Forwards Insp Rept 50-285/87-16 on 870622-26 & Notice of Violation
ML20237K364
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/14/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20237K366 List:
References
NUDOCS 8708190222
Download: ML20237K364 (2)


See also: IR 05000285/1987016

Text

_

_ _ _ - _ _ _ - _ _ _ _ - _ _ _ _ _

_ _ - _ _ _ _ _ _

_ _ _ _ _ _ _

. _ _ _ _

__

I

,

.

AUG l 41987

,

l

l

i

In Reply Refer To-

I

Docket:

50-285/87-16

i

i

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager-

j

Nuclear Production

1

1623 Harney Street

Omaha, Nebraska

68102

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

the period June 22-26, 1987, of activities authorized by NRC Operating

License DPR-40 for Fort Calhoun Station, and to the discussion of our findings

with you and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included selected portions of the

radiation protection program including:

external occupational exposure control

and personal dosimetry; internal exposure control and assessment; control of

radioactive materials and contamination, surveys, and monitoring; facilities

and equipment; and the licensee's action concerning certain NRC Inspection and

Enforcement Information Notices.

An allegation concerning the whole body

counting program was also reviewed.

Within these areas, the inspection

,

consisted of selective examination of procedures and representative records,

)

interviews with personnel, and observations by the NRC inspector.

The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

'

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:FRPS

C:FR S t

C:RPSB

C: R

B

C:RPB

AC k

E0

REBaer/tw

BMur

LAYand @

Hunter

JEGagli

'o

MEEmerson DAPowere

187f

n 19 187

1iolis7

119

yisi

nisti8,

,in 187

1

yipi s7

i

i

8708190222 B70814

PDR

ADOCK 05000295

)\\

/

G

PDR

_

-

_

1

1

I

Omaha Public Power District

-2-

Should you have any questions concerning this inspection, we will be pleased to

I

discuss them with you.

]

I

i

l

Sincerely,

ORIGINAL SIGNED BYi

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

- i

50-285/87-16

cc w/ enclosures:

W. G. Gates, Manager

]

Fort Calhoun Station

)

P. O. Box 399

)

Fort Calhoun, Nebraska

68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

I

1333 New Hampshire Avenue, NW

)

Washington, D. C.

20036

'

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RPB
  • RRI

R.D. Martin, RA

RPSB

  • Section Chief (RPB/B)
  • MIS System

l

,

l

  • RIV File

DRSP

l

l

  • RSTS Operator
  • RSB
  • Project Inspector, RPB
  • D.- Weiss, RM/ALF

..

l

  • R. Hall
  • T. Bournia, hRR Project Manager

M. Emerson (2)

  • w/766

1

I

-

__

_ O