NRC-02-0022, Answer to NRC Order for Interim Safeguards and Security Compensatory Measures
| ML020850657 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/18/2002 |
| From: | Gipson D Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-02-0022 | |
| Download: ML020850657 (5) | |
Text
Douglas R. Gipson Executive Vice President, Power Generation and Chief Nuclear Officer 111 E 1st St., Monroe, MI 48161-2199 Tel: 734.384.2650 Fax: 734.384.2654 Detroit Edison A DTE Energy Company SAFEGUARDS INFORMATION March 18, 2002 NRC-02-0022 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Reference:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) Letter from S. J. Collins (NRC) to D. R. Gipson (Detroit Edison) dated February 25, 2002, "Issuance of Order for Interim Safeguards and Security Compensatory Measures for Fermi, Unit 2"
Subject:
Answer to NRC Order for Interim Safeguards and Security Comnpensatory Measures for Fermi, Unit 2 Enclosed is the Detroit Edison response to the NRC Order contained in Reference 2.
If there are any questions regarding this response, please contact Mr. Norman K.
Peterson, Manager, Nuclear Licensing at (734) 586-4258.
Sincerely, Douglas I/ Gipson Executive Vice President - Power Generation and Chief Nuclear Officer NOTICE: Attachment 2 to this letter contains "Safeguards Information". Upon separation of Attachment 2, this letter and Attachment 1 to this letter are "DECONTROLLED".
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION USNRC NRC-02-0022 Page 2 Attachments: (1) Answer to Commission Order of February 25, 2002 (2) Interim Compensatory Measures for High Threat Environment cc:
T. J. Kim (w/ Attachment 1)
NRC Resident Office (w/ Attachments 1 and 2)
Regional Administrator, Region III (w/ Attachments 1 and 2)
U. S. Nuclear Regulatory Commission (w/ Attachments 1 and 2)
Attention: Mr. Samuel J. Collins Mail Stop O-5E7 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission (w/ Attachments 1 and 2)
Attention: Mr. Glenn M. Tracy Mail Stop O-6H16 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NOTICE: Attachment 2 to this letter contains "Safeguards Information". Upon separation of Attachment 2, this letter and Attachment 1 to this letter are "DECONTROLLED".
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION USNRC NRC-02-0022 Page 3 bcc: (w/ Attachments 1 and 2)
J. H. Korte N. K. Peterson (w/ Attachment 1)
G. D. Cerullo D. K. Cobb D. R. Gipson R. W. Johnson R. W. Libra P. A. Marquardt W. T. O'Connor, Jr.
S. Stasek Electronic Licensing Library (ELL) (200 TAC)
Information Management (140 NOC)
NSRG Secretary/ISEG Coordinator (220 TAC)
NRR Chron File NOTICE: Attachment 2 to this letter contains "Safeguards Information". Upon separation of Attachment 2, this letter and Attachment I to this letter are "DECONTROLLED".
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION NRC-02-0022 Page 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
Docket No. 50-341 THE DETROIT EDISON COMPANY
)
License No. NPF-43 FERMI - 2
)
EA-02-026 ANSWER TO COMMISSION ORDER OF FEBRUARY 25. 2002 NOW comes The Detroit Edison Company and by way of Answer To The Commission's Order says that it consents to the issuance of the Order. Further, The Company says that it has already implemented many of the interim measures set forth in the Order. A discussion of each of the interim measures is included in Attachment 2 to this Answer along with dates for completion of items not already implemented. Some of the interim measures are not applicable to the Fermi 2 plant design and these are clearly discussed in Attachment 2. Detroit Edison believes that it will be able to comply with all of the interim measures considered necessary for the Fermi 2 plant design within the time limits established in the Order, and the schedule for implementation of these interim measures is included in Attachment 2. None of the interim measures identified in the Order will cause Detroit Edison to be in violation of the provisions of any Commission regulation or the Fermi 2 facility license.
Detroit Edison will notify the NRC by letter if changes in methods of, or schedules for, complying with their interim measures are determined to be necessary; and as required by the NOTICE: Attachment 2 contains "Safeguards Information".
Upon separation of Attachment 2, this Attachment is "DECONTROLLED".
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION NRC-02-0022 Page 2 Order, Detroit Edison will report when full compliance with the applicable interim measures are completed.
The Detroit Edison Company By: Dougl s
Executive Vice President - Power Generation and Chief Nuclear Officer I, Douglas R. Gipson, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
Douglas, R.
ipson Executive Vice President - Power Generation and Chief Nuclear Officer On this __
_day of
,2002, before me personally appeared Douglas R. Gipson, being duly sworn and says that he executed the foregoing as his free act and deed.
Notary Public WORMAN K PETERSON Noiwy Pubkk Monroe Couoiy W
- Qaiinibd Eiqkws.M 24, 2=O NOTICE: Attachment 2 contains "Safeguards Information".
Upon separation of Attachment 2, this Attachment is "DECONTROLLED".
SAFEGUARDS INFORMATION