Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K764 | 27 September 1999 | Rev 0 to DCR 990247, Containment Overpressure Duration Requirement (Addendum to Calculation QDC-1000-M-0781) | |
ML20217K744 | 23 April 1999 | Rev 1 to QDC-0010-M-0396, Quad Cities Station Unit 2:ECCS Strainer Head Loss Estimates | |
ML20155A674 | 29 September 1998 | Rev 1 to Calculation QDC-1000-M-0454, Short Term Rhr/Core Spray Pump NPSH Analysis - Design Basic Loca | |
ML20155B522 | 29 September 1998 | Rev 1 to QDC-1000-M-0535, Long-Term Rhr/Core Spray Pump NPSH Analysis - Design Basis Loca | |
ML20199K604 | 3 December 1996 | Rev 1 to 93C2806.3-C002, Cable Tray & Conduit Raceway Limited Analytical Review (LAR) for USI A-46 at Quad Cities Nuclear Station. Page 71 of 98 of Incoming Submittal Not Included | Safe Shutdown |
ML20101Q754 | 8 April 1996 | Rev 3 to Calculation 9200-E0-S,demonstrating That Reduction of Torsional Loads from Auxiliary Steel Will Significantly Reduce IC Values for Beam & Connections | |
ML20106J792 | 4 April 1996 | Calculation for Checking Functional Status of Beam B4 & Cheek Plate Connection at Right End of Beam B10 in Quad Cities,Unit 1 Southeast,Rhr Corner Room | |
ML20101Q058 | 30 March 1996 | Flaw Evaluation for 02BS-F14 Weld in Quad Cities Unit 1 Loop B Recirculation Sys | |
ML20101Q048 | 19 March 1996 | Flaw Evaluation for 02AS-S4 Weld in Quad Cities Unit 1 Loop a Recirculation Sys | Stress corrosion cracking |
ML20101Q027 | 18 March 1996 | Flaw Evaluation for 02AS-F2 Weld in Quad Cities Unit 1 Loop a Recirulation Sys | Stress corrosion cracking |
ML20101Q036 | 11 March 1996 | Flaw Evaluation for 02AD-F12 Weld in Quad Cities Unit 1 Loop a Recirculation Sys | Liquid penetrant |
ML20086E089 | 3 July 1995 | Shroud Head Contact on Upper Support | Finite Element Analysis |
ML20091G346 | 15 June 1995 | Rev 0 to Shroud Repair Program for Quad Cities Unit 2, Shroud Head Contact on Upper Support | |
ML20091G356 | 15 June 1995 | Rev 0 to Shroud Repair Program for Quad Cities Unit 2, Shroud Head Contact on Upper Support | |
ML20101E816 | 22 November 1993 | Power Recovery Probabilities for Quad Cities Ipe | High winds |
ML20126G102 | 17 December 1992 | Rev 0 to RSA-D-92-07, LPCI Room Temperature Response Due to Loss of Room Cooler at Dresden Station | |
ML20058M164 | 18 November 1992 | Quad-Cities 2/I Safety-Related Continuous Load Running/ Starting Voltages | |
ML20058M145 | 31 July 1992 | Quad-Cities 1/I Safety-Related Continuous Load Running/ Starting Voltages | |
ML20101Q766 | 16 June 1992 | RHR Pump 1C/1D Discharge Line 1-1008B-18 | |
ML20058M171 | 20 May 1992 | Second-Level Undervoltage Relay Setpoint | |
ML20058M158 | 4 May 1992 | Quad-Cities 1/II Safety-Related Continuous Load Running/ Starting Voltages | |
ML20058M154 | 20 April 1992 | Evaluation of Toshiba Dgcwp Starting Voltage | |
ML20058M149 | 15 April 1992 | Evaluation of 460-Volt Diesel Generator Cooling Pump Min Starting Voltage | |
ML20058M167 | 15 April 1992 | Quad-Cities 2/II Safety-Related Continuous Load Running/ Starting Voltages | |
ML20058M174 | 3 April 1992 | Evaluation of DG 2 Cooling Water Pump Cooler Fan a & B Min Starting Voltage | |
ML20065S869 | 16 November 1990 | Draft Setpoint Calculation for RPS Turbine Control Valve Fast Closure Trip Function | |
ML20247M283 | 11 January 1988 | Rev 1 to Quad Cities,Control Room Dose Analysis,Plot of Dose as Function of Standby Gas Treatment Sys Effluent | |
ML20247M319 | 24 September 1987 | Control Room Dose Analysis, (Suppl to Dose Calculation 546Y-M-07) | |
ML20247M289 | 1 April 1987 | Infiltration Analysis |