Letter Sequence Request |
---|
TAC:ME8041, Missed Surveillance Requirements (Approved, Closed) |
|
|
|
---|
Category:Letter type:RNP
MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:Technical Specification
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, “Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, “Add Action for More than One (D)Rpi Inoperable RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions 2024-05-23
[Table view] Category:Bases Change
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/04-0133, Transmittal of Technical Specifications Bases Revisions2004-10-21021 October 2004 Transmittal of Technical Specifications Bases Revisions RNP-RA/03-0038, Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron2003-05-28028 May 2003 Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron RNP-RA/03-0061, Transmittal of TS Bases Revisions2003-05-0202 May 2003 Transmittal of TS Bases Revisions RNP-RA/02-0118, Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term2002-08-14014 August 2002 Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term 2023-05-25
[Table view] |
Text
10 CFR 50.90 Progress Energy Serial: RNP-RA/1 1-0095 FEB 10 2012 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REQUEST FOR TECHNICAL SPECIFICATIONS CHANGE REGARDING MISSED SURVEILLANCES USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS Ladies and Gentlemen:
In accordance with the provisions of 10 CFR 50.90, Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is submitting a request for an amendment to the Technical Specifications (TS) for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2.
The proposed amendment would modify the TS requirements for missed surveillances as provided within Surveillance Requirement (SR) 3.0.3.
Attachment I provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications.
Attachment II provides the existing TS pages marked up to show the proposed change.
Attachment III provides the revised TS pages.
Attachment IV provides a summary of the regulatory commitments made in this submittal.
Attachment V provides the existing TS Bases pages marked up to show the proposed changes to the Bases.
Approval of the proposed license amendment is requested by November 3, 2012, with the amendment being implemented within 120 days of issuance.
In accordance with 10 CFR 50.91, a copy of this application is being provided to the State of South Carolina.
Progress Energy Carolinas, Inc.
Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550
United States Nuclear Regulatory Commission Serial: RNP-RA/1 1-0095 Page 2 of 2 If you should have any questions regarding this submittal, please contact Mr. R. Hightower at (843) 857-1329.
Sincerely, Chris Kamilaris Manager - Support Services - Nuclear CK/dfs Attachments: I. Description and Assessment II. Proposed Technical Specification Changes III. Revised Technical Specification Pages IV. Regulatory Commitments V. Proposed Changes to Technical Specifications Bases c: Ms. S. E. Jenkins, Manager, Infectious and Radioactive Waste Management Section (SC)
Mr. V. M. McCree, NRC, Region II Ms. A. T. Billoch-Colon, NRC Project Manager, NRR NRC Resident Inspectors, HBRSEP Attorney General (SC)
AFFIRMATION The information contained in letter RNP-RA/1 1-0095 is true and correct to the best of my information, knowledge, and belief, and the sources of my information are officers, employees, contractors, and agents of Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc. I declare under penalty of perjury that the foregoing is true and correct.
Executed On: z7 0 10It-C. Kamilaris Manager - Support Services - Nuclear, HBRSEP, Unit No. 2
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/1 1-0095 Page 1 of 4 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DESCRIPTION OF THE PROPOSED CHANGE, THE REQUESTED CONFIRMATION OF APPLICABILITY. AND PLANT-SPECIFIC VERIFICATIONS
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/1 1-0095 Page 2 of 4
1.0 DESCRIPTION
The proposed amendment would modify the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications (TS) requirements for missed surveillances as provided within Surveillance Requirement (SR) 3.0.3.
The proposed changes are consistent with the NRC-approved Technical Specifications Task Force (TSTF)-358, Revision 6, which is equivalent to TSTF-358, Revision 5, as modified by Federal Register Notice 66FR32400, dated June 14, 2001, and in response to public comments. The availability of this TS improvement was published in Federal Register Notice 66FR49714 on September 28, 2001, as part of the Consolidated Line Item Improvement Process (CLIIP).
2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation Carolina Power and Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc. has reviewed the model safety evaluation (SE), dated June 14, 2001, associated with the SR 3.0.3 CLIIP. This review included the NRC staff s evaluation, as well as the supporting information associated with TSTF-358. Accordingly, CP&L has concluded that the justifications presented in the TSTF proposal and the SE prepared by the NRC staff are applicable to HBRSEP, Unit No. 2, and justify this amendment for the incorporation of the proposed changes into the HBRSEP, Unit No. 2, TS.
2.2 Optional Changes and Variations This amendment request proposes no variations or deviations from the TS changes described in the fully modified TSTF-358, Revision 5, i.e., TSTF-358, Revision 6, or the NRC staff's model SE dated June 14, 2001.
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/1 1-0095 Page 3 of 4
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination HBRSEP, Unit No. 2, has reviewed the proposed no significant hazards consideration determination published in the June 14, 2001 Federal Register Notice as part of the Consolidated Line Item Improvement Process (CLIIP). This review has concluded that the proposed no significant hazards consideration determination presented in the Federal Register is applicable to HBRSEP, Unit No. 2, and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9 1(a).
3.2 Verification and Commitments As discussed in the June 14, 2001 Federal Register Notice for this TS improvement, plant-specific verifications were performed as follows:
HBRSEP, Unit No. 2, has established TS Bases for SR 3.0.3 which state that use of the delay period established by SR 3.0.3 is a flexibility which is not intended to be used as an operational convenience to extend surveillance intervals, but only for the performance of missed surveillances.
Additionally, the HBRSEP, Unit No. 2, TS Bases will be revised to include details on how to implement the new requirements. These TS Bases changes provide guidance for surveillance frequencies that are not based on time intervals, but are based on specified unit conditions, operating situations, or requirements of regulations. In addition, the revised TS Bases will state that a missed surveillance is expected to be performed at the first reasonable opportunity, taking into account appropriate considerations, such as the impact on plant risk and accident analysis assumptions, consideration of unit conditions, planning, availability of personnel, and the time required to perform the surveillance.
The TS Bases will also state that the risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, Regulatory Guide 1.182, "Assessing and Managing Risks Before Maintenance Activities at Nuclear Power Plants," and that the missed surveillance should be treated as an emergent, condition as discussed in Regulatory Guide 1.182. In addition, the TS Bases will state that the degree of depth and rigor of the evaluation should be commensurate with the importance of the component and that missed surveillances for important components should be analyzed quantitatively. The TS Bases will also state that the results of the risk evaluation will be used to determine the safest course of action and that missed surveillances will be placed into the Corrective Action Program. The requirements of the HBRSEP, Unit No. 2, TS Bases Control Program, as described in TS 5.5.14, is consistent with Section 5.5 of NUREG- 1431, "Standard Technical Specifications - Westinghouse Plants."
The proposed changes to the HBRSEP, Unit No. 2, TS Bases pages are provided for informational purposes within Attachment V to this amendment request.
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/1 1-0095 Page 4 of 4 4.0 ENVIRONMENTAL EVALUATION CP&L has reviewed the environmental evaluation included in the model safety evaluation dated June 14, 2001, as part of the CLIIP. It has been concluded that the NRC staffs findings presented in that evaluation are applicable to HBRSEP, Unit No. 2, and the evaluation is hereby incorporated by reference for this application.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/1 1-0095 2 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES (MARK-UP)
SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCD. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCD except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
For Frequencies specified as "once," the above interval extension does not apply.
If a Completion Time requires periodic performance on a "once per . . ." basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
SR 3.0.3 If it is discovered that a SurveilIance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of 1 greater] discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever it[ . This delay period is permitted to allow performance of the Surveillance.
t' A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
(continued)
HBRSEP Unit No- 2 3.0-4 Amendment No. W
United States Nuclear Regulatory Commission Attachment III to Serial: RNP-RA/1 1-0095 2 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REVISED AND RETYPED TECHNICAL SPECIFICATIONS PAGES
SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.
Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
For Frequencies specified as "once," the above interval extension does not apply.
If a Completion Time requires periodic performance on a "once per . . ." basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
(continued)
HBRSEP Unit No. 2 3.0-4 Amendment No.
United States Nuclear Regulatory Commission Attachment IV to Serial: RNP-RA/1 1-0095 2 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REGULATORY COMMITMENTS
United States Nuclear Regulatory Commission Attachment IV to Serial: RNP-RA/1 1-0095 Page 2 of 2 CP&L will adopt the Technical Specification Bases changes as shown in Attachment V upon implementation of this license amendment.
United States Nuclear Regulatory Commission Attachment V to Serial: RNP-RA/1 1-0095 4 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS BASES PAGES
SR Applicability B 3.0 BASES SR 3.0.2 The requirements of regulations take precedence over the TS.
(continued) The TS cannot in and of themselves extend a test interval specified in the regulations.
Therefore, there is a Note in the Frequency stating, "SR 3.0.2 is not applicable."
As stated in SR 3.0.2, the 25% extension also does not apply to the initial portion of a periodic Completion Time that requires performance on a "once per ..- " basis- The 25%
extension applies to each performance after the initial performance. The initial performance of the Required Action, whether it is a particular Surveillance or some other remedial action, is considered a single action with a single Completion Time. One reason for not allowing the 25% extension to this Completion Time is that such an action usually verifies that no loss of function has occurred by checking the status of redundant or diverse components or accomplishes the function of the inoperable equipment in an alternative manner.
The provisions of SR 3.0.2 are not intended to be used repeatedly merely as an operational convenience to extend Surveillance intervals (other than those consistent with refueling intervals) or periodic Completion Time intervals beyond those specified.
SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been completed within the specified Frequency. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> greaer to the limit of the specified Frequency, whichever is greaterfs,, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.
This delay period provides adequate time to complete Surveillances that have been missed. This delay period permits the completion of a Surveillance before complying with Required Actions or other remedial measures that might preclude completion of the Surveillance.
The basis for this delay period includes consideration of unit conditions, adequate planning. availability of personnel, (continued)
HBRSEP Unit No- 2 B 3-0-13 Revision No- W
SR Applicability B 3.0 BASES SR 3.0.3 the time required to perform the Surveillance, the safety (continued) significance of the delay in completing the required Surveillance, and the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the requirements.
Insert 1 When aanSurveil ncewithaFreque ha F eq ybasednoto Me interval s but uupon on s pe fied unitt condit' Surspe dn ns or operat' nal situation peraw nnspecified, sit uatl an is discover d not 1 to t/ee have
,'h c be performed med SR 3-0-3 laws the full a v de y period'r 0of ho hours to pe arm the Surv fflance. r wt 11 ( a L ion/ fj ed, SR,/3. .3 valso prIovides delay.period t- adsed or c nat a np n of to completion
ýi f per r
Surv 'llances that bec e applicable P(2 s a consequen nterv taorm 15 of MODE cha ges imposed by Re uiredb Actions Failure to complywith specified Frequencies for SRs is expected to be an infrequent occurrence. Use of the delay period established by SR 3.0.3 is a flexibility which is not intended to be used as an operational convenience to extend Surveillance
~
I~ Isr2 ntervals.
If a Surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the variable is considered outside the specified limits and the Completion Times of the Required Actions for the applicable
[CO Conditions begin immediately upon expiration of the delay period. If a Surveillance is failed within the delay period, then the equipment is inoperable, or the variable is outside the specified limits and the Completion Times of the Required Actions for the applicable [CO Conditions begin immediately upon the failure of the Surveillance.
Completion of the Surveillance within the delay period allowed by this Specification, or within the Completion Time of the ACTIONS, restores compliance with SR 3.0.1.
SR 3.0.4 SR 3.0.4 establishes the requirement that all applicable SRs must be met before entry into a MODE or other specified condition in the Applicability.
This Specification ensures that system and component OPERABILITY requirements and variable limits are met before entry into MODES or other specified conditions in the (continued)
HBRSEP Unit No- 2 B 3-0-14 Revision No.0
BASES INSERTS Insert 1 When a Surveillance with a Frequency based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, SR 3.0.3 allows for the full delay period of up to the specified Frequency to perform the Surveillance. However, since there is not a time interval specified, the missed Surveillance should be performed at the first reasonable opportunity.
SR 3.0.3 provides a time limit for, and allowances for the performance of, Surveillances that become applicable as a consequence of MODE changes imposed by Required Actions.
Insert 2 While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified Frequency is provided to perform the missed Surveillance, it is expected that the missed Surveillance will be performed at the first reasonable opportunity. The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the Surveillance as well as any plant configuration changes required or shutting the plant down to perform the Surveillance) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the Surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, Regulatory Guide 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants." This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown.
The missed Surveillance should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. Missed Surveillances for important components should be analyzed quantitatively. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. Missed Surveillances will be placed into the Corrective Action Program.