05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation

(Redirected from ML23164A230)

{{#if:06/13/2023|{{#if:05000333|{{#if: | {{#invoke:Navbox|navbox}}{{#arraymap:|,|xx|[[Project::xx| ]]| }} | {{#if:{{#ask:[[{{#arraymap:NRC/NRR, NRC/Document Control Desk|,|xx|xx|||}}]]}}|{{#if:{{#ask:document::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation[[Project::+]][[issue date::<{{#time:m-d-Y|06/13/2023 + 9 months}}]]|mainlabel=-|?Project=|link=none|limit=1|sort=issue date|order=descending}} |{{#invoke:Navbox|navbox}} }}

{{#arraymap:{{#ask:document::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation[[Project::+]][[issue date::<{{#time:m-d-Y|06/13/2023 + 9 months}}]]|mainlabel=-|?Project=|link=none|limit=1|searchlabel=|sort=issue date|order=descending}}|,|xx|[[Project::xx| ]]| }}{{#if:| | }} }} }} }}{{#if:| }}{{#ifeq:|yes||

{{#if:{{#if:|document id::}} {{#if:|
name::|{{#if:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|{{#Wiki_filter:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}[[title::{{#Regex_clear:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}| ]]}}}}|}}{{#if:|{{#if:{{{above}}} |
|{{#if:
|{{#if: | }} }} }} }}{{#ifeq:|yes|{{#if:{{#if:|document id::}} {{#if:|
name::|{{#if:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|{{#Wiki_filter:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}[[title::{{#Regex_clear:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}| ]]}}}}|{{#if:|document id::}} {{#if:|
name::|{{#if:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|{{#Wiki_filter:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}[[title::{{#Regex_clear:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}| ]]}}}}
}}}}{{#if:|{{#if: |
|{{#if:{{{subheader}}}
|{{#if: | }} }} }}{{#if:|{{#if: |
|{{#if:{{{subheader2}}}
|{{#if: | }} }} }}{{#if:|{{#if: |
|{{#if:{{{image1}}} {{#if:|
{{{caption1}}}}}
|{{#if: | }} }} }}{{#if:|{{#if: |
|{{#if:{{{image2}}}{{#if:|
{{{caption2}}}}}
|{{#if: | }} }} }}{{#if: |
|{{#if:[[Accession number::{{#if:ML23164A230|ML23164A230|{{#if:|}}}}]]
|{{#if: | }} }}{{#if:Person / Time |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:{{#show:05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|?site}}{{#arraymap:05000333|,|x| || }}{{#if:05000333|{{#if:{{#show:{{#explode:05000333|,|0}}|?company|link=none}}|{{#if:{{#show:{{#show:{{#explode:05000333|,|0}}|?company|link=none}}|?icon|link=none}}| [[{{#show:{{#show:{{#explode:05000333|,|0}}|?company|link=none}}|?icon|link=none}}|link={{#show:{{#explode:05000333|,|0}}|?company|link=none}}]]}}}}}}
|{{#if:Site: | }} }}{{#if: |
|{{#if:[[Start date::Issue date::{{#if:06/13/2023|06/13/2023}}]]
|{{#if:Issue date: | }} }}{{#if: |
|{{#if:{{#if:|Revision::}}
|{{#if:{{#if:|Revision:}} | }} }}{{#if: |
|{{#if:{{#arraymap:Peter T|,|x|[[from::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]]}}{{#if:|{{#if:{{#show:|?name|link=none}}|{{#show:|?name|link=none}}|}}}}{{#if:Constellation Energy Generation, LLC|
{{#arraymap:{{#replace:{{#replace:Constellation Energy Generation, LLC|, LLC| }}|, Inc| }}|,|x|[[from::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]] }} }}
|{{#if:From: | }} }}{{#if: |
|{{#if:{{#arraymap:|,|x|[[to::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]]}}{{#if:|{{#arraymap:|,|x|to::x}}}}
{{#arraymap:{{#replace:{{#replace:NRC/NRR, NRC/Document Control Desk|, LLC| }}|, Inc| }}|,|x|[[to::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]]}}
|{{#if:To: | }} }}{{#if: |
|{{#if:
|{{#if:Contacts: | }} }}{{#if: |
|{{#if:{{#if:|contact::}}
|{{#if: | }} }}{{#if: |
|{{#if:{{#if:|Category:Press Release      }}
|{{#if: | }} }}{{#if:{{#if:|Shared Package}} |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:{{#if:|List: {{#ask:in package::|format=ul}} }}
|{{#if:{{#if:|{{#arraymap:|;|xx|in package::xx}} }} | }} }}{{#if:References |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:{{#arraymap:JAFP-23-0031|,|x|{{#Wiki_filter:x}}}} {{#arraymap:LER 2023-002-00|,|x|{{#Wiki_filter:x}}}}
|{{#if: | }} }}{{#if: |
|{{#if:{{#if:{{#ask:Followed by::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|link=none}}|{{#ask:Followed by::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|?Issue date=|format=ul|sort=Issue date|order=descending}} }}
|{{#if:{{#if:{{#ask:Followed by::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|link=none}}|Preceding documents:}} | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if:{{#if:ML23164A230|Download: [[URL::http://pbadupws.nrc.gov/docs/{{#sub:ML23164A230%7C0%7C6}}/ML23164A230.pdf%7CML23164A230]]|[[URL::http://pbadupws.nrc.gov/docs/{{#sub:%7C0%7C6}}/.pdf%7C]]}} {{#if:1|(page count::1)}}|}}{{#if:Adams|}} {{#ifeq:|yes||
{{#if:|document id::}} {{#if:|
name::|{{#if:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|{{#Wiki_filter:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}[[title::{{#Regex_clear:Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation }}| ]]}}}}
{{{above}}}
{{{label}}} | }}{{{data}}}
{{{header}}}
{{{label}}} | }}{{{subheader}}}
{{{header}}}
{{{label}}} | }}{{{subheader2}}}
{{{header}}}
{{{label}}} | }}{{{image1}}} {{#if:|
{{{caption1}}}}}
{{{header}}}
{{{label}}} | }}{{{image2}}}{{#if:|
{{{caption2}}}}}
| }}[[Accession number::{{#if:ML23164A230|ML23164A230|{{#if:|}}}}]]
Person / Time
| }}
Site: | }}{{#show:05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|?site}}{{#arraymap:05000333|,|x| || }}{{#if:05000333|{{#if:{{#show:{{#explode:05000333|,|0}}|?company|link=none}}|{{#if:{{#show:{{#show:{{#explode:05000333|,|0}}|?company|link=none}}|?icon|link=none}}| [[{{#show:{{#show:{{#explode:05000333|,|0}}|?company|link=none}}|?icon|link=none}}|link={{#show:{{#explode:05000333|,|0}}|?company|link=none}}]]}}}}}}
Issue date: | }}[[Start date::Issue date::{{#if:06/13/2023|06/13/2023}}]]
{{#if:|Revision:}} | }}{{#if:|Revision::}}
From: | }}{{#arraymap:Peter T|,|x|[[from::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]]}}{{#if:|{{#if:{{#show:|?name|link=none}}|{{#show:|?name|link=none}}|}}}}{{#if:Constellation Energy Generation, LLC|
{{#arraymap:{{#replace:{{#replace:Constellation Energy Generation, LLC|, LLC| }}|, Inc| }}|,|x|[[from::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]] }} }}
To: | }}{{#arraymap:|,|x|[[to::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]]}}{{#if:|{{#arraymap:|,|x|to::x}}}}
{{#arraymap:{{#replace:{{#replace:NRC/NRR, NRC/Document Control Desk|, LLC| }}|, Inc| }}|,|x|[[to::{{#if:{{#show:x|?name|link=none}}|{{#show:x|?name|link=none}}|x}}]]}}
Contacts: | }}
| }}{{#if:|contact::}}
| }}{{#if:|Category:Press Release }}
{{#if:|Shared Package}}
| }}
{{#if:|{{#arraymap:|;|xx|in package::xx}} }} | }}{{#if:|List: {{#ask:in package::|format=ul}} }}
References
| }}
| }}{{#arraymap:JAFP-23-0031|,|x|{{#Wiki_filter:x}}}} {{#arraymap:LER 2023-002-00|,|x|{{#Wiki_filter:x}}}}
{{#if:{{#ask:Followed by::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|link=none}}|Preceding documents:}} | }}{{#if:{{#ask:Followed by::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|link=none}}|{{#ask:Followed by::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|?Issue date=|format=ul|sort=Issue date|order=descending}} }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
{{#if:ML23164A230|Download: [[URL::http://pbadupws.nrc.gov/docs/{{#sub:ML23164A230%7C0%7C6}}/ML23164A230.pdf%7CML23164A230]]|[[URL::http://pbadupws.nrc.gov/docs/{{#sub:%7C0%7C6}}/.pdf%7C]]}} {{#if:1|(page count::1)}}
{{#if:| <span|<div}} class="noprint plainlinksneverexpand navbar" style="background:none; padding:0; font-weight:normal;; font-size:xx-small; ">{{#if:1||This box: }}{{#if:|[}}[[{{#switch:
|#default = Adams 
| = 
   {{#ifeq:  | 
     | Template:Adams            
     | Adams      
   }}

}}|{{#if:1|v|view}}]]  [[|{{#if:1|d|talk}}]]{{#if:||  [{{fullurl:{{#switch:

|#default = Adams 
| = 
   {{#ifeq:  | 
     | Template:Adams            
     | Adams      
   }}
}}|action=edit}}{{#if:1|e|edit}}]}}{{#if:|]}}{{#if:| |}}

}}{{#if:Letter, Licensee Event Report (LER)|{{#arraymap:Letter, Licensee Event Report (LER)|,|x|| }}{{#if:{{#show:05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|?site}}|{{#invoke:Navbox|navbox}}

|{{#invoke:Navbox|navbox}} }} }}
|{{#if:ML23164A230|Download: [[URL::http://pbadupws.nrc.gov/docs/{{#sub:ML23164A230%7C0%7C6}}/ML23164A230.pdf%7CML23164A230]]|[[URL::http://pbadupws.nrc.gov/docs/{{#sub:%7C0%7C6}}/.pdf%7C]]}} }} {{#if:|{{#invoke:Navbox|navbox}} }}

{{#ifeq:|yes||

{{#if:LER-LER year::2023-002 , title::Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|}}{{#if:|{{#if:{{{above}}} |
|{{#if:
|{{#if: | }} }} }} }}{{#ifeq:|yes|{{#if:LER-LER year::2023-002 , title::Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|LER-LER year::2023-002 , title::Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation}}}}{{#if:|{{#if: |
|{{#if:{{{subheader}}}
|{{#if: | }} }} }}{{#if:|{{#if: |
|{{#if:{{{subheader2}}}
|{{#if: | }} }} }}{{#if:|{{#if: |
|{{#if:{{{image1}}} {{#if:|
{{{caption1}}}}}
|{{#if: | }} }} }}{{#if:|{{#if: |
|{{#if:{{{image2}}}{{#if:|
{{{caption2}}}}}
|{{#if: | }} }} }}{{#if: |
|{{#if:site::
|{{#if: | }} }}{{#if: |
|{{#if:Event date::start date::
|{{#if:Event date: | }} }}{{#if: |
|{{#if:Report date::end date::
|{{#if:Report date: | }} }}{{#if: | |{{#if:{{#arraymap:10 CFR 50.73(a)(2)(iv)(A)|,|x|Reporting criterion::x{{#if:{{#show:x|?name|link=none}}|, {{#show:x|?name|link=none}}}}|

}} |{{#if:Reporting criterion: |
}}

}}{{#if:{{#if:|Initial Reporting}}

|
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:{{#if:|{{#show:|?Reporting criterion}}}}
|{{#if:{{#if:|ENS::}} | }} }}{{#if:{{#if:{{#ask:Closes LER::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation}}|LER closed by}} |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:{{#if:{{#ask:Closes LER::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation}}

|{{#arraymap:{{#ask:Closes LER::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|link=none}}|,|x|Closed by::x ([[Closed by date::{{#show:x|?issue date=|link=none}}]])|
}} }}

|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if: |
|{{#if:
|{{#if: | }} }}{{#if:{{#set:URL=https://lersearch.inl.gov/Index.aspx?Page=PDFView?Doc::{{#sub:05000333%7C-3}}2023002R00.pdf}}{{#sub:05000333|-3}}2023002R00 - NRC Website|}}{{#if:LER|}} {{#ifeq:|yes||
LER-LER year::2023-002 , title::Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation
{{{above}}}
{{{label}}} | }}{{{data}}}
{{{header}}}
{{{label}}} | }}{{{subheader}}}
{{{header}}}
{{{label}}} | }}{{{subheader2}}}
{{{header}}}
{{{label}}} | }}{{{image1}}} {{#if:|
{{{caption1}}}}}
{{{header}}}
{{{label}}} | }}{{{image2}}}{{#if:|
{{{caption2}}}}}
| }}site::
Event date: | }}Event date::start date::
Report date: | }}Report date::end date::
Reporting criterion: | }}{{#arraymap:10 CFR 50.73(a)(2)(iv)(A)|,|x|Reporting criterion::x{{#if:{{#show:x|?name|link=none}}|, {{#show:x|?name|link=none}}}}|

}}
{{#if:|Initial Reporting}}
| }}
{{#if:|ENS::}} | }}{{#if:|{{#show:|?Reporting criterion}}}}
{{#if:{{#ask:Closes LER::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation}}|LER closed by}}
| }}
|
 }}{{#if:{{#ask:Closes LER::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation}}
|{{#arraymap:{{#ask:Closes LER::05000333/LER-2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation|link=none}}|,|x|Closed by::x ([[Closed by date::{{#show:x|?issue date=|link=none}}]])|
}} }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
| }}
{{#set:URL=https://lersearch.inl.gov/Index.aspx?Page=PDFView?Doc::{{#sub:05000333%7C-3}}2023002R00.pdf}}{{#sub:05000333|-3}}2023002R00 - NRC Website
{{#if:| <span|<div}} class="noprint plainlinksneverexpand navbar" style="background:none; padding:0; font-weight:normal;; font-size:xx-small; ">{{#if:1||This box: }}{{#if:|[}}[[{{#switch:
|#default = LER 
| = 
   {{#ifeq:  | 
     | Template:LER            
     | LER      
   }}

}}|{{#if:1|v|view}}]]  [[|{{#if:1|d|talk}}]]{{#if:||  [{{fullurl:{{#switch:

|#default = LER 
| = 
   {{#ifeq:  | 
     | Template:LER            
     | LER      
   }}
}}|action=edit}}{{#if:1|e|edit}}]}}{{#if:|]}}{{#if:| |}}

}}

text

{{#Wiki_filter:Constellation JAFP-23-0031 June 13, 2023 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Timothy C. Peter Site Vice President-JAF James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-059 NRC Docket No. 50-333

Subject:

Dear Sir or Madam: LEA: 2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation This report is being submitted pursuant to 1 O CFR 50.73(a)(2)(iv)(A). There are no new regulatory commitments contained in this report. Questions concerning this report may be addressed to Mr. Mark Hawes, Regulatory Assurance, at (315) 349-6659. Sincerely TCP/MH

Enclosure:

LEA: 2023-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation cc: USNRC, Region I Administrator USNRC, Project Manager USNRC, Resident Inspector INPO Records Center (IRIS)

NRC FORM 366 (08-2020) NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (03-14-2023) APPROVED BY OMB: NO. 3150-0104 EXPIRES: 08/31/2023

1. Facility Name James A. FitzPatrick Nuclear Power Plant 050
2. Docket Number 05000333
3. Page 1 OF 3 052
4. Title Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation
5. Event Date
6. LER Number
7. Report Date
8. Other Facilities Involved

Month

Day

Year

Year Sequential Number Revision No.

Month Day Year Facility Name N/A 050 Docket Number N/A 04 14 2023 2023 - 002 - 00 06 13 2023 Facility Name N/A 052 Docket Number N/A

9. Operating Mode 1
10. Power Level 100 Month Day Year No Yes (If yes, complete 15. Expected Submission date) 08 14 2023 Abstract (Limit to 1560 spaces, i.e., approximately 15 single-spaced typewritten lines)

On April 14, 2023, at 05:11, James A. FitzPatrick Nuclear Power Plant (JAF) received annunciators and indication of a half-scram on the B side Reactor Protection System (RPS). The cause was determined to be an overvoltage condition that tripped the Electrical Protection Assembly (EPA) for the B RPS Motor Generator (MG) Set. The same condition occurred on May 26, 2023. These events caused invalid primary containment isolation signals in multiple systems, reportable in accordance with 10 CFR 50.73(a)(2)(iv)(A). The investigation into the cause of the events is ongoing. A supplement to this report will be submitted when the cause is finalized. (See NUREG-1022, R.3 for instruction and guidance for completing this form http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/) (See Page 3 for required number of digits/characters for each block) LICENSEE EVENT REPORT (LER)

=

Background=== Reactor Protection System (RPS) [EIIS: JE] Electric Power Monitoring System is provided to isolate the RPS bus from the motor generator (MG) set or an alternate power supply in the event of overvoltage, undervoltage, or underfrequency. This system protects the loads connected to the RPS bus against unacceptable voltage and frequency conditions and forms an important part of the primary success path of the essential safety circuits. Some of the essential equipment powered from the RPS buses includes the RPS logic, scram pilot valve solenoids, and various valve isolation logic. RPS electric power monitoring assembly will detect any abnormal high or low voltage or low frequency condition in the outputs of the two MG sets or the alternate power supply and will de-energize its respective RPS bus, thereby causing all safety functions normally powered by this bus to de-energize. (Safety functions powered by the RPS buses deenergize to actuate.) Two redundant Class IE circuit breakers are connected in series between each RPS bus and its MG set, and between each RPS bus and its alternate power supply. Each of these circuit breakers has an associated independent set of Class IE overvoltage, undervoltage, and under frequency sensing logic. Together, a circuit breaker and its sensing logic constitute an electric power monitoring assembly. If the output of the inservice MG set or alternate power supply exceeds predetermined limits of overvoltage, undervoltage, or underfrequency, a trip coil driven by this logic circuitry opens the circuit breaker, which removes the associated power supply from service.

Event Description

On April 14, 2023, at 05:11 when James A. FitzPatrick Nuclear Power Plant (JAF) at 100% power, received annunciators and indication of a half-scram on B side RPS. AOP-60, Loss of RPS Bus B Power, was entered and the cause was determined to be a trip of the B RPS MG set due to an overvoltage condition. The direct cause of the output breaker tripping was due to an Electric Power Monitoring System overvoltage trip on 71EPA-RPS1B1G, Electrical Protection Assembly (EPA). On May 26, 2023, entry into AOP-60 caused by B side half scram. Also due to a trip of B RPS MG Set EPA caused by an overvoltage condition. In both events, the condition was corrected when the RPS Bus was placed on the alternate power supply. Both events resulted in invalid system actuations of "B" side half scram and Primary Containment Isolation System (PCIS) [JM] isolations. The following systems isolated as a result of the loss of B RPS bus: Reactor Water Cleanup [CE], Reactor Building ventilation [NG], B Containment Atmosphere Dilution [BB], Torus Vent and Purge, Drywell Equipment and Floor Drain Sumps [WK], B Drywell Containment Atmospheric Monitors [IP], Recirculation System Sample Line, and Main Steam Line Drains [SB]. B Standby Gas Treatment System [BH] started as designed. These system actuations were not initiated by signals in response to actual plant conditions or parameters satisfying the requirements for initiation of the system. This event is reportable in accordance with 10 CFR 50.73(a)(2)(iv)(A). U.S. NUCLEAR REGULATORY COMMISSION (03-14-2023) LICENSEE EVENT REPORT (LER) CONTINUATION SHEET APPROVED BY OMB: NO. 3150-0104 EXPIRES: 08/31/2023

1. FACILITY NAME 050
2. DOCKET NUMBER
3. LER NUMBER James A. FitzPatrick Nuclear Power Plant 05000333 YEAR SEQUENTIAL NUMBER REV NO.

052 2023

- 002
- 00 Page 3 of 3 (See NUREG-1022, R.3 for instruction and guidance for completing this form http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/)

Event Analysis

At the time of this report, the investigation into the cause of the event in April 14, 2023, and May 26, 2023 is ongoing. A supplement to this report will be submitted by August 14, 2023.

Similar Events

ENS 42967, Half Scram Signal Due to Equipment Failure, event dated September 8, 2006 (CR-JAF-2006-03286) ENS 43332, Primary Containment Isolation Due to Loss of RPS Power Supply, event dated April 12, 2007 (CR-JAF-2007-01422) ENS 51480, Invalid Primary Containment Isolation Signal, event dated August 23, 2015 (CR-JAF-2015-03758)

Corrective Actions

Completed Actions RPS Bus was placed on the alternate power supply after each event.

Safety Significance

There were no actual nuclear consequences. RPS Electric Power Monitoring System responded as designed to an overvoltage condition to protect the electrical power systems. Then system actuations responded to the loss of power condition as expected without any issue. There was no loss of any safety functions during this event. References Issue Report - IR 04670001, AOP-60 entry due to B side half scram, dated April 14, 2023 Issue Report - IR 04680732, Entry into AOP-60, dated May 26, 2023 }}