Monthly Operating Rept for Dec 1989 for Fermi 2
ML19354D878
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1989
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-0006, CON-NRC-90-6 NUDOCS 9001230109
Download: ML19354D878 (4)


Text

.

.4

[

t i

.i Wilham S. Orser Ve(e Prepoent Naclear Operations Reg Guide 1.16 o~F' Detron

,er->>

1 EC S O n BirE @A N Ef L January 16, 1990 NRC-90-0006 i

i I

t U. S. Nuclear Regulatory Commission l

Attention: Document Control Desk l

Washington, D.C.

20555 i

Reference:

Fermi 2 t

NRC Docket No. 50-341 NRC Operating License No. NPF-43' i

(

Subject:

Monthly Operating Status Report for December, 1989 Enclosed for your information and use is the Fermi 2 Nonthly Operating Status Report for December, 1989. 'this report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and j

Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9 1.6.

l If you have any questions, please contact Patricia l

Anthony at (313) 586-1617.

l E

Sincerely 3

,g I

W. S. Orser'.

Vice President l

Nuclear Operations i

l l

Enclosure cc:

A. B. Davis i

J. R. Eckert D. R. Hahn R. W. Defayette/W. L. Axelson T. R. Quay W. G. Rogers 9001230109 891231 PDR ADOCK 05000341 I

R PDC d

i 1;

/1

\\

e l

4

OPERATlWG DATA RFP0iti

,w DOCKET NO. 50-341 COMPLETED RY P. M. Anthony DATE January 16, 1990 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

I 2.

REPORTING PERIOD: December, 1989 l # To be determined l

3 LICENSED THERMAL POWER (MWL):

3292 l + This number will be I

4.

NAMEPLATE RATING (GROSS MWe):

1154 l revised based ECAR testing.l

[

5.

DESIGN ELECT RATING (Net MWe): 1093+

l Removal or firth stage 1

l blading caused-the need to 1 6.

MAX DEPENDABLE CAP (CROSS MWe):

7.

MAX DEPENDABLE CAP (Net MWE):

l revise this.

l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE l

LAST REPORT, GIVE REASONS: None 9.

POWER LEVEL TO WHICil RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUNULATIVE
11. HRS IN REPORTING PERIOD 744 8760 17,006 j
12. IIRS REACTOR WAS CRITICAL 461.4 6074.4 11.096.9
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 285.8 5576 10,296.8
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (FWH) 478,224 16,332,510 29,361,962 t
17. GROSS ELECT ENERGY GEN (MWH) 122,360 5,466,264 9,744,357
18. NET ELECT ENERGY GEN (MWH) 104,952 5,222,778 9,304,912
19. UNIT SERVICE FACTOR 38.4 63.7

.__ 60.5

20. UNIT AVAILABILITY FACTOR 38.4 63 7 60.5
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 12.9 54.5 50.1
23. UNIT FORCED OUTAGE RATE 22.3 11.4 17 7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) i None.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

]

I 1

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2 DATE January 16, 1990 f

COMPLETED BY P. M. Anthony TELEPHOR (313) 586-1617 Month December, 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 60 2

0 18 101 3

0 19 0

4 0

20 23 5

0 21 95 6

0 22 293 7

0 23 62 8

0 24 100 9

0 25 479 10 0

26 518 11 0

27 501 12 0

28 187 8 13 0

29 483-14 0

30 629 15 0

31 917 16 32 i

t 9

h I

1

a UNIT SHUTDOWNS AND POWEM REDUCTIONS

-DOCMET NO.

50-341 DATE Jamsary 16. 1989' UNIT NAME Formt 2 COMPLETED BV P.

W.

Anthony g

TELEPW*sE (313)S86-1617 REPORT WONTH December. 1989 I

l 4

I I

I i

4 i

l l

I I

]

I i

1 NETHOD OF l LER l Sv5 l Comp l CAUSE & CORRECTIVE I

I NO.

I DATE 1 TYPE I DUR I REASON I SHUTTING DOwN l NO.

I CODE I CODF l ACTION TO PREVENT I

l l

(1) l (HRS)l (2) l THE REACTOR l

I (4) I (5) l RECURRENCE I

I I

I I

(3) i I

I I

i i

I I

l 1

i l

i i

I i

i i

I j 89-011

'I 09/05/89 S

375.8 l C

4 4

N/A l --- I ---- 1 Continued =lth refueling activities l'

.l t

?

l l

1 l Including leak rate testing and l

l l

l I

l l

l 1 turbine inspection and repair.

l 1

I I

I I

I I

I I

l 89-012 I 12/19/89 ] F l

G 3

89-036 i 58 l ISV Operator accidently pushed MSIV l

l l

l 8

l l

l I

l close pushbutton while verifying l'

l l

l l

l l

l I

thete logic to be reset.-

l 1

l t

i I

Il 25.5 li F

2 189-038 TA TG Fire occurred in the tagging of I 89-013 l 12/23/89 l F l

'l l

I i

i turbine.

Operator scrammed the l

l 1

l 1

l

] unit.

Lagging replaced; no other i

i l

1 I

i 1 damage occurred.

I I

l' I

I I

_l I

(1) F: FORCED (2) REASON:

(3) METHOOr (4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED

'A - EQUIPMENT FAILURE (EXPLAIN) 1.- MANUAL FOR PREPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - WANUAL SCRAM TNTRY SHEETS FOR LICENSEE C - REFUELING.

3 - AUTOMATIC SCRAM tWNT REPORT (LER) FILE D - REGULATORY RESTRICTION 4-CONTINUED

. (> ' AEG-0161)

E - OPERATOR, TRAINING & LICENSE EXAu1 NATION 5 - REDUCED LOAD F - ADw!NISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EAPLA I N).'