t CENTER 40R e

ENERGY PERRY NUCLEAR POWER PLANT MaH Address:

Robert A.Stratman

[

10 CENTER ROAD RRY, O 10 44081 PERRY, OHIO 44081 ff10) 259-3737 L

September 15, 1994 PY-CEI/NRR-1859L U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 i

Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen:

Attached is the August 1994 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216)'280-5833.

Very truly yours,

.)

7, f$</ / /.

RAS:LKR:sc Attachment i

cc:

NRC Project Manager NRC Resident Inspector Office NRC Region III Director, Office of Resource Management

)

00Q9 ** p 4uusau i

9409210351 940831 PDR ADOCK 05000440 Operating companies -

.PDR N

C:eveiond Dectoc muminatrng

-(

I Toledo Edison j

u ee'

,. ~.

..=.-....

...c i

e

'O.

CLEVELAND ELECTRIC ILLUMINATING COMPANY 1

PERRY NUCLEAR POWER PIANT l

August 1, 1994 - August 31, 1994-i MONTHLY OPERATING REPORT TO NRC i

t i

i DOCKET NUMBER : 50-440 t

i LICENSE NUMBER: NPF-58 i

i

'k

.i O

1 I

)

i 4 i

.l

'I 1

i

i 4

4 t

Table of Contents i

Average Daily Unit Power Level...................

1 j

Operating Data Report 2

Unit Shutdowns and Power Reductions.

3

)

9 T

' I o

'tW e-

AVERAGE DATLY UNIT POWER 12 VEL DOCKET NO.

50-440 UNIT PERRY ONE DATE 09/15/94 CONTALT L. K. ROLTfZA '

TELEPHONE (216)280-Sd1 ~

HON 111 AUGUST 1994 DAY AVIGtAGE DAILY POVER 12 VEL DAY AVERAGE DAILY POWER LEVEL (MVe-Net)

(MWe-Net) 1 0

17 820 2

0 18 854 3

0 19 799 4

0 20 865 5

0 21 996 6

0 22 1166 7

0 23 1169 8

0 24 1165 9

0 25 1159 10 0

26 1160 11 0

27 1159 12 0

28 1155 13 7

29 1166 14 127 30 1172 15 339 31 1166 16 519 l

'~

OPERATING DATA REPORT UNIT:

PERRY ONE DATE:

09/15/94 OPERATING STATUS 1.

Docket:

50-440 2.

Reporting Period: AUGUST 1994 3.

Utility

Contact:

L.K. Routzahn 4.

Licensed Thermal Power (MVt):

3579 5.

Nameplate Rating (Gross MVe):

1250 6.

Design Electrical Rating (net MVe):

1191 7.

Maximum Dependable Capacity (Gross MVe):

1225 8.

Maximum Dependable Capacity (Net Mwe):

1166 9.

If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

NONE

10. Power Level to Vhich Restricted, IP any (Net MVe): 100%
11. Reasons for Restrictions, IF Any: _ OPERATING LICENSE This Month Yr-to-Date Cumulative
12. Hours In Reporting Period 744 5831.0 59,483.0
13. Hours Reactor was Critical 576.5 1,470.0 39,001.4
14. Reactor reserve Shutdovn Hours 0

0.0 0.0

15. Hours Generator On-Line 438.1 1,223.4 37,359.0
16. Unit Reserve Shutdown Hours 0

0.0 0.0

17. Gross thermal Energy (HVH) 1,336,733 4,060,147 126,940,908
18. Gross Electrical Energy (MVH) 428,404 1,367,810 43,592,802
19. Net Electrical Energy (MVH) 400,598 1,288,274 41,381,203
20. Unit Service Factor 58.9%

21.0%

62.8%

21. Unit Availability Factor 58.9%

21.0%

62.8%

22. Unit Capacity Factor (using MDC Net) 46.2%

18.9%

60.3%

23. Unit Capacity Factor (Using DER Net) 45.2%

18.6%

58.4%

24. Unit Forced Outage Rate 0.0%

4.4%

12.2%

25.

Forced Outage Hours 0

56.2 5,195.0

26. Shutdovns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
27. If Shutdown at end of Report Period, Estimated Date of Startup:

UNIT SHIRDOUNS AND POUER REDUCTIONS REPORT M0hTH AUGUST 1994 DOCKE"I NO. 50-440

^

UNIT NAME PERRY ONE DATE 09/15/94 CONTACT L.K.R0lHZAHN TETPPHONE (216)280-5781 NO.

DATE TYPE DURATION REASON Mt niOD LER SYSTEM COMP.

CAUSE & CORRECTIVE ACTION TO PRE W 1

HOURS 2

3 4

5 RECURRDJCE

SUMMARY

PERRY COMPLETED REFUEL OIIIAGE #4. GENERATOR SYCHRONIZATION VAS ACHIEVED ON 8/13/94 @0022, VITH THE UNIT AT 100% ON 8/22/94.

1.

F: FORCED 2.

REASON:

3.

METHOD 4.

EXHIBIT G-INSTRUCTIONS S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING 3-AITr0MATIC SCRAM EVENT REPORT (LER) FILE D-REGULATORY RESTRICTION 4-CONTINUED (NUREG 1022)

E-OPERATOR TRAINING &

5-REDUCED LOAD LICENSE EXAMINATION 9-OrrHER 5.

EXHIBIT 1-SAME SOURCE F-ADMINSTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN)

~

-