RBG-45953, April 2002 Monthly Operating Report for River Bend Station
| ML021620415 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/13/2002 |
| From: | King R Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBF-1-02-0081, RBG-45953 | |
| Download: ML021620415 (4) | |
Text
m SEntergy Nuer Sa Asgrsuay n P 0 Box 220 St. Francisv!lle. LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance May 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
Subject:
Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:
G9;5, G4.25 RBG-45953 RBF1-02-0081 Ladies and Gentlemen:
In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for April 2002.
Sincerely, enclosure
jit A
Monthly Operating Report May 13, 2002 RBG-45953 RBF1-02-008f Page 2 of 2 cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107
DOCKET NO. 50/458 RIVER BEND STATION DATE Maw 13, 2002 COMPLETED BY Mark L. Walton TITLE Sr. Licensing Specialist TELEPHONE 225-381-4218 PAGE 1
OF 2
OPERATING STATUS
- 1. REPORTING PERIOD:
- 2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):
- 3. DESIGN ELECTRICAL RATING (MWe-Net):
- 4.
- 5.
- 6.
7.
April 2002 966 966 MONTH YEAR TO CUMULATIVE DATE NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2879.0 114254.5 HOURS GENERATOR ON LINE 719.0 2879.0 110643.5 UNIT RESERVE SHUTDOWN HOURS 0
0 0
NET ELECTRICAL ENERGY GENERATED (MWH) 720,092 2,889,626 98,482,573
PAGE 2
OF 2
UNIT SHUTDOWNS LEGEND:
TYPE:
SHUTDOWN METHOD:
REASON:
F - Forced I - Manual A - Equipment failure (explain)
S - Scheduled 2 - Manual trip i scram B - Maintenance or Test 3 - Automatic trip / scram C - Refueling 4 - Continuation D - Regulatory restriction 5 - Other (explain)
E - Operator training I License Exam F - Administrative G - Operational error (explain)
H - Other (explain)
NOTES:
- 1. There were no challenges to the reactor safety relief valves in April.
Mark E. Walton