Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval20 August 2024Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval
RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information31 July 2024Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related InformationFLEX
RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions12 July 2024Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document RevisionsPandemic
Coronavirus
Siren
RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-2214 June 2024Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22
RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations14 June 2024Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations
RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed6 June 2024Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-InformedProbabilistic Risk Assessment
RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors28 May 2024Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Missile Protection
Large early release frequency
Earthquake
Turbine Missile
Biofouling
Failure to Scram
Overspeed
Control Room Habitability
RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report17 May 20242023 Corporate Regulatory Commitment Change Summary ReportMururoa
RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion10 May 2024Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended CompletionProbabilistic Risk Assessment
RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation9 May 2024Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation InstrumentationHigh Energy Line Break
Power Uprate
RS-24-046, 10 CFR 50.46 Annual Report6 May 202410 CFR 50.46 Annual ReportGNF3
RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests30 April 2024Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests
RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion5 April 2024Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended CompletionReactor Vessel Water Level
Probabilistic Risk Assessment
B.5.b
Scram Discharge Volume
Subsequent actuation
RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222 April 2024Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22Liquid penetrant
RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report1 April 2024Constellation Energy Generation, LLC - Annual Property Insurance Status Report
RS-24-031, Updated Safety Analysis Report (Usar), Revision 231 April 2024Updated Safety Analysis Report (Usar), Revision 23Safe Shutdown
Time to boil
Temporary Modification
Fire Watch
GNF3
RS-24-023, Report on Status of Decommissioning Funding.22 March 2024Report on Status of Decommissioning Funding.License Renewal
RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF19 March 2024Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTFSafe Shutdown
Reactor Vessel Water Level
Tornado Missile
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
Significance Determination Process
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
Offsite Circuit
Very Early Warning Fire Detection
Control Room Habitability
RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS15 March 2024Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBSExemption Request
Control of Heavy Loads
RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations14 March 2024Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of OperationsAging Management
License Renewal
Exemption Request
Subsequent License Renewal
RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2148 March 2024Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214Exemption Request
RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval29 February 2024Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval
RS-24-017, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS23 February 2024Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBSExemption Request
Fuel cladding
RS-24-005, Additional Information Supporting Request for Partial Site Release8 February 2024Additional Information Supporting Request for Partial Site ReleaseOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval3 January 2024Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection IntervalVT-2
Intergranular Stress Corrosion Cracking
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days15 December 2023Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysHigh winds
Mission time
Tornado Missile
FLEX
B.5.b
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
Overspeed trip
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days13 December 2023Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysSafe Shutdown
Arc flash
FLEX
Missed surveillance
Surveillance Frequency Control Program
Offsite Circuit
RS-23-121, Sixth Ten-Year Interval Inservice Testing Program30 November 2023Sixth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Packing leak
High Radiation Area
Grab sample
Stroke time
Squib
Incorporated by reference
Locked High Radiation Area
Surveillance Frequency Control Program
Local Leak Rate Testing
Scram Discharge Volume
Intergranular Stress Corrosion Cracking
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation17 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval8 November 2023Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection IntervalNondestructive Examination
VT-2
RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 2620 October 2023Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26Safe Shutdown
Aging Management
Flow Accelerated Corrosion
License Renewal
GNF3
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 October 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans12 October 2023Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans
RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station7 September 2023Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power StationAccident Tolerant Fuel
GNF3
RS-23-089, Sixth Ten-Year Interval Inservice Testing Program5 September 2023Sixth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Packing leak
High Radiation Area
Stroke time
Squib
Incorporated by reference
Locked High Radiation Area
Missed surveillance
Surveillance Frequency Control Program
Local Leak Rate Testing
Scram Discharge Volume
Intergranular Stress Corrosion Cracking
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR30 August 2023Application to Adopt TSTF-564, Safety Limit MCPRReactor Vessel Water Level
Anticipated operational occurrence
Minimum Critical Power Ratio
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
GNF3
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs30 August 2023Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRsShutdown Margin
Surveillance Frequency Control Program
RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval28 August 2023Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval
RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation21 August 2023Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation InstrumentationSafe Shutdown
Reactor Vessel Water Level
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
High Energy Line Break
Earthquake
Recently irradiated fuel
Power Uprate
RS-23-085, Supplemental Information Related to Request for Partial Site Release3 August 2023Supplemental Information Related to Request for Partial Site Release
RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times16 June 2023Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations16 June 2023Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b8 June 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Mission time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Zebra Mussel
FLEX
B.5.b
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Large early release frequency
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
Biofouling
Offsite Circuit
Failure to Scram
Overspeed
Subsequent actuation
Control Room Habitability
RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors8 June 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Turbine Missile
Biofouling
Seismic Walkdown Report
Overspeed
Control Room Habitability
RS-23-073, Request for Partial Site Release7 June 2023Request for Partial Site ReleaseOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling25 May 2023Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingHydrostatic
Surveillance Frequency Control Program
Water hammer
RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel16 May 2023Supplement to License Amendment Request Regarding Transition to GNF3 FuelGNF3
RS-22-067, 10 CFR 50.46 Annual Report4 May 202310 CFR 50.46 Annual ReportGNF3
RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell28 April 2023Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and ShellNondestructive Examination