PY-CEI-NRR-1150, Monthly Operating Rept for Feb 1990 for Perry Unit 1
| ML20033F351 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 02/28/1990 |
| From: | Hegrat H, Kaplan A CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PY-CEI-NRR-1150, NUDOCS 9003200108 | |
| Download: ML20033F351 (6) | |
Text
..
kJ,
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY P.O. BOX 97 3
PERRY. OHIO 44061 E
TELEPHONE (216) 2664737 5
AfCRESS-10 CENTER ROAD FROM CLEVELAND: 479 1200 S TELEX; 241699 ANSWERSACK: CEIPRYO Af Kaplan Serving The Best location in the Nation PERRY NUCLEAR POWER PLANT vet rRt sa m MQ t AR GRV March 15, 1990 PY-CEI/NRR-1150 L U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Dear Sir Attached is the February 1990 Monthly Operating Report for Perry Unit 1..
This report is submitted in accordance with Technical Specification 6.9.1.8.
If there are any questions, please feel free to call.
Very truly yours, G
Al Kaplan l_
Vice President l
Nuclear Group AKinjc Attachment l
cc:
T. Colburn USNRC Senior Resident Inspector - Perry USNRC, Region III Director, Office of Resource Management fh abo O
/
n
\\\\\\
J
' \\ '.
{.
CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT February 1, 1990 - February 28, 1990 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER :
50-440 LICENSE NUMBER: NPF-58 i
l Table of Contents Average Daily Unit Power Level...................
1 2
Operating Data Report..
Unit Shutdowns and Power Reductions..............
3 i
4;;
z--
,s
>g o
+- q g..
c Average Daily Unit Power Level DOCKET _NO.
50-440 UNIT Perry-1 DATE-03/15/90 g
Contact H. L. Hegrat -
Telephone (216)259-3737 1
. MONTH
-February ?t}0 1
DAY AyERAGE DAILT POWER LEVEL Di{
AVERAGE DAILY POWER' LEVEL (MWe-Net)
(MWe-Net) 1 1192 17 1115 2-1197 18 1128 3
1202 19 1202 4-1200 20 1204 5
1201-21
-1201 i
6 1199-22 1196 7-1198 23 1201 8~
1193 24 1203 9
1194 25 1196
-l 10' 1201 26 1201 1
11 1189 27 1198-12 1200 28 1202=
13 1194 29 N/A 14 1202 30 N/A 15 1201 31 N/A 16~
1199 i
Operating Data Report UNIT:
PERRY-1 DATE:
03/15/90 OPERATING STATUS 1.
Docket:
50-440 2.
Reporting Period:
February 1990 3.
Utility
Contact:
H.L. Hegrat (216) 259-3737 4.
Licensed Thermal Power (MVt):
3579 5.
Nameplate Rating (Gross MVe):
1250 6.
Design Electrical Rating (Net MVe):
1191 7.
Maximum Dependable Capacity (Gross MVe):
1200 8.
Maximum Dependable Capacity (Net MVe):
1141 9.
If changes occur in capacity ratings (Item Numbers 4 through 8) since last report, give reasons:
N/A
- 10. Power Level To Which Restricted, If Any (Net MVe):
100%
- 11. Reasons for Restrictions, If Any:
Technical Specification Limit This Month Yr-to-Date Cumulative
- 12. Hours In Reporting Period 672 1416.0 20,004
- 13. Sours Reactor Vas Critical 672 1208.2 13,955.7
- 14. Reactor Reserve Shutdown Hours 0
0 0
- 15. Hours Generator On-1ine 672 1164.8 13,383.3_
- 16. Unit Reserve Shutdown Hours 0
0 0
- 17. Gross Thermal Energy (MVH) 2,391,429 4,091,458 45,215,786 l
- 18. Gross Electrical Energy (MVH) 839,060 1,429,881 15,570,338
- 19. Net Electrical Energy (MVH) 801,799 1,362,025 14,748,118
- 20. Unit Service Factor 100.0%
82.3%
66.9%
- 21. Unit Availability Factor 100.0%
82.3%
66.9%
'22. Unit Capacity Factor (Using MDC Net) 104.6%
84.3%
64.6%
l
- 23. Unit Capacity Factor (Using L
DER Net).
100.2%
80.8%
61.9%
L
- 24. Unit Forced Outage Rate 0%
5.8%
10.4%
- 25. Forced Outage Hours 0
72 1,558.9
- 26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
None
- 27. If Shut Down at end of Report Period, Estimated Date of Startup:
L N/A NJC/ FORM /2255 l-
I
\\
1
- +
~
lilitT SNifTDOWNS AND POWER REDUCTIONS
. DOCKET'NO. 50-440 UNIT NAME Perry-1 DATE 03/15/90 '.
REPORT HONTN February 1990 CONTACT H.L. Henrat
.i TELErflONE (216) 259-3737 U
c n
om
.o q g,,,c o Licensee g,
gg Cause & Corrective No.
Date R
yg j**y Event g4 gy Action to a
gj j gjg ' Report #
gg gu Prevent Recastrence H
av 2: en u
o O
Not Applicable
. i i
h l
I
SUMMARY
During February 1990, Perry-1 operated at full power with no plant outages or significant power reductions.
c 1
I F: Forced Reason:
Method:
Exhibit C - Instructions.
i S: Scheduled A-Equipment Failure (Explain) 1-Hanual for Preparation of Data i
B-Maintenance or Test 2-Manual Scrase
. Entry Sheets for Licensee l
C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Continued 1022)
E-Operator Training &
5,-Reduced Load 5
License Examination 9-Other Exhibit 1-Same Source F-Administrative-C-Operational Error (Explain)-
N-Other (Explain)
~..
. -