=2: Dominion ii' Energy 2020 Annual Radiological EnvironIDental Operating Report Kewaunee Power Station Part III, Corrective*
Actions written during reporting period Dominion Energy Kewaunee, Inco
Print CR_ID Short description Site Discovery Date/Time Submitter Submitters Dept Supervisor Unit 1 Mode Unit ISFSI?
Revision#
Long Description Initial Actions Recom Actions:
additional Contacts Tag#:
Equipment Location Equipment Description 2016 K-1f environmental air sample pump found in degraded condition Kewaunee 2/18/2020 7:20 AM Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection 0 Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
No At approximately 0720 on 2/18/2020 the K-1f environmental air sample pump was found in a degraded condition during the weekly filter change out.
The pump sounded as if it was failing and the flow indicator was not indicating any flow.
Turned pump off. Restarted the pump and did not see any improvement. Turned pump off again.
Changed out filter.
Contacted system expert and informed of issue.
Noted issue on sample collection data sheet.
Repair or replace pump. This is currently in progress.
Create a CA to include this CR in the 2020 Annual Environmental Report.
Plant System OP-AA-102 Review Reqd?
Operability Assesment Operability Comments Functionality Assessment Reportable Condition Reportability Comments No N/A N/A No Is Equipment Important to Emergency Response WM-KW-100 values No O/R Comments Significance (screening)
Potential Repeat (screening)
Previous Issue CRT Comments Work Order#
Comments Status 3
Yes CR1696 LOSS OF POWER TO ENVIRONMENTAL AIR SAMPLER K-1 F AND STATE AIR SAMPLER.
CR1768 ENVIRONMENTAL AIR SAMPLER FOUND OFF CR1880 Environmental Air Sampler K-1f found off due to blown fuse.
CR1884 K-1f Environmental air sampler found off due to blown fuse CR1914 Environmental Air Sampler K-1f found with reduced sample run time Pump was replaced 2/1/19 I
CA753 (Steckler/Shannon) to include this event in the 2020 Annual Environmental Report Pending
- * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
- I. * * * * * * * * * *
- Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site K-1f environmental air sample pump found in degraded condition 753 2016 D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Per Schedule 5/27/2021 D Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection D Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
Include this event in the 2020 Annual Environmental Operating Report Kewaunee is this CA Req'd to resore full qualification or functionality No Is this an a(1) corrective action?
Review comments Comments Email Notification 1 Email Notification 2 No
Due date -6 Status 5/21/2021 Perform Action CR Short.description K-1f environmental air sample pump found in degraded Location CR#:Description (location)
Content Type: Item Version: 6.0 condition Created at 2/19/2020 7:46 AM by D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
Last modified at 1/5/2021 12:01 PM by D Amy Garvey (Services - 6)
Close
Print CR_ID Short description Site Discovery Date/Time Submitter Submitters Dept Supervisor Unit 1 Mode Unit ISFSI?
Revision#
Long Description Initial Actions Recom Actions:
additional Contacts Tag#:
Equipment Location Equipment Description Plant System
. OP-AA-102 Review Reqd?
Operability Assesment Operability Comments Fur,ctionality Assessment 2025 K-8 Environmental air sampler found off with blown fuse Kewaunee 3/10/2020 8:30 AM
[J Mark A Peroutka (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection CJ Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
N/A No Environmental air sampler (#6737) at location K-8 was found off with blown fuse. After the fuse was replaced, the pump was turned on and the motor would start but was seized up. The pump was immediately turned off prior to blowing a second fuse. The air sampler had operated for 44.34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> prior to the fuse blowing. The air sample filter was changed out and will be sent to the vendor for analysis with a reduced sample volume.
Removed K-8 environmental air sampler from service and replaced it with a calibrated air sampler.
Create a CA to include this CR in the 2020 Annual Environmental Report.
No N/A NA N/A
KeportaoIe Lonamon Reportability Comments NO NA Is Equipment Important to Emergency Response WM-KW-100 values No O/R Comments Significance (screening)
Potential Repeat (screening)
Previous Issue CRT Comments Work Order#
Comments Status Content Type: Item Version: 11.0 Agree with recomendations 3
Yes CR784 K-8 REMP Environmental Air Samplers Found Not Running 9/20/16 CR1285 K-8 Environmental Air Sampler found not running 6/26/17 CR1741 Environmental Air sampler found off 7 /24/18 CR1749 Environmental Air sampler found off 7/31/18 CR1904 K-8 environmental air sample pump found in degraded condition 7 /9/19 CR1927 K-8 location environmental air sample pump found not running due to blown fuse 8/13/19 CR1940 Environmental air sample pump found off at location K-8 CR1974 K-8 Location environmental air sample pump found not running due to breaker being open CA758 (Steckler/Shannon) to include CR2025 in 2020 annual Environmental Report Pending Created at 3/10/2020 2:22 PM by O Mark A Peroutka (Dom Energy Kewaunee, Inc - 4)
Last modified at 3/11/2020 8:23 AM by System Account Close
Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site K-8 Environmental air sampler found off with blown fuse 758 2025 Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Per Schedule 5/27/2021 Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection D Dan JShannon (Dom Energy Kewaunee, Inc - 4)
Include CR2025 in 2020 annual Environmental Report Kewaunee is this CA Req'd to resore full qualification or functionality No Is this an a(1) corrective action?
Review comments Comments
.Email Notification 1 Email Notification 2 Due date -6 No 5/21/2021 Pi:>rfnrm Artinn
CR Short description Location K-8 Environmental air sampler found off with blown fuse CR#:Description (location)
Content Type: Item Version: 8.0 Created at 3/11/2020 8:12 AM by D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
Last modified at 1/5/2021 12:01 PM by D Amy Garvey (Services - 6)
Close
- CR_ID Short description Site Discovery Date/Time Submitter
- Submitters Dept Supervisor Unit 1 Mode Unit ISFSI?
Revision#
Long Description Initial Actions 2034 Environmental Air Particulate Sample at K-2 Not Collected Kewaunee 4/28/2020 9:30 AM D Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection 0 Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
N/A No While performing the weekly Environmental Air Sampler particulate filter change on 4/28/20, the air sampler head at location K-2 was found on the ground in front of the environmental air sampler. The air particulate filter was not discolored, indicating that the sampler head most likely fell off shortly after being changed on 4/21/20, and an environmental air particulate sample was not collected at location K-2 (control) for the week ending 4/28/20.
The most likely cause of the air sample head falling off the air sampler was due to the air sample head not being firmly latched in place after being exchanged on 4/21/20.
Installed an air sample head with a new particulate filter on the environmental air sampler at location K-2 in accordance with RP-KW-HSP-HPE-1164, Environmental Sample Collection. Verified that the air sampler head was latched in place.
Discussed event with RP personnel and reinforced the expectation to verify that the environmental air sampler head is latched firmly in place after being exchanged, as part of the post-filter change operational check required by RP-KW-HSP-HPE-164, Environmental Sample Collection.
Initiated CR to document the event.
Recom Actions:
additional Contacts Tag#:
Equipment Location Equipment Description Plant System OP-AA-102 Review Reqd?
Operability Assesment Operability Comments Functionality Assessment Reportable Condition Reportability Comments CA to RP to include this CR in the 2020 Annual Radiological Environmental Operating Report No N/A N/A No Is Equipment Important to Emergency Response WM-KW-100 values No O/R Comments Significance (screening)
Potential Repeat (screening)
Previous Issue CRT Comments Work Order#
Comments Status Content Type: Item Version: 15.0 3
Yes CR88 K-2 ENVIROMENTAL AIR SAMPLER FOUND NOT WORKING CR689 POWER FOUND OFF AT K-2 ENVIRONMENTAL AIR SAMPLER CR1898 Environmental air sampler K-2 (WPS building) found off due to blown fuse CA763 (Steckler/Shannon) to include CR2034 in the 2020 Annual Radiological Environmental Operating Report No additional comments Pending Created at 4/28/2020 12:47 PM by D Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
Close
Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site Environmental Air Particulate Sample at K-2 Not Collected 763 2034 D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Per Schedule 5/27/2021 D Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection D Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
Include CR2034 in the 2020 Annual Radiological Environmental Operating Report Kewaunee is-this CA-Req'd to resore full qualification or functionality No Is this an a(1) corrective action ?
Review comments Comments Email Notification 1 Email Notification 2 Due date -6 No 5/21/2021
Status Perform Action CR Short description Location Environmental Air Particulate Sample at K-2 Not Collected CR#:Description (location)
Content Type: Item Version: 6.0 Created at 5/6/2020 7:48 AM by D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
Last modified at 1/5/202112:01 PM by Amy Garvey (Services - 6)
Close
Print CR_ID Short description Site Discovery Date/Time Submitter Submitters Dept Supervisor Unit 1 Mode Unit ISFSI?
Revision#
Long Description Initial Actions Recom Actions:
additional Contacts Tag#:
Equipment Location r-- ___
- _____.a. '"'----*-.1.* __
2063 Power lost to environmental air sampler K-1f.
Kewaunee 7/14/2020 7:45 AM D Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection C1 Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
No On July 14th at 0745 the K-1f environmental air sampler was found off. Upon investigation of the issue the power to the Maintenance Material Storage Building was found off, which supplies power to the air sampler. The approximate time of this happening based on the reading from the Run Time Indicator was 0000 Monday.
Informed the ISFSI Shift Supervisor (ISS).
Changed out the sample filter.
Noted the problem on the Environmental Sample Collection Data Sheet.
Create corrective action to include this CR in the 2020 Annual Environmental Report.
tquIpmem: uescnpuon Plant System OP-AA-102 Review Reqd?
Operability Assesment Operability Comments Functionality Assessment Reportable Condition Reportability Comments No N/A N/A No Is Equipment Important to Emergency Response WM-KW-100 values No O/R Comments Significance (screening)
Potential Repeat (screening)
Previous Issue CRT Comments Work Order#
Comments Status Content Type: Item Version: 12.0 3
Yes CR1696 LOSS OF POWER TO ENVIRONMENTAL AIR SAMPLER K-1 F AND STATE AIR SAMPLER.
CR1768 ENVIRONMENTAL AIR SAMPLER FOUND OFF CR 1880 Environmental Air Sampler K-1 f found off due to blown fuse.
CR1884 K-1f Environmental air sampler found off due to blown fuse CR1914 Environmental Air Sampler K-1f found with reduced sample run time CR2016 K-1f environmental air sample pump found in degraded condition CA771 (Steckler/Shannon) to include this event in the 2020 Annual Environmental Report Pending r......,..,1,,..,J,..,1.7/1A/'ln~n11°C1 A~JI L-..url D.-..-f.DC'+........ l,l,...,./n,......,,,c...,,........,.v.-...........,,..,.. 1...,,.
A\\
Close
- e Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site Power lost to environmental air sampler K-1f.
771 2063 Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Per Schedule 5/27/2021 0 Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
Include this event in the 2020 Annual Environmental Operating Report Kewaunee is this CA Req'd to resore full qualification or functionality No Is this an a(1) corrective action ?
Review comments Comments Email Notification 1 Email Notification 2 Due date -6 No 5/21/2021
Status CR Short description Location CR#:Description (location)
Content Type: Item Version: 6.0 Perform Action Power lost to environmental air sampler K-1 f.
Created at 7/15/2020 8:27 AM by D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
Last modified at 1/5/2021 12:01 PM by D Amy Garvey (Services - 6)
Close e: *
- * * * * * * * * * * * * * * * * * * * * *
- I.
- e * * * * * * * * * * * * * * * * * *
- Print CR_ID Short description Site Discovery Date/Time Submitter Submitters Dept Supervisor Unit 1 Mode Unit ISFSI?
Revision#
Long Description Initial Actions Recom Actions:
additional Contacts Tag#:
Equipment Location Equipment Description Plant System OP-AA-102 Review Reqd?
Operability Assesment Operability Comments 2076 Air Sampler near woodshed not working Kewaunee 7/26/2020 7:00 AM D Jesse C Arcand (Dom Energy Kewaunee, Inc - 4)
- 1. Operations Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
N/A No Found the K-1 air sampler near the woodshed was not working. The building has power and no breakers are tripped to the receptacles. There was also power verified in the pump housing with the installed light. Time of failure was not determined.
Notified RPM via text.
Repair the air sampler pump.
Determine the out of service time and include in annual report.
No N/A N/A 1\\1 /A
ru111wuu11a111.y tt::.::.c::.::u11c111.
Reportable Condition Reportability Comments No N/A Is Equipment Important to Emergency Response WM-KW-100 values No O/R Comments Significance (screening)
Potential Repeat (screening)
Previous Issue CRT Comments Work Order#
Comments Status Content Type: Item Version: 8.0 N/A 3
Yes CR1696 LOSS OF POWER TO ENVIRONMENTAL AIR SAMPLER K-lF AND STATE AIR SAMPLER.
CR1768 ENVIRONMENTAL AIR SAMPLER FOUND OFF CR1880 Environmental Air Sampler K-lf found off due to blown fuse.
CR1884 K-lf Environmental air sampler found off due to blown fuse CR1914 Environmental Air Sampler K-lf found with reduced sample run time CR2016 K-lf environmental air sample pump found in degraded condition CR2063 Power lost to environmental air sampler K-1 f.
Air sampler not working as a result of a blown fuse. Fuse was replaced on 7 /26/20 and the air sampler was returned to service. CA775 (Steckler/Shannon) to include this event in the 2020 Annual Radiological Effluent Release Report Pending Created at 7/26/2020 8:45 AM by D Jesse C Arcand (Dom Energy Kewaunee, Inc - 4)
Last modified at 7/27/2020 10:01 AM by D System Account Close
- * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *,. i. * *
- Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site Air Sampler near woodshed not working 775 2076 0 Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Per Schedule 5/27/2021 0 Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection 0 Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
Include this event in the 2020 Annual Radiological Effluent Release Report Kewaunee is this CA Req'd to resore full qualification or functionality No Is this an a(1) corrective action ?
Review comments Comments Email Notification 1 Email Notification 2 Due date -6 No 5/21/2021
Status CR Short description Location CR#:Description (location)
Content Type: Item Version: 6.0 Perform Action Air Sampler near woodshed not working Created at 7/27/2020 9:56 AM by D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
Last modified at 1/5/2021 12:01 PM by Amy Garvey (Services - 6)
Close
- CR_ID Short description Site Discovery Date/Time Submitter Submitters Dept
- Supervisor Unit 1 Mode Unit ISFSI?
Revision#
- Long Description Initial Actions
- * * * * * *
- Recom Actions:
2081 Environmental. Air Sampler Totalizer Indication Blank at K-43 and K-8 Kewaunee 8/4/2020 10:00 AM 0 Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection
[J Darrell L Basken (Dom Energy Kewaunee, Inc - 4)
N/A No During the collection of the weekly environmental air samples, the run time totalizer indications at locations K-43 and K-8 were blank (no indication of run time displayed). The air sampler flow rate indication was satisfactory (30 LPM) and the sample filter loading was normal at K-43 and K-8 (i.e., filter discoloration was similar to the sample filters collected at location K-1 f and K-2). Pre and post filter change out operational checks were satisfactory.
Calculated total run time for the weekly air samples at K-43 and K-8 using filter service (change) dates/times and documented the results on RP-KW-HSP-HPE-164, Attachment B, Environmental Sample Collection Data Sheet.
Initiated CR to document event.
Notified RP personnel responsible for instrument calibration and maintenance.
Replace the environmental air sampler run time totalizers at locations K-43 and K-8 following weekly collection/change out of the air sample filter during the week of August 10, 2020, and calculate the total run time for those weekly air samples using the filter service (change) dates/times.
CA to RP to include this CR in the 2020 Annual Radioloqical Environmental Operation Report.
additional Contacts Tag#:
Equipment Location Equipment Description Plant System OP-AA-102 Review Reqd?
No Operability Assesment N/A Operability Comments NA Functionality Assessment N/A Reportable Condition None Reportability Comments NA Is Equipment Important to Emergency Response WM-KW-100 values No O/R Comments Significance (screening)
Potential Repeat (screening)
Previous Issue CRT Comments Work Order#
Comments Status Content Type: Item Replace runtime meters, and determine if remaining samplers in the field should have the runtime meters replaced prior to failure.
3 No No previous history CA780 (Basken/Shannon) to replace the environmental air sampler run time totalizers at locations K-43 and K-8 following weekly collection/change out of the air sample filter during the week of August 10, 2020, and calculate the total run time for those weekly air samples using the filter service (change) dates/times.
CA781 (Steckler/Shannon) to include this CR in the 2020 Annual Radiological Environmental Operation Report.
Pending
- e,.
- *
- i. :* * *
- I.
1 Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site Environmental Air Sampler Totalizer Indication Blank at K-43 and K-8 780 2081 0 Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Low 8/27/2020 0 Darrell L Basken (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection 0 Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
. Replace the environmental air sampler run time totalizers at locations K-43 and K-8 following weekly collection/change out of the air sample filter during the week of August 10, 2020, and calculate the total run time for those weekly air samples using the filter service (change) dates/times.
Replaced environmental air samplers K-43 and K-8 with new run time totalizers on 8-11-2020 and verified operation 8-18.:.2020. Run time for the weekly air samples for collected on 8-11-20 at these locations was calculated using the filter service (change) dates/times and documented on RP-KW-HSP-HPE-164, Attachment B, Environmental Sample Collection Data Sheet.
Kewaunee is this CA Req'd to resore f!-111 qualification or functionality No
Is this an a(1) corrective action ?
Review comments Comments Email Notification 1 Email Notification 2 Due date -6 Status CR Short description Location CR#:Description (location)
Content Type: Item Version: 18.0 No Reviewed activity requested and actions completed -
approved for closure.
DCAC review complete no further actions required. TPO 8/18/20 8/21/2020 Complete Environmental Air Sampler Totalizer Indication Blank at K-43 and K-8 Close Created at 8/5/2020 7:55 AM by O Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
Last moqified at 1/5/2021 12:01 PM by Amy Garvey (Services - 6)
!e Print Title CA_ID CR#
Short Description DCAC Assignment type Priority Due Date Evaluator Assigned Dept Supervisor Manager Review Required?
Manager Additional Reviewer Detailed Assignment
Response
Num Appr Ext Site Environmental Air Sampler Totalizer Indication Blank at K-43 and K-8 781 2081 D Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
CA Per Schedule 5/27/2021 D Bart R Steckler (Dom Energy Kewaunee, Inc - 4)
- 2. Radiation Protection D Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
Include this CR in the 2020 Annual Radiological*
Environmental Operation Report.
Kewaunee is this CA Req'd to resore full qualification or functionality No Is this an a(1) corrective action ?
Review comments Comments
. Email Notification 1 Email Notification 2 No
Due date -6 Status CR Short description Location CR#:Description (location)
Content Type: Item Version: 7.0 5/21/2021 Perform Action Environmental Air Sampler Totalizer Indication Blank at K-43 and K-8 Created at 8/5/2020 7:59 AM by O Timothy P Olson (Dom Energy Kewaunee, Inc - 4)
..___c1_os_e___.l Last modified at 4/21/2021 12:09 PM by D Dan J Shannon (Dom Energy Kewaunee, Inc - 4)
- * * * * * * * * * * * * *-