NRC Liaison Report Risk-Informed Activities Anders Gilbertson Office of Nuclear Regulatory Research Division of Risk Analysis American Society of Mechanical Engineers/American Nuclear Society (ASME/ANS) Joint Committee on Nuclear Risk Management (JCNRM) Meeting February 11, 2021
Overview
- NRC Risk-Informed Activities Update
- ASME/ANS PRA Standards
- Industry Guidance NRC Liaison Report Risk-Informed Activities 2
February 11, 2021
- RG 1.200, Revision 3 Published final in December 2020 (ML20238B871)
New endorsements include:
o NEI 17-07, Revision 2 o Select portions of PWROG-19027-NP, Revision 1 o ASME/ANS RA-S Case 1
- RG 1.200, Revision 4 Currently expected to endorse:
o New edition of the Level 1/LERF PRA standard o Level 2 PRA standard o Appendix to new edition of the Level 1/LERF PRA standard on advanced LWRs for design certification NRC Liaison Report Risk-Informed Activities 3
February 11, 2021
- NRC staff provided comments to NEI on NEI 17-07 in December 2018.
- NEI has piloted peer review of newly developed methods using NEI 17-07 in spring/summer 2019
- NEI 17-07 has been updated based on lessons learned from the pilots and NRC comments (ML19241A615)
- NRC endorsed in RG 1.200, Revision 3 NRC Liaison Report Risk-Informed Activities 4
February 11, 2021
Non-LWR and LWR Activities (1 of 2)
- NRC completed the guidelines for review and endorsement of the ASME/ANS Non-LWR (NLWR) PRA standard (ML19235A285)
- NRC to release a revision to the staffs action plan for endorsement of the NLWR PRA standard (ML20104C132)
- NRC endorsement of the NLWR PRA standard is to be provided in a new trial use regulatory guide (RG) separate from RG 1.200
- Development of staff position on different stages of the design process
- Consideration of LMP
- Consistency with anticipated related staff endorsements of LWR PRA standard requirements yet to be published
- Current schedule for the trial use RG concludes by December 2021
- NEI has developed guidance on NLWR PRA peer review, NEI 20-09, which will be endorsed in the new trial use RG NRC Liaison Report Risk-Informed Activities 5
February 11, 2021
Non-LWR and LWR Activities (2 of 2)
- Continued progress on the Advanced LWR (ALWR) PRA standard is reliant on a stable version of new edition of the Level 1/LERF PRA standard
- NRC will need to consider input from external stakeholders on the priority of having an NRC endorsement NRC Liaison Report Risk-Informed Activities 6
February 11, 2021
New Edition of the ASME/ANS Level 1/LERF LWR PRA Standard
- Following publication of the ANSI standard, NRC staff will start preparing for the review and endorsement
- Staff endorsement will include broad consideration of issues that came up during the consensus process
- Staff endorsement will also consider the relationships between the new edition and the published and endorsed ASME/ANS NLWR PRA standard NRC Liaison Report Risk-Informed Activities 7
February 11, 2021
PRA Acceptability All three elements must work together NRC Liaison Report Risk-Informed Activities 8
February 11, 2021
Acronyms ALWR advanced light-water reactor NDM newly-developed method ANS American Nuclear Society NEI Nuclear Energy Institute ASME American Society of Mechanical NFPA National Fire Protection Association Engineers NOED Notice of Enforcement Discretion CC Capability Category NRC U.S. Nuclear Regulatory Commission CCF common-cause failure NRR Office of Nuclear Reactor Regulation CFR Code of Federal Regulations OpE Operating experience EPRI Electric Power Research Institute PRA probabilistic risk assessment FAQ Frequency Asked Question PWROG Pressurized-Water Reactor Owners Group HRA Human Reliability Analysis RAI Request for additional information JCNRM Joint Committee on Nuclear Risk RES Office of Nuclear Regulatory Research Management RG Regulatory Guide LAR license amendment request RITSTF Risk-Informed TSTF LERF large early release frequency ROP Reactor Oversight Process LPSD low power and shutdown SDP Significance Determination Process LWR light-water reactor TS technical specification MOU memorandum of understanding TSTF Technical Specification Task Force NRC Liaison Report Risk-Informed Activities 9
February 11, 2021