evacuation Time Estimates1 August 2001
RIS 2001-17, Withdrawn NRC Regulatory Issue Summary 2001-017: Preparation and Scheduling of Operator Licensing Exams22 August 2001
RIS 2001-18, Requirements for Oath or Affirmation22 August 2001
RIS 2001-20, Attachment 1 - NRC Inspection Manual Part 9900: Technical Guidance, Operations - Notices of Enforcement Discretion2 November 2001
RIS 2001-21, Withdrawn NRC Regulatory Issue Summary 2001-021: Licensing Action Estimates for Operating Reactors16 November 2001
RIS 2001-22, Attributes of a Proposed No Significant Hazards Consideration Determination20 November 2001
RIS 2001-23, Resetting Fault Exposure Hours for Safety System Unavailability Performance Indicators3 December 2001
RIS 2001-24, Status of Receipt of NRC Mail Following the Closing of the Brentwood Postal Facility6 December 2001
RIS 2001-25, NEI 99-02, Revision 2: Voluntary Submission of Performance Indicator Data12 December 2001
RIS 2002-01, Changes to NRC Participation in the International Nuclear Event Scale14 January 2002
RIS 2002-02, Lessons Learned Related to Recently Submitted Decommissioning Plans and License Termination Plans16 January 2002
RIS 2002-03, Guidance for Submitting Measurement Uncertainty Recapture Power Uprate Applications31 January 2002
RIS 2002-04, Results of the Pilot Test of the Proposed Changes to The Unplanned Scrams Performance Indicatolr and Thescrams with Loss of Normal Heat Removal Performance Indicator1 March 2002
RIS 2002-04, Results of the Pilot Test of the Proposed Changes to the Unplanned Scrams Performance Indicatolr and Thescrams with Loss of Normal Heat Removal Performance Indicator1 March 2002
RIS 2002-05, NRC Approval of Boiling Water Reactor Pressure Vessel Integrated Surveillance Program8 April 2002
RIS 2002-06, Withdrawn NRC Regulatory Issue Summary 2002-06, Evaluating Occupational Dose for Individuals Exposed to NRC-Licensed Material and Medical X-rays16 April 2002
RIS 2002-07, Subject, Clarification of NRC Requirements Applicable to Worker Fatigue and Self-Declarations of Fitness-For-Duty10 May 2002
RIS 2002-08, Withdrawn NRC Regulatory Issue Summary 2002-008: Availability of the Topical Report Program Description and Status of Staff Reviews on the NRC Web Site22 May 2002
RIS 2002-09, Withdrawn NRC Regulatory Issue Summary 2002-009: Preparation and Scheduling of Operator Licensing Examinations6 June 2002
RIS 2002-10, Revision of the Skin Dose Limit in 10CFR Part 209 July 2002
RIS 2002-11, Requalification Program Test Results for Okonite Okolon Single-Conductor Bonded-Jacket Cable (Followup to Regulatory Issue Summary 2002-025)9 August 2002
RIS 2002-12, NRC Regulatory Issue Summary 2002-0121, Transportation of Spent Nuclear Fuel Greater than 100 Grams NRC Threat Advisory and Protective Measures System19 August 2002
RIS 2002-12, NRC Regulatory Issue Summary 2002-12l Revision 1 Panoramic And Underwater Irradiators24 August 2011
RIS 2002-12A, Power Reactors NRC Threat Advisory and Protective Measures System19 August 2002
RIS 2002-12B, Research and Test Reactors NRC Threat Advisory and Protective Measures System9 September 2002
RIS 2002-12C, NRC Regulatory Summary 2002-012C, Decommissioning Power Reactors and Independent Spent Fuel Storage Installations Using Wet Storage NRC Threat Advisory and Protective Measures System19 August 2002
RIS 2002-12D, Independent Spent Fuel Storage Installations Using Dry Storage NRC Threat Advisory and Protective Measures System16 October 2002
RIS 2002-12E, Category I Fuel Facilities - NRC Threat Advisory and Protective Measures System19 August 2002
RIS 2002-12F, Category III Fuel Facilities NRC Threat Advisory & Protective Measures System29 January 2003
RIS 2002-12F, Category Iii Fuel Facilities NRC Threat Advisory & Protective Measures System12 March 2002
29 January 2003
24 August 2011
RIS 2002-12G, Conversion Facility - NRC Threat Advisory and Protective Measures System19 August 2002
RIS 2002-12H, Gaseous Diffusion Plants NRC Threat Advisory and Protective Measures System19 August 2002
RIS 2002-12I, Rev. 1: Transporation of Spent Nuclear Fuel Greater than 100 Grams - NRC Threat Advisory and Protection Measures System3 October 2002
RIS 2002-12I, Transportation of Spent Nuclear Fuel Greater Than 100 Grams24 August 2011
RIS 2002-12L, Panoramic and Underwater Irradiator Licensees NRC Threat Advisory and Protective Measures System5 June 2003
RIS 2002-12M, For Manufacturing and Distribution Licensees, NRC Threat Advisory and Protective Measures System12 January 2004
RIS 2002-12M, for Manufacturing and Distribution Licensees, NRC Threat Advisory and Protective Measures System12 January 2004
RIS 2002-13, Confirmation of Employment Eligibility27 August 2002
RIS 2002-14, Proposed Changes to the Safety System Unavailability Performance Indicators30 September 2002
RIS 2002-15, OMB Control No.: 3150-0002 NRC Regulatory Issue Summary 2002-15 NRC Approval of Commercial Data Encryption Systems for the Electronic Transmission of Safeguards Information28 August 2002
RIS 2002-16, Current Incident Response Issues13 September 2002
RIS 2002-17, Guidance on Performing Military Service Verification19 September 2002
RIS 2002-18, Issuance of Orders Imposing Additional Physical Protection Measures for the Transportation of Spent Nuclear Fuel Greater than 100 Grams3 October 2002
RIS 2002-19, New Modalities To Be Regulated Under 10 CFR 35.100021 October 2002
RIS 2002-19, New Modalities to Be Regulated Under 10 CFR 35.100021 October 2002
RIS 2002-20, Clarification of Requirements Under 10 CFR 35.432, Calibration Measurements of Brachytherapy Sources7 November 2002
RIS 2002-21, National Guard and Other Emergency Responders Located in the Licensees Controlled Area8 November 2002
RIS 2002-22, 03/14/2018--Summary of a Category 3 Public Meeting Held with External Stakeholders to Provide an Opportunity for Discussion on Draft Regulatory Issue Summary 2002-22, Supplement 1, Clarification on Endorsement of Nuclear Energy Institute12 June 2018
RIS 2002-22, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems31 May 2018