Point Beach Nuclear Plant Operated by Nudear Management Company, LLC March 4, 2005 NRC 2005-0032 42 USC 2332 Regional Administrator Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 CAL 3-04-001 Confirmatow Action Letter Action Step Completion
References:
(1) Nuclear Management Company, LLC Letter dated March 22, 2004, Commitments in Response to 95003 Supplemental Inspection Confi m a to ry Act ion Letter (2) NRC Letter dated April 21, 2004, transmitting CAL 3-04-001,
On January 19, 2005, representatives of Region 111 met with members of the Point Beach Nuclear Plant (PBNP) staff to discuss process changes being implemented to improve the quality of Confirmatory Action Letter (CAL) Action Step closure documentation. At that meeting, it was requested that Nuclear Management Company, LLC (NMC) notify the Nuclear Regulatory Commission (NRC) when CAL Action Steps are completed, to enable scheduling of NRC resources to inspect the completed work products.
In accordance with that request, eighty-eight (88) CAL commitment Action Steps listed in the enclosure to this letter have been completed and are available for review by the NRC.
There are no new commitments or revisions to existing commitments contained in this Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc:
Document Control Desk NRR Project Manager, Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Telephone 920.755.2321
ENCLOSURE POINT BEACH NUCLEAR PLANT CONFIRMATORY ACTION LETTER COMMITMENT ACTION STEPS AVAILABLE FOR NRC REVIEW This enclosure provides a listing of Point Beach Nuclear Plant (PBNP) Confirmatory Action Letter (CAL), CAL 3-04-001, commitment action steps that have been completed and are available for review by representatives of the Nuclear Regulatory Commission (NRC).
Focus Area: Human Performance Action Plan: OR-01 -004, Individual Behavior Excellence OR-01 -004.1 OR-01-004.5 OR-01 -004.8 OR-01 -004.1 1 OR-01-004.1 5 OR-01 -004.18 OR-01 -004.24 OR-01 -004.33 OR-0 1 -004.2 OR-0 1 -004.6 OR-01 -004.9 OR-0 1 -004.1 2 OR-01-004.16 OR-01 -004.19 OR-01 -004.26 OR-01 -004.34 OR-01 -004.3 OR-01 -004.7 OR-01 -004.10 OR-01 -004.14 OR-01 -004.1 7 OR-01 -004.22 OR-01 -004.28 Focus Area: Enaineerinn Oraanizational Effectiveness Action Plan: OR-08-005, Improve Human Performance in Engineering OR-08-005.13 OR-08-005.1 4 Action Plan: OR-08-007, Utilize the Quality Review Team 0 R-08-007.4 Action Plan: OR-08-01 5, Establish an Engineering Safety & Design Review Group OR-08-01 5.6 OR-08-01 5.7 Action Plan: OR-08-01 6, Reduce Operable But Degraded/Nonconforming Backlog OR-08-01 6.3 OR-08-01 6.4 OR-08-016.5 Note: Commitments associated with this Action Plan are complete.
Action Plan: OR-08-01 7, Operations and Engineering Interface OR-08-01 7.1 OR-08-01 7.2 OR-08-01 7.5 Page 1 of 4
Enclosure Confirmatory Action Letter Completed Action Steps Focus Area: Nuclear Oversiaht Effectiveness Action Plan: OR-02-001, Nuclear Oversight Assessment OR-02-001.2.A.1 OR-02-001.4 OR-02-001.7.E OR-02-001.6 Focus Area: Emeraencv Preparedness Action Plan: OP-09-004, Upgrade Emergency Action Levels (EALs)
OP-09-004.7 OP-09-004.8 OP-09-004.10 OP-09-004.11 OP-09-004.9 Action Plan: OP-09-005, Control/Maintenance of EP Required Equipment OP-09-005.4 OP-09-005.5 OP-09-005.9 OP-09-005.10 OP-09-005.7 Focus Area: Corrective Action Proaram Action Plan: OP-10-001, Improve CAP Action Request Screening and Prioritization OP-IO-001.14 Note: Commitments associated with this Action Plan are complete.
Action Plan: OP-10-004, CAP Resolution Effectively Addresses Problems OP-10-004.12 OP-10-004.15 OP-10-004.16 Action Plan: OP-10-006, Effective Root Cause Evaluations OP-10-006.14 Action Plan: OP-10-010, Operating Experience (OE) Improvement Plan OP-10-010.1 OP-10-010.4 OP-10-010.15 Action Plan: OP-10-011, Improve Effectiveness of Self-Assessment OP-IO-011.3.D OP-IO-011.4c OP-IO-011.5B OP-10-011.5D OP-10-011.7 OP-IO-011.5A OP-IO-011.5F Page 2 of 4
Enclosure Confirmatory Action Letter Completed Action Steps Action Plan: OP-I 0-01 3, Resolution of 2003 CAP Self-Assessment Areas for Improvement OP-10-013.16 Note: Commitments associated with this Action Plan are complete.
Focus Area: Configuration Manaqement Action Plan: OP-I 4-001, Improve the Configuration Management Program OP-I 4-001.I 1
OP-14-001.12 Action Plan: OP-14-003, Validate Design Basis for High Risk Systems OP-I 4-003.3 OP-I 4-003.5 Action Plan: OP-I 4-005, Validate and Integrate Calculations and Setpoints OP-I 4-005.3 OP-I 4-005.4 OP-I 4-005.6 OP-I 4-005.8 OP-I 4-005.5 Focus Area: Auxiliarv Feedwater System Action Plan: EQ-15-001, Auxiliary Feedwater ( A M ) Appendix R Firewall Project EQ-15-001.8 EQ-15-001.9 EQ-15-001.I 1
EQ-15-001.12 EQ-15-001.10 EQ-15-001.14 Action Pian: EQ-15-015, Auxiliary Feedwater Electrical Modifications EQ-15-015.5 Note: Commitments associated with this Action Plan are complete.
Focus Area: Management Effectiveness Action Plan: OR-05-008, AFW Root Cause Evaluation (RCE) Corrective Actions OR-05-008.1 OR-05-008.2 OR-05-008.4 OR-05-008.3 Page 3 of 4
Enclosure Confirmatory Action Letter Completed Action Steps Focus Area: Equipment Reliability Action Plan: EQ-15-011, Bolted Fault EQ-15.011.I 2
Action Plan: EQ-15-012, Manhole and Cable Vault Flooding EQ-15-012.8 Action Plan: EQ-15-016, Determine Condition of Underground Cables Which Have Been Sub merged EQ-15-016.4 EQ-15.016.6 Note: Commitments associated with this Action Plan are complete.
Page 4 of 4