RBG-47143, Submittal of Owners Activity Report Form (OAR-1)

From kanterella
Jump to navigation Jump to search
Submittal of Owners Activity Report Form (OAR-1)
ML11136A107
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/10/2011
From: Lorfing D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47143
Download: ML11136A107 (5)


Text

` Entergy Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St, Francisville, LA 70775 Tel 225-381-4157 David N. Lorfing Manager-Licensing May 10, 2011 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RBG-47143

Subject:

Submittal of Owner's Activity Report Form (OAR-i)

River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Pursuant to ASME Code Case N-532-4, please find enclosed the River Bend Station (RBS)

Cycle 16 Owner's Activity Report Form (OAR-i). This report reflects ASME Section XI program activities occurring between November 2009, and January 2011.

If you have any questions or require further information, please contact Mr. David Lorfing at (225) 381-4157.

Qý DNL/wjf Enclosure A-647~

Submittal of Owner's Activity Report Form (OAR-i)

RBG-47143 Page 2 of 2 cc:

U.S. Nuclear Regulatory Commission Region IV

,612 E. Lamar Blvd., Suite 400 Arlington, TX 76011 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Alan Wang, Project Manager U.S. Nuclear Regulatory Commission MS O-8G14 11555 Rockville Pike Rockville, MD 20852-2738

CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNERS ACTIVITY REPORT Report Number Cycle 16 / Refueling Outage RF-16 OAR-1 Plant River Bend Station, 5485 U.S. Highway 61, St. Francisville, Louisiana 70775 Unit No.,

1 Commercial (If applicable)

Current inspection interval 3rd Inspection Interval service date 06/16/1986 Refueling outage no.

RF-16 1 5',2nd, 3 rd 4 tn, other)

Current inspection period 1st Insoection Period

( 1`n,2",

3 'm)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition with 2003 Addenda Date and revision of inspection plans CEP-ISI-103 R/0 - 6/2/2008; CEP-ISI-103 R/1 - 3/30/2010; CEP-ISI-103 R/2 - 1/17/2011 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-532-4 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c)the -repairlreplacement activities and evaluations supporting the completion of RF-16 conform to the requirements of Section Xl.

(refueling outage number)

Signed (at*

). - M&C:.

Date 5/ly/z.O I Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Louisiana and employed by HSB CT of Hartford CT have inspected the items described in this Owner's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in Accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

___Commissions LA1184 (A,N,I)

Inspector's Signature National Board, State, Province, and Endorsements Date 5--t-1,11

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number ISTD-5200 SWP-PSSP-1346-A3 Snubber failed to Snubber support and associated meet criteria of ISTD-5200 operational system evaluated in CR-RBS-201 1-readiness test.

01589 and demonstrated to meet Code allowable limits. Snubber replaced per ISTD-5280.

ISTD-5200 SWP-PSSP-1610-A3 Snubber failed to Snubber support and associated meet criteria of ISTD-5200 operational system evaluated in CR-RBS-201 1-readiness test.

01744 and demonstrated to meet Code allowable limits. Snubber replaced per ISTD-5280.

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Date Repair/Replacement Work Completed Plan Number 3

Snubber, SWP-PSSP-Snubber S/N 1879 5/3/2011 M007-265668 1610-A3 failed functional test, replaced with like snubber S/N 48805.