December 12,2012 ENERGY POINT BEAC 7

NRC 2012-01 18 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Unit 1 Docket No. 50-266 Renewed License No. DPR-24 Res~onse to Point Beach Nuclear Plant. Unit 1 NRC lnspection Re~ort 0500026612012009 Preliminarv White Findinq

References:

(1)

U.S. Nuclear Regulatory Commission, "Point Beach Nuclear Plant, Unit I - NRC lnspection Report 0500026612012009 Preliminary White Finding, December 4,2012 (ML12339A324)

The reference letter transmitted NRC Inspection Report 0500026612012-009, which provided the preliminary results of the Unit 1 turbine-driven auxiliary feedwater pump inspection completed on October 29, 2012, at Point Beach Nuclear Plant (PBNP). The letter identified a preliminary White finding that is being considered for escalated enforcement and provided NextEra Energy Point Beach, LLC (NextEra) the opportunity to either: 1) attend a Regulatory Conference; or 2) submit our position of the finding to the NRC in writing. The letter requested that NextEra contact Mr. Michael Kunowski, NRC Branch Chief of Reactor Projects, by phone and in writing 10 days from the issue date of the referenced letter of NextEra's intentions. In addition, the letter noted that if no response is received within 10 days, the NRC would continue with the significance determination and enforcement decision.

NextEra has elected to accept the finding as characterized and, therefore, is not requesting a predecisional enforcement conference. Mr. Mike Millen, Site Licensing Manager, informed Mr. Kunowski of this decision by phone on December 11,2012.

If you have any questions, please contact Mike Millen at 9201755-7845.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 This letter contains no new regulatory commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC Enclosure Michael Kunowski, Branch Chief, USNRC Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC