Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter
ML24260A056
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/23/2024
From: Clark J
Security Performance Evaluation Branch
To: Carr E
Virginia Power (Virginia Electric & Power Co)
Shared Package
ML24260A057 List:
References
IR 2024420
Download: ML24260A056 (1)


Text

SUBJECT:

(U) NORTH ANNA POWER STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000338/2024420 AND 05000339/2024420

Dear Eric S. Carr:

(U) On August 13, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Stewart W. Morris, Director Safety & Licensing and other members of your staff. The results of this inspection are documented in the enclosed report.

(U) One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

(U) If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at North Anna Power Station, Units 1 and 2.

(U) The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.14] - Conservative Bias.

(U) If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at North Anna Power Station, Units 1 and 2.September 23, 2024 2 (U) This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

(U) The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

(U) The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7 Cc w/encl: Thomas Hayden, Manager Nuclear Protection Services - North Anna Lisa Hilbert, Site Vice President - North Anna cc w/o encl: Distribution via LISTSERV Signed by Clark, Jefferson on 09/23/24

ML24260A057; Ltr ML24260A056 OFFICE NSIR/DSO/SPEB/ETA R-II/DRS/PSB NSIR/DSO/SPEB NSIR/DSO/SPEB

/ETC /ETA NAME AWoyansky AW JBrown JBDBradfield DB JClark JC DATE Sep 16, 2024 Sep 17, 2024 Sep 20, 2024 Sep 23, 2024