NRC-90-0006, Monthly Operating Rept for Dec 1989 for Fermi 2
| ML19354D878 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/31/1989 |
| From: | Anthony P, Orser W DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-90-0006, CON-NRC-90-6 NUDOCS 9001230109 | |
| Download: ML19354D878 (4) | |
Text
.
.4
[
t i
.i Wilham S. Orser Ve(e Prepoent Naclear Operations Reg Guide 1.16 o~F' Detron
,er->>
1 EC S O n BirE @A N Ef L January 16, 1990 NRC-90-0006 i
i I
t U. S. Nuclear Regulatory Commission l
Attention: Document Control Desk l
Washington, D.C.
20555 i
Reference:
Fermi 2 t
NRC Docket No. 50-341 NRC Operating License No. NPF-43' i
(
Subject:
Monthly Operating Status Report for December, 1989 Enclosed for your information and use is the Fermi 2 Nonthly Operating Status Report for December, 1989. 'this report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and j
Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9 1.6.
l If you have any questions, please contact Patricia l
Anthony at (313) 586-1617.
l E
Sincerely 3
,g I
W. S. Orser'.
Vice President l
Nuclear Operations i
l l
Enclosure cc:
A. B. Davis i
J. R. Eckert D. R. Hahn R. W. Defayette/W. L. Axelson T. R. Quay W. G. Rogers 9001230109 891231 PDR ADOCK 05000341 I
R PDC d
i 1;
/1
\\
e l
4
OPERATlWG DATA RFP0iti
,w DOCKET NO. 50-341 COMPLETED RY P. M. Anthony DATE January 16, 1990 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
I 2.
REPORTING PERIOD: December, 1989 l # To be determined l
3 LICENSED THERMAL POWER (MWL):
3292 l + This number will be I
4.
NAMEPLATE RATING (GROSS MWe):
1154 l revised based ECAR testing.l
[
5.
DESIGN ELECT RATING (Net MWe): 1093+
l Removal or firth stage 1
l blading caused-the need to 1 6.
MAX DEPENDABLE CAP (CROSS MWe):
7.
MAX DEPENDABLE CAP (Net MWE):
l revise this.
l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE l
LAST REPORT, GIVE REASONS: None 9.
POWER LEVEL TO WHICil RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUNULATIVE
- 11. HRS IN REPORTING PERIOD 744 8760 17,006 j
- 12. IIRS REACTOR WAS CRITICAL 461.4 6074.4 11.096.9
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 285.8 5576 10,296.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (FWH) 478,224 16,332,510 29,361,962 t
- 17. GROSS ELECT ENERGY GEN (MWH) 122,360 5,466,264 9,744,357
- 18. NET ELECT ENERGY GEN (MWH) 104,952 5,222,778 9,304,912
- 19. UNIT SERVICE FACTOR 38.4 63.7
.__ 60.5
- 20. UNIT AVAILABILITY FACTOR 38.4 63 7 60.5
- 22. UNIT CAP FACTOR (USING DER NET) 12.9 54.5 50.1
- 23. UNIT FORCED OUTAGE RATE 22.3 11.4 17 7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) i None.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
]
I 1
I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE January 16, 1990 f
COMPLETED BY P. M. Anthony TELEPHOR (313) 586-1617 Month December, 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 60 2
0 18 101 3
0 19 0
4 0
20 23 5
0 21 95 6
0 22 293 7
0 23 62 8
0 24 100 9
0 25 479 10 0
26 518 11 0
27 501 12 0
28 187 8 13 0
29 483-14 0
30 629 15 0
31 917 16 32 i
t 9
h I
1
a UNIT SHUTDOWNS AND POWEM REDUCTIONS
-DOCMET NO.
50-341 DATE Jamsary 16. 1989' UNIT NAME Formt 2 COMPLETED BV P.
W.
Anthony g
TELEPW*sE (313)S86-1617 REPORT WONTH December. 1989 I
l 4
I I
I i
4 i
l l
I I
]
I i
1 NETHOD OF l LER l Sv5 l Comp l CAUSE & CORRECTIVE I
I NO.
I DATE 1 TYPE I DUR I REASON I SHUTTING DOwN l NO.
I CODE I CODF l ACTION TO PREVENT I
l l
(1) l (HRS)l (2) l THE REACTOR l
I (4) I (5) l RECURRENCE I
I I
I I
(3) i I
I I
i i
I I
l 1
i l
i i
I i
i i
I j 89-011
'I 09/05/89 S
- 375.8 l C
4 4
N/A l --- I ---- 1 Continued =lth refueling activities l'
.l t
?
l l
1 l Including leak rate testing and l
l l
l I
l l
l 1 turbine inspection and repair.
l 1
I I
I I
I I
I I
l 89-012 I 12/19/89 ] F l
G 3
89-036 i 58 l ISV Operator accidently pushed MSIV l
l l
l 8
l l
l I
l close pushbutton while verifying l'
l l
l l
l l
l I
thete logic to be reset.-
l 1
l t
i I
Il 25.5 li F
2 189-038 TA TG Fire occurred in the tagging of I 89-013 l 12/23/89 l F l
'l l
I i
i turbine.
Operator scrammed the l
l 1
l 1
l
] unit.
Lagging replaced; no other i
i l
1 I
i 1 damage occurred.
I I
l' I
I I
_l I
(1) F: FORCED (2) REASON:
(3) METHOOr (4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED
'A - EQUIPMENT FAILURE (EXPLAIN) 1.- MANUAL FOR PREPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - WANUAL SCRAM TNTRY SHEETS FOR LICENSEE C - REFUELING.
3 - AUTOMATIC SCRAM tWNT REPORT (LER) FILE D - REGULATORY RESTRICTION 4-CONTINUED
. (> ' AEG-0161)
E - OPERATOR, TRAINING & LICENSE EXAu1 NATION 5 - REDUCED LOAD F - ADw!NISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EAPLA I N).'
(S) EMNISIT 1 - SA#E SOURCE
., a
,,, -....,..---;~.,; - _.. _ _...,..
..a.
. -.,.. ~ < -