N Committed to Nuclear Excellenc Duane Arnold Energy Center Operated by Nuclear Management Company, LLC April 14, 2004 NG-04-0226 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: uRevised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, 11 k . 'p. ..

Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

- itJ'. . ;t,; vo 1 .l.i . . $  ! 4I .'. _:Jo t "',: *-: ;

Enclosure:

OPERATING DATA REPORT S 9 . * ,! , I .', , t '" I I .

! -. ~ . ,;l ,'?1; .4 ^  ;'.s  : - -.1 .

3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

April 14, 2004 Enclosure to NG-04-0226 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE April 5, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING March 2004

-- -,- -PERIOD: -

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month! Yr-to-Date Cumulative

3. Number of Hours the Reactor was 744.00 2184.00 203,862.27 Critical
4. Number of Hours Generator On-line 744.00 2184.00 199,469.52
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 435,371.50 1,278.710.70 93,233,986.38 (MWHrs)

UNIT SHUTDOWNS Type Method Method Cause &

F: Forced of Corrective S: Duration Shuttin Action No.-I Date, Scheduled- i(HourslY -Reaon_1

- A

-Down

- - L

-Comments--

2 Method:

'Reason:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

April 14, 2004 Enclosure to NG-04-0226 Page 2 of 2 NARRATIVE

SUMMARY

During the month, departures from full power operation occurred for the following:

1.) On March 13 for High Pressure Coolant Injection system testing.

2.) On March 25 for a load line adjustment.

Text

N Committed to Nuclear Excellenc Duane Arnold Energy Center Operated by Nuclear Management Company, LLC April 14, 2004 NG-04-0226 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: uRevised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, 11 k . 'p. ..

Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

- itJ'. . ;t,; vo 1 .l.i . . $  ! 4I .'. _:Jo t "',: *-: ;

Enclosure:

OPERATING DATA REPORT S 9 . * ,! , I .', , t '" I I .

! -. ~ . ,;l ,'?1; .4 ^  ;'.s  : - -.1 .

3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

April 14, 2004 Enclosure to NG-04-0226 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE April 5, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING March 2004

-- -,- -PERIOD: -

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month! Yr-to-Date Cumulative

3. Number of Hours the Reactor was 744.00 2184.00 203,862.27 Critical
4. Number of Hours Generator On-line 744.00 2184.00 199,469.52
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 435,371.50 1,278.710.70 93,233,986.38 (MWHrs)

UNIT SHUTDOWNS Type Method Method Cause &

F: Forced of Corrective S: Duration Shuttin Action No.-I Date, Scheduled- i(HourslY -Reaon_1

- A

-Down

- - L

-Comments--

2 Method:

'Reason:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

April 14, 2004 Enclosure to NG-04-0226 Page 2 of 2 NARRATIVE

SUMMARY

During the month, departures from full power operation occurred for the following:

1.) On March 13 for High Pressure Coolant Injection system testing.

2.) On March 25 for a load line adjustment.