PLA-8171, Notification of Readiness for NRC 95001 Inspection - PLA-8171

From kanterella
Jump to navigation Jump to search
Notification of Readiness for NRC 95001 Inspection - PLA-8171
ML25101A189
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/11/2025
From: Casulli E
Susquehanna, Talen Energy
To:
Office of Nuclear Reactor Regulation, NRC Region 1, Document Control Desk
References
PLA-8171
Download: ML25101A189 (1)


Text

April 11, 2025 Edward Casulli Site ViceJresident Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3795 Fax 570.542.1504 Edward.Casulli@TalenEnergy.com TALEN~

ENERGY Attn: Document Control Desk 10 CFR 50.4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION NOTIFICATION OF READINESS FOR NRC 95001 INSPECTION Docket No. 50-387 50-388 PLA-8171

References:

1. NRC letter to Susquehanna, "Follow-up to Inspection Procedure 71111.12 Inspection Report 05000387 /2024012 and 05000388/2024012 and Preliminary White Finding and Apparent Violation," dated November 25, 2024 (ADAMS Accession No. ML24330A017).
2. Susquehanna letter to NRC, "Response to Preliminary White Finding and Apparent Violation Documented in NRC Inspection Report 2024012, EA-24-111 (PLA-8153)," dated December 04, 2024 (ADAMS Accession No.

l\\1L24339B736).

3. NRC letter to Susquehanna, "Final Significance Determination of a White Finding with Assessment Follow-up and Notice of Violation, Inspection Report 05000387/2025090 and 05000388/2025090," dated January 27, 2025 (ADAMS Accession No. ML25016A306).

On November 25, 2024, the NRC notified Susquehanna Nuclear, LLC, (Susquehanna) of an escalated enforcement action, EA-24-111, associated with a preliminary White finding and apparent violation related to the April 08, 2024, failure of the Susquehanna Steam Electric Station 'B' Emergency Diesel Generator [Reference 1]. On December 04, 2024, Susquehanna notified the NRC of the decision not to contest the violation or significance of the violation

[Reference 2]. On January 27, 2025, the NRC provided a final significance determination of a White finding and Notice of Violation [Reference 3].

In Reference 3, the NRC stated plans to conduct a supplemental inspection for this finding in accordance with Inspection Procedure 95001, "Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) inputs," following Susquehanna's notification of the readiness for this inspection.

This letter serves as notification to the NRC that Susquehanna is prepared for the 95001 supplemental inspection. Based on resource availability, Susquehanna requests the 95001 supplemental inspection be scheduled for the week of May 12, 2025.

This letter contains no new or revised regulatory commitments.

Document Control Desk PLA-8171 Should you have any questions regarding this notification, please contact Ms. Melisa Krick, Manager-Nuclear Regulatory Affairs, at (570) 542-1818.

~72Jl E. Casulli Copy:

NRC Region I Ms. J. England, NRC Senior Resident Inspector Ms. A. Klett, NRC Project Manager Mr. M. Shields, PA DEP/BRP