RBG-46172, August 2003 Monthly Operating Report for River Bend Unit 1
| ML032600923 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/11/2003 |
| From: | King R Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| G4.25, G9.5, RBF1-03-0170, RBG-46172 | |
| Download: ML032600923 (4) | |
Text
a
~Entey Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 P. 0. Box 220 St. Francisville, LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance September 11, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Operating Report River Bend Station Unit 1 Docket No. 50-458 License No. NPF-47 File No.:
G9.5, G4.25 RBG-461 72 RBF1 0170 Ladies and Gentlemen:
In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for August 2003.
Sinclsurely, RJK/dhw enclosure
-Zq
16
Monthly Operating Report September 11, 2003 RBG-46172 RBFI-03-0170 Page 2 of 2 cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector R-SB-14 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107
Docket No. 601458 River Bend Station Date:
September 11. 2003 Completed by:
Danny H. Williamson
Title:
Sr. Licensing Specialist Telephone:
225-381.4279 Page 1
of 2 OPERATING STATUS
- 1. Reporting period:
Au-gust 2003
- 2. Maximum dependable capacity (MWe-Net):
- 3. Design electrical rating (MWe-Net):
966 966
- 4. Number of hours reactor was critical S. Hours generator on line
- 6. Unit reserve shutdown hours
- 7. Net electrical energy generated (MWH)
MONTH YEAR TO DATE 744.0 5215.5 744.0 5168.4 0
0 726,654 4.8341655 CUMULATIVE 125,223.7 121.603.8 0
108.899.531
PAGE 2
OF 2
UNIT SHUTDOWNS LEGEND:
TYPE:
F - Forced S -Scheduled SHUTDOWN METHOD:
I - Manual 2 - Manual trip I scram 3 - Automatic trip I scram 4 - Continuation 6 - Other (explain)
REASON:
A - Equipment faIlure (explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training I Ucense Exam F - Administrative G - Operational error (explain)
H - Other (explain)
CD,1 ifv ~
Danny H. Williamson