NUREG-1057, Advises That Util May Decide to Revise Emergency Operating Procedure (EOP) Procedure Generation Package (PGP) Based on Safety Evaluation Submitted Via Unit 2 Sser 5 (NUREG-1057, Suppl 5) & Insps But Need Not Submit PGP Rev to NRC

From kanterella
Jump to navigation Jump to search

Advises That Util May Decide to Revise Emergency Operating Procedure (EOP) Procedure Generation Package (PGP) Based on Safety Evaluation Submitted Via Unit 2 Sser 5 (NUREG-1057, Suppl 5) & Insps But Need Not Submit PGP Rev to NRC
ML20006E911
Person / Time
Site: Beaver Valley
Issue date: 02/16/1990
From: Tam P
Office of Nuclear Reactor Regulation
To: Sieber J
DUQUESNE LIGHT CO.
References
RTR-NUREG-1057 TAC-44282, TAC-62934, NUDOCS 9002260531
Download: ML20006E911 (2)


Text

e gm d'

y February 16, 1990 g **

l Docket Nos. 50-334

]

and 50-412~

i Mr. J. D. Sieber, Vice President

. Nuclear Group Duquesne Light Company P.O. Box 4 Shippingport, Pennsylvania 15077

Dear Mr. Sieber:

SUBJECT:

BEAVER VALLEY POWER STATION - REVISIONS TO THE EMERGENCY

'5 OPERATING PROCEDURE (EOP) PRSCEDURE GENERATION PACKAGE (PGP)

(TAC 44282AND62934) y We have completed our review of your E0P PGP and transmitted our evaluation via the Beaver Valley Unit 2 SER Supplement No. 5 (NUREG-1057, Supp. 5). We have subsequently _ performed an.EOP inspection at Unit 1 (Inspection Report 50-334/88-02), and have scheduled to perform the same at Unit 2 starting 1

. February 26, 1990.

We recognize that as a result of the safety evaluation and the inspections, you may decide to revise your PGP and E0Ps. Please be advised that there is no need to submit any PGP revision to the NRC. However, for items you deem 1

. inappropriate or no longer applicable for inclusion in the PGP you developandmaintaindocumentedjustificationinanauditableform.should b

All revisions to the PGP should be reflected in the unit E0Ps within a reasonable period of time, e.g. the next planned revision of the E0Ps.

-If you need clarification, please request to discuss with Jon Hopkins and_

Susan Shankman of this office. There is no need for any written response from you.

Sincerely,

.S }i nek 9002260531 900216 Peter 3' Tam, Senior Project Manager PDR ADOCK 05000334

. Project Directorate I-4 f

PNU 6

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i

cc: See next page

-DISTRIBUTION:

255ESTTITi%,

NRC File S.Shankman(11B19)

NRC & Local PDRs Plant File J. Hopkins (14H25)

SVarga Boger

/

SNorris

(

PTam OGC(infoonly)

EJordan ACRS(10

(\\

(DOCUMENT NAME: LTR/BV) f LA: DI-4 PM:PDI-4

- PD' I-4 SN r PTam:rmg JSt 2/15/90 2ll.s-/90 2/ }(,

O>

Mr. J. Sieber Beaver Valley Power Station Duquesne Light Company Units 1 & 2 CC:

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts and Trowbridge Pennsylvania Department of 2300 N Street, N.W.

Environmental Resources Washington, DC 20037 ATTN:

R. Janati Post Office Box 2063 Kenny Grade, Manager Harrisburg, Pennsylvania 17120 Nuclear Safety Duquesne Light Company Mayor of the Borrough of P. O. Box 4 Shippingport Shippingport, Pennsylvania 15077 Post Office Box 3 g

Shippingport, Pennsylvania 15077

?

John A. Lee, Esquire Ashley C. Schannauer Duquesne Light Company Assistant City Solicitor One Oxford Centre City of Pittsburgh h.

301 Grant Street 313 City-County Building Pittsburgh, Pennsylvania 15279 Pittsburgh, Pennsylvania 15219 Commissioner Roy M. Smith Regional Administrator, Region 1 West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendale Road Capitol Complex King of Prussia, Pennsylvania 19406 Charleston, WV 25305 l

John D. Borrows Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 1B1 1B0 East Broad Street Shippingport, Pennsylvania 15077 Columbus, Ohio 43266-0573 Director, Pennsylvania Emergency Management Agency Post Office Box 3321 Harrisburg, Pennsylvania 17105-3321 E

E