RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval | 20 August 2024 | Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval | |
RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information | 31 July 2024 | Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information | FLEX |
RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions | 12 July 2024 | Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions | Pandemic Coronavirus Siren |
RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 | 14 June 2024 | Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 | |
RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations | 14 June 2024 | Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations | |
RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed | 6 June 2024 | Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed | Probabilistic Risk Assessment |
RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 28 May 2024 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado Missile Protection Large early release frequency Earthquake Turbine Missile Biofouling Failure to Scram Overspeed Control Room Habitability |
RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report | 17 May 2024 | 2023 Corporate Regulatory Commitment Change Summary Report | Mururoa |
RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion | 10 May 2024 | Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion | Probabilistic Risk Assessment |
RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation | 9 May 2024 | Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation | High Energy Line Break Power Uprate |
RS-24-046, 10 CFR 50.46 Annual Report | 6 May 2024 | 10 CFR 50.46 Annual Report | GNF3 |
RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests | 30 April 2024 | Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests | |
RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion | 5 April 2024 | Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion | Reactor Vessel Water Level Probabilistic Risk Assessment B.5.b Scram Discharge Volume Subsequent actuation |
RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 | 2 April 2024 | Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 | Liquid penetrant |
RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report | 1 April 2024 | Constellation Energy Generation, LLC - Annual Property Insurance Status Report | |
RS-24-031, Updated Safety Analysis Report (Usar), Revision 23 | 1 April 2024 | Updated Safety Analysis Report (Usar), Revision 23 | Safe Shutdown Time to boil Temporary Modification Fire Watch GNF3 |
RS-24-023, Report on Status of Decommissioning Funding. | 22 March 2024 | Report on Status of Decommissioning Funding. | License Renewal |
RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF | 19 March 2024 | Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF | Safe Shutdown Reactor Vessel Water Level Tornado Missile Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment FLEX Significance Determination Process Surveillance Frequency Control Program Large early release frequency Maintenance Rule Program Offsite Circuit Very Early Warning Fire Detection Control Room Habitability |
RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS | 15 March 2024 | Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS | Exemption Request Control of Heavy Loads |
RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations | 14 March 2024 | Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations | Aging Management License Renewal Exemption Request Subsequent License Renewal |
RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 | 8 March 2024 | Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 | Exemption Request |
RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval | 29 February 2024 | Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval | |
RS-24-017, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS | 23 February 2024 | Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS | Exemption Request Fuel cladding |
RS-24-005, Additional Information Supporting Request for Partial Site Release | 8 February 2024 | Additional Information Supporting Request for Partial Site Release | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 3 January 2024 | Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | VT-2 Intergranular Stress Corrosion Cracking |
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 15 December 2023 | Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | High winds Mission time Tornado Missile FLEX B.5.b Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Overspeed trip |
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
RS-23-121, Sixth Ten-Year Interval Inservice Testing Program | 30 November 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Grab sample Stroke time Squib Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Local Leak Rate Testing Scram Discharge Volume Intergranular Stress Corrosion Cracking Excess Flow Check Valve Cold shutdown justification Power-Operated Valves |
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 8 November 2023 | Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | Nondestructive Examination VT-2 |
RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | 20 October 2023 | Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | Safe Shutdown Aging Management Flow Accelerated Corrosion License Renewal GNF3 |
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station | 7 September 2023 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station | Accident Tolerant Fuel GNF3 |
RS-23-089, Sixth Ten-Year Interval Inservice Testing Program | 5 September 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Stroke time Squib Incorporated by reference Locked High Radiation Area Missed surveillance Surveillance Frequency Control Program Local Leak Rate Testing Scram Discharge Volume Intergranular Stress Corrosion Cracking Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR | 30 August 2023 | Application to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Anticipated operational occurrence Minimum Critical Power Ratio Annual Radiological Environmental Operating Report Process Control Program Fuel cladding GNF3 |
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 30 August 2023 | Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Shutdown Margin Surveillance Frequency Control Program |
RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 28 August 2023 | Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | |
RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation | 21 August 2023 | Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Internal Flooding Hydrostatic High Energy Line Break Earthquake Recently irradiated fuel Power Uprate |
RS-23-085, Supplemental Information Related to Request for Partial Site Release | 3 August 2023 | Supplemental Information Related to Request for Partial Site Release | |
RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | 16 June 2023 | Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | |
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 8 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Mission time Anticipated operational occurrence Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Zebra Mussel FLEX B.5.b Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency Tornado Missile Risk Evaluator Earthquake Turbine Missile Biofouling Offsite Circuit Failure to Scram Overspeed Subsequent actuation Control Room Habitability |
RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 8 June 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Zebra Mussel FLEX Fukushima Dai-Ichi Large early release frequency Earthquake Turbine Missile Biofouling Seismic Walkdown Report Overspeed Control Room Habitability |
RS-23-073, Request for Partial Site Release | 7 June 2023 | Request for Partial Site Release | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program Water hammer |
RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel | 16 May 2023 | Supplement to License Amendment Request Regarding Transition to GNF3 Fuel | GNF3 |
RS-22-067, 10 CFR 50.46 Annual Report | 4 May 2023 | 10 CFR 50.46 Annual Report | GNF3 |
RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | 28 April 2023 | Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | Nondestructive Examination |