200 Energy Way Kennett Square, PA 19348 www.ConstellationEnergy.com RS-25-036 10 CFR 50 10 CFR 51 10 CFR 54 April 03, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

First 10 CFR 54.21(b) Annual Amendment to the Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application

Reference:

Letter from Christopher D. Wilson (Constellation Energy Generation, LLC) to U.S.

NRC, Application for Renewed Operating License, dated April 17, 2024 (ML24108A008)

In the Reference letter, Constellation Energy Generation, LLC (CEG) submitted a Subsequent License Renewal Application (SLRA) for Dresden Nuclear Power Station, Units 2 and 3 (DNPS).

10 CFR 54.21(b) requires submitting an amendment each year following submittal of the SLRA and at least three months before the scheduled completion of the NRC review identifying changes to the current licensing basis (CLB) that materially affect the content of the SLRA, including the UFSAR supplement.

CEG has completed the first annual review for the period from December 29, 2023, through February 12, 2025, and concluded that no CLB changes have been implemented which have a material effect on the content of the SLRA, including the UFSAR Supplement.

Should you have any questions regarding this submittal, please contact Ms. Iba Ello-Fletcher, Licensing Lead, DNPS License Renewal Project, at (779) 231-5462 or by email at Iba.ElloFletcher@Constellation.com.

April 03, 2025 U.S. Nuclear Regulatory Commission Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 3rd day of April 2025.

Respectfully, Christopher D. Wilson License Renewal Director Constellation Energy Generation, LLC cc:

NRC Regional Administrator, Region III NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Project Manager (Safety Review), NRR-DNRL NRC Project Manager (Environmental Review), NRR-DNRL NRC Project Manager, NRR-DORL - Dresden Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety Wilson, Christopher D Digitally signed by Wilson, Christopher D Date: 2025.04.03 09:43:38 -04'00'