PLA-8178, Response to NRC Regulatory Issue Summary 2025-03 - PLA-8178
| ML25127A306 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/07/2025 |
| From: | Casulli E Susquehanna, Talen Energy |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| PLA-8178 | |
| Download: ML25127A306 (1) | |
Text
May 7, 2025 Edward Casulli Site Vice President U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3795 Fax 570.542.1504 Edward.Casulli@talenenergy.com SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO NRC REGULATORY ISSUE
SUMMARY
2025-03 PLA-8178 TALEN~
ENERGY 10 CPR 55.40 Docket No. 50-387 50-388
Reference:
NRC RIS 2025-03, "Preparation and Scheduling of Operator Licensing Examinations, " dated April 9, 2025.
The purpose of this letter is to respond to the referenced Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2025-03, "Preparation and Scheduling of Operator Licensing Examinations." Enclosed is the NRC Form 536 representing the current plan for operator licensing needs at the Susquehanna Steam Electric Station.
Susquehanna Nuclear, LLC (Susquehanna), will support Region I to balance examiner workload and provide mutually agreeable exam schedules through 2029. Susquehanna intends on preparing the operator licensing examinations in 2027 and 2028.
There are no new or revised regulatory commitments contained in this submittal.
Should you have any questions regarding this submittal, please contact Ms. Melisa Krick, Manager-Nuclear Regulatory Affairs, at(570) 542-1818.
E. Casulli Enclosure - NRC Form 536 Copy: NRC Region I, ATTN: Operations Branch Ms. A. Klett, NRC Project Manager Ms. J. England, NRC Senior Resident Inspector Mr. M. Shields, PA DEP/BRP
Enclosure to PLA-8178 NRC Form 536
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 01/31/2027 (01-16-2024) 0..:,>RftEG~t.,
Estimated burden per response to comply with this voluntaiy information collection request: 45 minutes.
0~~¥'%.
OPERA TOR LICENSING This information collection is used to plan budgets and resources for operator examinations. Send
/!!
comments regarding burden estimate to the FOIA, Libraiy, and Information Collections Branch (T-6 0
A 1 OM), U.S. Nuclear Regulatoiy Commission, Washington, DC 20555-0001, or by email to EXAMINATION DATA
'il>
- . ~
lnfocollects.Resource@nrc.gov, and the 0MB reviewer at: 0MB Office of Information and Regulatoiy
- ,,i'
"'****i(+
Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatoiy Commission, 725 17th Street NW, Washington, DC 20503; email:
oira submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiling the collection displays a currently valid 0MB control number.
FACILITY NRC REGION lsusquehanna Steam Electric Station 111 I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2026 CY 2027 CY 2028 CY2029 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2026 CY2027 CY2028 CY2029 NUMBER OF REACTOR 0
9 8
0 OPERATORS NUMBER OF SENIOR REACTOR 0
9 4
0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0
2 2
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES 02/22/2027 12/04/2028 PRIMARY DATE 02/22/2027 12/04/2028 AL TERNA TE DATE 07/19/2027 01/22/2029 NRC FORM 536 (01-16-2024)