NLS2019017, Submittal of Change to Emergency Plan Implementing Procedure

From kanterella
Jump to navigation Jump to search
Submittal of Change to Emergency Plan Implementing Procedure
ML19100A133
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/02/2019
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2019017
Download: ML19100A133 (1)


Text

,,

N Nebraska Public Power District NLS2019017 April 2, 2019 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sir or Madam:

50.54(q) 72.44(f)

The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.10, Personnel Assembly and Accountability (Revision 42), and provide a summary of the associated 10 CFR 50.54( q) analysis for the change t~ the EPIP.

This letter contains no commitments. If you have any questions regarding this submittal, please contact me at ( 402) 825-2788.

Sincerely, f)~ w VAeZtp.-#r- -1 ~ ~

Jim Shaw Licensing Manager

/bk

Attachment:

Report of Change and Summary of 50.54( q) Analysis Emergency Plan Implementing Procedure 5.7.10, Revision 42

Enclosure:

Emergency Plan Implementing Procedure 5. 7.10, Revision 42 cc:

Regional Administrator, w/ attachment and enclosure (2)

USNRC - Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402} 825-3811 / Fax: (402} 825-5211 www.nppd.com