NRC-03-0082, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process
| ML033030458 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/22/2003 |
| From: | O'Connor W Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-0082 | |
| Download: ML033030458 (26) | |
Text
William T. O'Connor, Jr.
Vice President, Nuclear Generation Fermi 2 0400 North Dixie Hwy., Newport, Michigan 48166 Tel: 734-5S6-5201 Fax: 734-5864172 DTE Energy-October 22, 2003 NRC-03-0082 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process Pursuant to 10 CFR 50.90, Detroit Edison hereby requests an amendment to the Technical Specifications (TS) for Fermi, Unit 2.
The proposed amendment will delete the TS requirements related to hydrogen recombiners, and hydrogen /oxygen monitors. The proposed TS changes support implementation of the revisions to 10 CFR 50.44, "Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors," that became effective on October 16, 2003. The changes are consistent with Revision 1 of NRC-approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-447, "Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors." The availability of this TS improvement was announced in the Federal Register on September 25, 2003 as part of the Consolidated Line Item Improvement Process (CLIIP). provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications and commitments.
USNRC NRC-03-0082 Page 2 provides the existing TS pages marked-up to show the proposed change. Attachment 3 provides revised clean TS pages. Implementation of TSTF-447 also involves various changes to the TS Bases. The TS Bases changes will be submitted with a future update in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program."
Detroit Edison requests approval of the proposed License Amendment by January 30, 2004, with the amendment being implemented within the next 90 days.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Michigan State Official.
If you should have any questions regarding this submittal, please contact Norman K.
Peterson at (734) 586-4258.
Sincerely, Attachments:
- 1. Description and Assessment
- 2. Proposed Technical Specification Changes
- 3. Revised Technical Specification Pages cc:
H. K. Chemoff M. A. Ring NRC Resident Office Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission
USNRC NRC-03-0082 Page 3 I, WILLIAM T. O'CONNOR, JR., do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
WILLIAM T. O'CONNOR, Vice President - Nuclear Genera n
On this
?1n' day of O64bZ
, 2003 before me personally appeared William T. O'Connor, Jr., being first duly sworn and says that he executed the foregoing as his free act and deed.
NOMANK. PETERSON IOTARYPUBUOMONROE CO., P W SWUON EXPIRES Jul 24, 2006 Notary Public 7
-i,
_~
~ ~~~~
- i.
_ ~
~ ~ ~ ~ ~ ~~'
.s*_
to NRC-03-0082 Page I ATTACHMENT 1 DESCRIPTION and ASSESSMENT
1.0 DESCRIPTION
The proposed License amendment deletes Technical Specification (TS) 3.6.3.1, "Primary Containment Hydrogen Recombiners," and references to the hydrogen and oxygen monitors in TS 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation." The proposed TS changes support implementation of the revisions to 10 CFR 50.44, "Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors," that became effective on October 16, 2003. The deletion of the requirements for the hydrogen recombiner and references to hydrogen/oxygen monitors resulted in numbering and formatting changes to other TS, which were otherwise unaffected by this proposed amendment.
The changes are consistent with Revision I of NRC-approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-447, "Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors." The availability of this TS improvement was announced in the Federal Register on September 25, 2003 as part of the Consolidated Line Item Improvement Process (CLIIP).
2.0 DESCRIPTION
OF PROPOSED AMENDMENT Consistent with the NRC-approved Revision 1 of TSTF-447, the proposed TS changes include:
TS 3.3.3.1, Condition D Inoperable Hydrogen or Oxygen Monitors Deleted Table 3.3.3.1-1 Items 7 and 8, Primary Containment Oxygen and Hydrogen Concentration Deleted TS 3.6.3.1 Primary Containiment Hydrogen Recombiners Deleted Other TS changes included in this application are limited to renumbering and formatting changes that resulted directly from the deletion of the above requirements related to hydrogen recombiners and hydrogen and oxygen monitors.
As described in NRC-approved Revision 1 of TSTF-447, the changes to TS requirements and associated renumbering of other TSs results in changes to various TS Bases sections. The TS Bases changes will be submitted with a future update in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program."
to NRC-03-0082 Page 2
3.0 BACKGROUND
The background for this application is adequately addressed by the NRC Notice of Availability published on September 25, 2003 (68 FR 55416), TSTF-447, the documentation associated with the 10 CFR 50.44 rulemaking, and other related documents.
4.0 REGULATORY REQUIREMENTS AND GUIDANCE The applicable regulatory requirements and guidance associated with this application are adequately addressed by the NRC Notice of Availability published on September 25, 2003 (68 FR 55416), TSTF-447, the documentation associated with the 10 CFR 50.44 rulemaking, and other related documents.
5.0 TECHNICAL ANALYSIS
Detroit Edison has reviewed the safety evaluation (SE) published on September 25, 2003 (68 FR 55416) as part of the CLIIP Notice of Availability. This verification included a review of the NRC staffs SE, as well as the supporting information provided to support TSTF-447. Detroit Edison has concluded that the justifications presented in the TSTF proposal and the SE prepared by the NRC staff are applicable to Fermi 2 and justify this amendment for the incorporation of the changes to the Fermi 2 TS.
6.0 REGULATORY ANALYSIS
A description of this proposed change and its relationship to applicable regulatory requirements and guidance was provided in the NRC Notice of Availability published on September 25, 2003 (68 FR 55416), TSTF-447, the documentation associated with the 10 CFR 50.44 rulemaking, and other related documents.
6.1 Verification and Commitments As discussed in the model SE published in the Federal Register on September 25, 2003 (68 FR 55416) for this TS improvement, Detroit Edison is making the following verifications and regulatory commitments:
- 1.
Detroit Edison has verified that a hydrogen monitoring system capable of diagnosing beyond design-basis accidents is installed at Fermi 2 and is making a regulatory commitment to maintain that capability. The hydrogen monitors will be included in the Technical Requirements Manual (TRM). This regulatory commitment will be implemented by April 30, 2004.
- 2.
Fermi 2 has an inerted containment. Detroit Edison has verified that an oxygen monitoring system capable of verifying the status of the inerted containment is installed at Fermi 2 and
Attachment I to NRC-03-0082 Page 3 is making a regulatory commitment to maintain that capability. The oxygen monitors will be included in the TRM. This regulatory commitment will be impleme6nted by April 30, 2004.
7.0 NO SIGNIFICANT HAZARDS CONSIDERATION Detroit Edison has reviewed the proposed no significant hazards consideration determination published on September 25, 2003 (68 FR 55416) as part of the CLIIP. Detroit Edison has concluded that the proposed determination presented in the notice is applicable to Fermi 2 and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91 (a).
8.0 ENVIRONMENTAL EVALUATION Detroit Edison has reviewed the environmental evaluation included in the model SE published on September 25, 2003 (68 FR 55416) as part of the CLIIP. Detroit Edison has concluded that the staffs findings presented in that evaluation are applicable to Fermi 2 and the evaluation is hereby incorporated by reference for this application.
9.0 PRECEDENT This application is being made in accordance with the CLIIP. Detroit Edison is not proposing variations or deviations from the TS changes described in TSTF-447 or the N RC staffs model SE published on September 25, 2003 (68 FR 55416).
10.0 REFERENCES
Federal Register Notice: Notice of Availability of Model Application Concerning Technical Specification Improvement To Eliminate Hydrogen Recombiner Requirement, and Relax the Hydrogen and Oxygen Monitor Requirements for Light Water Reactors Using the Consolidated Line Item Improvement Process, published September 25, 2003 (68 FR 55416).
ATTACHMENT 2 TO NRC-03-0082 Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
TABLE OF CONTENTS 3.6 CONTAINMENT SYSTEMS (continued) 13 5&.,- _
Prima y-Crntainment HydroAefftl~ecombiners.
3.6.3AXfrYin PrimarY Containment Oxvaen Concentration..
-Id_
3.6.4T' 1
3.6.4.2 3.6.4.3 Secondary Containment..
Secondary Containment Isolation Valves (SCIVs).
Standby Gas Treatment (SGT) System.
3.6-40 3.6-43 3.6-47 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 3.7.8 3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 3.8.7 3.8.8 3.9 3.9.1 3.9.2 3.9.3 3.9.4 3.9.5 3.9.6 3.9.7 3.9.8 PLANT SYSTEMS Residual Heat Removal Service Water (RHRSW) System Emergency Equipment Cooling Water (EECW)/
Emergency Equipment Service Water (EESW) System and Ultimate Heat Sink (UHS)
Control Room Emergency Filtration (CREF) System..
Control Center Air Conditioning (AC) System.
Main Condenser Offgas.
The Main Turbine Bypass System and Moisture Separator Reheater.
Spent Fuel Storage Pool Water Level Emergency Diesel Generator Service Water (EDGSW)
System.....................
ELECTRICAL POWER SYSTEMS.
AC Sources -Operating...............
AC Sources -Shutdown.
Diesel Fuel Oil., and Starting Air DC Sources -Operating DC Sources -Shutdown.
Battery Cell Parameters Distribution Systems-Operating..........
Distribution Systems-Shutdown.
3.7-1 3.7-1 3.7-3 3.7-6 3.7-11 3.7-14 3.7-16 3.7-18 3.7-19 3.8-1 3.8-1 3.8-10 3.8-13 3.8-16 3.8-19 3.8-22 3.8-26 3.8-28 3.9-1 3.9-1 3.9-3 3.9-5 3.9-6 3.9-8 3.9-9 3.9-10 3.9-12 REFUELING OPERATIONS...............
Refueling Equipment Interlocks.
Refuel Position One-Rod-Out Interlock.
Control Rod Position.
Control Rod Position Indication Control Rod OPERABILITY -Refueling.
Reactor Pressure Vessel (RPV) Water Level Residual Heat Removal (RHR)- High Water Level Residual Heat Removal (RHR)- Low Water Level.
(continued)
FERMI - UNIT 2 iii Amendment No. 134
PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 APPLICABILITY:
The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTES---------------------------------
- 1. LCO 3.0.4 is not applicable.
- 2. Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.
status.
B.
Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.7.
not met.
C.
NOTE-C.1 Restore one required 7 days No pplicable to channel to OPERABLE prima contai ent status.
hydrogen n primary containm t xygen conce ation cha els.
One or more Functions with two required channels inoperable.
(continued)
FERMI - UNIT 2 3.3-24 Amendment No. 134
PAM Instrumentation 3.3.3.1 ArTTnmNS
( rnnti n ed)
A-C I
R A
V C
E TIM-CONDITION REQUIRED ACTION I COMPLETION TIM_
.1
-4 D. Two required prim containment hy pen concentrati channels inoperab
_/
Two required primary containment oxygen concentration channels inoperable.
1 Restore one r(
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ion channel E status.
Restore one required primary containmen oxygen concentra on channel to OP LE status.
hours
+
Ac.
i 07 "r-T W.i ),
Required Action and associated Completion Time of Condition C gNEkSnot met.
Enter the Condition referenced in Table 3.3.3.1-1 for the channel.
Immediately 4
4 As required by A
Required Actiong.1 and referenced in Table 3.3.3.1-1.
Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 4
+
As required by S
Required Action [.1 and referenced in Table 3.3.3.1-1.
.1 Initiate action in accordance with Specification 5.6.7.
Immediately FERMI - UNIT 2 3.3-25 Amendment No. 134
i pAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS
-NOTE----------------
These SRs apply to each Function in Table 3.3.3.1-1.
SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK.
31 days
_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
k l SR 3.3.3.1.2
....... O-NOTES ---- --- -a----
- 1. nly applicable to Functio 7 and 8.
Not required to be per rmed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one cha el. and 7 days for the second ch el. after
> 15X RTP../
.Pr Perform HANNw
'CIRPATIOnm I
2 dav; I
i..
SR 3.3.3.1. d NOTE..................
I4,__
Ot applic o ntion nd 8.
>'g.
Radiation detectors are excluded.
Perform CHANNEL CALIBRATION.
18 months
(.
FERMI - UNIT 2 3.3 26 Amendment No. 134
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)
I Post Accioent Monitoring Instrumentation FUNCTION
- 1. Reactor Vessel Pressure
- 2. Reactor Vessel Water Level - Fuel Zone
- 3. Reactor Vessel Water Level - Wide Range
- 4. Suppression Pool Water Level
- 5. Suppression Pool Water Temperature
- 6. Drywell Pressure Wide Range I
F*
Pri ry Containment 02 centration Primary Contai iH Concentratio cR
> X Primary Containment High Range Radiation Monitor PCIV Position CONDITIONS REFERENCED REQUIRED FROM REQUZEED CHANNELS A.TION 2
2 E
2 2
X 2
2 X
2 0
2
/ F X
2 2er enet44-(a) Not reouired for isolation valves whose associated penetration flow path is isolated by at least one closed and deactivated automatic valve. closed manual valve. blind flange. or check valve with flow through the valve secured.
(b) Only-one position indication channel is required for penetration flow paths with only one installed control room indication channel.
FERMI - UNIT 2 3.3 -27 Amendment No. 134
3.6 NTAINMENT SYSTEMS 3.6.3.1 jimary Containment LCO 3.6.3.1 Two primary OPERABLE.
APPLICABILITY:
~
~
~
~
Primary Containment Hydrogen Recombiners r
~~~~~~~3.6.3.1 Hydrogen Recombiners containment hydrogen recombiners shall
- 2.
1
(
CONDITION REQUIRED ACTION/
COMPLETION TIME A. One primary A.1 NO containment hydrogen LCO 3.0. is not recombiner inoperable.
plic e.
R e primary
- 30. days ntai nt hydrogen recombin to
/ OPERABLEs u.
B. Two primary B.1 Verify by I hour containment hydrogen administrative mean recombiners that the hydrogen AND inoperable.
control function is maintained.
e per
/~~~~~~~~~~~~
12 urs
/.
~~~~~~~~~~the
~fer AND B.2 Restore one primary 7 days containment hydrogen recombiner to OPERABLE status.
J
/
(continued) 1.01
(
FERMI UNIT 2 3.6-37 Amendment No. 134
X r__s:_I.. i s2 Primary Containment Hydrogen Recombiners 3.6.3.
I ALTIUN (conilnuea)
ONDITION REQUIRED ACTION COMPLET N TIME C. Required A ion and C.1 Be in MODE 3.
1 ours associated petion Time not met
\\
SURVEILLANCE REQUIREMENTS SURVEILLANX FREQUENCY SR 3.6.3.1.1 Perform a system f I al test for each 18 months primary containm hydro n recombiner.
SR 3.6.3.1.2 Visually xamine each primary con inment 18 months hydroge recombiner enclosure and vify ther is no evidence of abnormal SR 6tions.
t SR 3.6.3 Perform a resistance to ground test for 2
nths
/
~each heater phase.\\
I
__I FERMI - UNIT 2 3.6-38 Amendment No. 134
Primary Containment Oxygen Concentration 3.6 CONT NMENT SYSTEMS 3.6.3.
Primary Containment Oxygen Concentration LCO 3.6.3 The primary containment oxygen concentration shall be
< 4.0 volume percent.
APPLICABILITY:
MODE 1 during the time period:
- a.
From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is > 15' RTP following startup, to
- b. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to prior to reducing THERMAL POWER to < 15X RTP the next reactor shutdown.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore oxygen 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> oxygen concentration concentration to not within limit.
within limit.
B. Required Action and B.1 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> associated Completion to s 13% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3..1 Verify primary containment oxygen 7 days concentration is within limits.
FERMI UNIT 2 3.6-39 Amendment No. 134
Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.6 Safety Relief Valve Challenge ReDort The main steam line Safety Relief Valve SRV) Report documenting all challenges to SRVs during the previous calendar year shall be submitted by April 30 of each year.
5.6.7 PAM ReDort When a report is required by Condition B of LCO 3.3.3.1,
'Post Accident-Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days; The report shall outline the action taken, the cause of the inoperability. and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
FERMI - UNIT 2
- 5.
0:22 Amendment No. 134
ATTACHMENT 3 TO NRC-03-0082 Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process PROPOSED TECHNICAL SPECIFICATION PAGES
TABLE OF CONTENTS 3.6 CONTAINMENT SYSTEMS (continued) 3.6.3.1 Primary Containment Oxygen Concentration.............. 3.6-39 3.6.4.1 Secondary Containment 3.6-40 3.6.4.2 Secondary Containmentlis6olti6onValvsCI.V.
3.6-43 3.6.4.3 Standby Gas Treatment SGT) System
........ 3.6-47 3.7 PLANT SYSTEMS 3.7-1 3.7.1 Residual He.t v Serice Water IR§J5 System 3.7-1 3.7.2 Emergency Equipment Cooling Water (EECW)/
Emergency Equipment Service Water (EESW) System and Ultimate Heat Sink (UHS) 3.7-3 3.7.3 Control Room Emergency Filtrati6 hCtPj Systi1.... 3.7-6 3.7.4 Control Center Air Conditioning (AC) System.3.7-11 3.7.5 Main Condenser Offgas 3.7-14 3.7.6 The Main Turbine Bypass System and37 Moisture Separator Reheater 3.7-16 3.7.7 Spent Fuel Storage Pool Water eel..
3.7-18 3.7.8 Emergency Diesel Generator Service Wt 6SW...
).
.7 System 3.7-19 3.8 ELECTRICAL POWERSYTEM.S.3.8-1 3.8.1 AC Sources-Operating..
3.8-1 3.8.2 AC Sources-Shutdown 3.8-10 3.8.3 Diesel Fuel Oil, and StatingAir 3.8-13 3.8.4 DC Sources-Operating...................
3.8-16 3.8.5 DC Sources-Shutdown
. 3.8-19 3.8.6 Battery Cell Parameters 3.8-22
-3.8.7 Distribution Systems-Oerating 3.8-26 3.8.8 Distribution Systems-S tdown.
38-28 3.9 REFUELING OPERATIONS 3.9-1 3.9.1 Refueling Equipmentlhteoi..
ks.3.9-1 3.9.2 Refuel Position One-Rod-Out Inte.k.
3.9-3 3.9.3 Control Rod Position 39-5 3.9.4 Control Rod PositionIndiation..
3.9-6 3;9.5 Control Rod OPERABILITY-Refuelfig.3.9-8 3.9.6 Reactor Pressure Vessel (RPV)
Water 3.9-9 3.9.7 Residual Heat Removal (RHR)- High Water L 3.9-10 3.9.8 Residual Heat Removal (RHR)- Low Water Level 3.9-12 (continued)
FERMI - UNIT 2 iii Amendment No. 134,
PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 APPLICABILITY:
The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTES------------------------------------
- 1. LCO 3.0.4 is not applicable.
- 2. Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.
status.
B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.7.
not met.
C. One or more Functions C.1 Restore one required 7 days with two required channel to OPERABLE channels inoperable.
status.
(continued)
.1 FERMI - UNIT 2 3.3 Amendment No. 134,
PAM Instrumentation 3.3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C Table 3.3.3.1-1 for not met.
the channel.
E. As required by E.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action D.1 and referenced in Table 3.3.3.1-1.
F. As required by F.1 Initiate action in Immediately Required Action D.1 accordance with and referenced in Specification 5.6.7.
Table 3.3.3.1-1.
I I
I FERMI - UNIT 2 3.3-25 Amendment No. NA4,
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS
....... NOTE----------------------------------'
These SRs apply to each Function in Table 3.3.3.1-1.
SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK.
31 days SR 3.3.3.1.2 NOTE----------..--.....
Radiation detectors are excluded.
Perform CHANNEL CALIBRATION.
18 months FERMI - UNIT 2 3.3-26 Amendment No. E
PAM Instrumentation 3.3.3.1 Table 3.3.3.1.1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1
- 1. Reactor Vessel Pressure 2
E
- 2. Reactor Vessel Water Level Fuel Zone 2
E
- 3. Reactor Vessel Water Level Wide Range 2
E
- 4. Suppression Pool Water Level 2
E
- 5. Suppression Pool Water Temperature 2
E
- 6. Drywell Pressure - Wide Range 2
E
- 7. Primary Containment High Range Radiation Monitor 2
F
- 8. PCIV Position
.2 per penetration E
flow path(a)(b)
I (a) Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange. or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
FERMI - UNIT 2 3.3-27 Amendment No. X4.
THIS PAGE INTENTIONALLY LEFT BLANK FERMI - UNIT 2 3.6-37 Amendment No. 184,
THIS PAGE INTENTIONALLY.LEFT BLANK FERMI - UNIT 2 3.6-38 Amendment No. 14.
Primary Containment Oxygen Concentration 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Primary Containment Oxygen Concentration I
LCO 3.6.3.1 APPLICABILITY:
The primary containment oxygen concentration shall be
< 4.0 volume percent.
MODE 1 during the time period:
- a. From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is > 15X RTP following startup, to
- b. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to reducing THERMAL POWER to < 15% RTP prior to the next reactor shutdown.
I1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore oxygen 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> oxygen concentration concentration to not within limit.
within limit.
B. Required Action and B.1 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> associated Completion to 15% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1.1 Verify primary containment oxygen 7 days concentration is within limits.
I FERMI - UNIT 2 3.6-39 Amendment No. 2134,
Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.6 Safety Relief Valve Challenge Report The main steam line Safety Relief Valve (SRV) Report documenting all challenges to SRVs during the previous calendar year shall be submitted by April 30 of each year.
5.6.7 PAM Report When a report is required by Condition B or F of LCO 3.3.3.1,
'Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the action taken, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
FERMI - UNIT 2 5.0-22 Amendment No. Add,