ML20244A039

From kanterella
Jump to navigation Jump to search
COL Docs - Icn 532 Public Call Presentation, 9-3-20 Vogtle Units 3 and 4 Public Meeting
ML20244A039
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/31/2020
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML20244A039 (4)


Text

From:

Schiller, Alina Sent:

Monday, August 31, 2020 7:52 AM To:

Vogtle PEmails

Subject:

ICN 532 public call presentation, 9-3-20 Vogtle Units 3 and 4 public meeting Attachments:

ICN 532 public call presentation.pdf

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

586 Mail Envelope Properties (BLAPR09MB659468EA68BCCA22A75E873C96510)

Subject:

ICN 532 public call presentation, 9-3-20 Vogtle Units 3 and 4 public meeting Sent Date:

8/31/2020 7:52:14 AM Received Date:

8/31/2020 7:52:19 AM From:

Schiller, Alina Created By:

Alina.Schiller@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office:

BLAPR09MB6594.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3

8/31/2020 7:52:19 AM ICN 532 public call presentation.pdf 92374 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

ICN ND-20-0528 Reference Error

  • An incorrect Work Order (WO) number is listed for the WO package that contains the completed test
  • The Site Acceptance Test for the Maintenance Hatch Hoist was satisfactorily completed and demonstrated that the Unit 3 ITAAC 352 Acceptance Criteria were met
  • The WO reference number is needed to obtain the full WO package and completed test from records

Actions Taken / Proposed Actions

  • Actions Taken
  • Condition Report 50060519 was initiated
  • The Completion Package and ITAAC Technical Report were revised
  • Proposed Actions
  • Add a note to ADAMS indicating the incorrect/revised Reference number (WO 1066516 correct vs. 1067487 as submitted incorrect)
  • Similar to action taken for Unit 3 ITAAC 33 (ND-20-0096) for a Reference document error
  • An updated version of the ICN will be submitted to SNC Document Control in the Completion Package