ML20236L509

From kanterella
Jump to navigation Jump to search
Responds to Violations Noted in Insp Repts 50-245/86-06 & 50-336/86-06 on 860324-27.Corrective Actions:Training Program Developed & Implemented & Radioactive Matls Handling Personnel Will Be Trained by 871231
ML20236L509
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/04/1987
From: Mroczka E, Sears C
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
A05929, A5929, NUDOCS 8711100378
Download: ML20236L509 (3)


Text

,

s General Offices a Seiden Street. Berlin, Connecticut 1

TH CopedC18 CUT UGHT mD roet R COMPAp6V 9

.wia uusaceirn naciac C==v P.O. 80X 270 UU".'Cll1"'0'C.;

HARTFORD CONNECTICUT 06141-0270 L

J (20m e65-5000 i

l l

l 1

November 4, 1987

'1

. Docket Nos. 50-245

)

50-336 A05929 l

1 l

l U. S. Nuclear Regulatory Comtission Attn: Document Control Desk Washington, D. C.

20555

References:

(1)

T.

E. Murley letter to J.

F. Opeka, dated July 22,

1986, Inspection Report Nos.

50-245/86-06, l

50-336/86-06, and 50-213/86-04, d

l l

(2) J.

F. Opeka letter to T.E. Murley, dated August 21, l

1986, Response. to Inspection Nos.

50-245/86-06, 50-336/86-06, and 86-213/86-04.-

(3) J. F. Opeka letter to T. E. Murley, dated November 19,

1986,

Response

to Inspection Nos.

50-245/86-06, 50-336/86-06, and 50-213/86-04.

I i

(4) E.

J. Mroczka letter to U. S. Nuclear Regulatory i

Conmission, dated February 17,

1987, Update to j

Response to I&E Inspection. Nos.

50-245/86-06 and 1

50-336/86-06.

i I

(5) 3.

J.

Mroczka letter to U. S. Nuclear Regulatory Comisnion, dated May 15, 1987, Update to Response to I

I&S Inspection Nos. 50-245/86-06 and 50-336/86-06.

l l

(6) E.

J. Mecczka letter to U. S. Nuclear Regulatory Commissior. dated August 12, 1907, Update to Response i

n to I&E Inspecticn tts. 50-245/86-06. and 50-336/86-06.

Gentlemen:

I-Millstone Nuclear Ibwer Station, Unit Nos. l'and 2 l

Urrlate to ISE Inspection Nos. 50 245/86-06 and 50-336/86-06 Reference (1) informed Northeast Nuclear Energy Company of five tevel IV violations, which were identifled during inspections at the Millstone Nuclear Power Station, Unit Nos.1 and 2 (March 24-27 1986).

j

/ g/

In addition to responding to the inspection report, Reference (1) j directed that an update be provided every 90 days until all upgrades

/

g j

{

are conpleted.

l e

1 i

age '

U. S. Nuclear:Regulhtory Ccanissioni LA05929/Page:2.'

November 4,-1987-Reference; (2)i responded ~ to : Reference ~ (1)'.

References ' (3), : ( 4 ), ' (5),

'and '(6) provided the 90-day updates.: This report is : the fifth 90-day 1 update and provides the status on all' items'that were: incomplete as of the date of our Reference'(6) update.

Alleged Violation O'

10CFR71.5 requires that each licensee who'. transports licensed materiali 3

outside of' the confines' of its plant-and other place of use, or who c

)

delivers licensed material to a carrier for transport, shall emply.

with the applicable requirements oflthe regulations appropriate to the-made of transport of Department 'of' Transportation in-49CFR' Parts 170 through 189..

49CFR172._403(c) requires,' in part, that a Radioactive ' Yellow-III-label '

must be affixed to each package of radioactive material which' measures tJ in. excess ofl 1.0 millirem 'at lL meter from each point onf the external (I

surface of - the package.

In addition, J 49CFR172.403 - requiresD that a vehicle transporting-packages- 'of radioactive - materialj - must. be placarded if the. vehicle ' contains packages of' licensed material that q

are labeled Radioactive Yellow-III.

Contrary to the above,- on March 5, 1986, licensed material'was delivered to a carrier for transport 'in a package which had a.

radiation level of 3.0 millirem per hour at l'. meter fran' the surface of the package, and this package was erroneously labeled; Radioactive' Yellow-II rather than Radioactive Yellow-III as required. - ' As a result, the vehicle containing.the package.was.not-placarded.as required by 49CFR172.504(a).

This is a Severity Level IV violation (Supplement V).

450-Day Status A training program has been developed and implemented. : Radioactive Materials Handling personnel will be trained by December _31, 1987.

Alleged Violation 10CFR50, Appendix B, Criteria II requires, in part, that the licensee shall provide for indoctrination and training of personnel performing activities affecting quality as. necessary to assure that ~ suitable proficiency.is achieved and maintained.

Contrary to the above, as of March 27, 1986,- the Acting Radioactive Materials Handling Supervisor and the principal Radioactive Waste Materials ' Handler, who are involved in' an activity-affecting quality in the handling of radioactive materials, were not adequately' trained to assure that suitable proficiency was achieved and maintained.

n l

~ ' {...

t.

+

..l U. 'S.! Nuclear Regulatory: Comission-

, d A05929/Page 3'.

1

. November 4, 198 / ~.

l

'Specifically,.the Acting Radioactive Materials Handling Supervisor.had been in the position:for about a year and had not receivediany.

. training ' in 1. the. transportation of radioactive material'.

The n a

Radioactive Waste. Material Handler, who has been. in his: positionJfors 1

about a year, received only 2-3 days training about a year,ago,- which :

1 L was insufficient' toiassure that suitable proficiency was achieved and; maintained ' in the. area. of l transportation L of radioactive ' material in.

light: of. the; cmplexity of these. regulations and1of: the 'emplexity,of '

q

. the transportation ; activities : at the Millstone - Relear / Ibwer ' Station. -

This is a-Severity Level IV violation.(Supplement V).-

'450-Day Status.

-]

J A training program has been developed and 31Niplemented. 1 Radioactive Material' Handling' personnel will'be trained.by December 31,-1987.

0 450-DayStatusof: Improvements.toRadioactiveMaterialsDepartmenti.

1. - Monthly surveillance-of:the processing of~ radioactive. waste l"t including packaging and shipping is continuiro. Surve111ances; cmpleted during. this; time period. are listed below:

187-51 Laundry shipm nt SG87 Iaundry Packaging A status report of upgrades and improvements in.our program for 1

preparation, packaging and shipment.or radioactive materials will be' furnished to you every 90 days until all upgrades are completed.-

I a

Very truly yours, l

NORIHEAST NUCLEAR ENERGY CCMPANY Y,b. b E. J. Mroczka

'j i

l Senior Vice President-

-f 1

i

.1

.By:

C. F. Sears

.Vice? President cc:. W. T. Russell, Region I Administrator M. L. Boyle, NRC Project Manager,' Millstone Unit No. '13 D. H. Jaffe, NRC Project Manager, Millstone Unit No. 2:

W. J. Raymond,' Senior Resident Inspector, Millstone Unit Nos. 1, 2 and 3 i

u i

i

___ - - _