Monthly Operating Repts for Feb 1989 for Catawba Nuclear Station Units 1 & 2
ML20236C368
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/28/1989
From: Tucker H, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20236C371 List:
References
NUDOCS 8903220106
Download: ML20236C368 (13)


Text

_

t l

l.

1 l

0FERATING DATA REFORT DOCKET ND 50-413 DATE March 15, 1999 0FEFATING STATUS CCMPLETED BY R.A. Williams TELEPH3NE 704-373-5987

1. Unit Nase: Catawba 1
2. Reporting Feriod: February 1, 1989-February 28,1989
3. Licensed Thereal Pcwer (MWt):

3411

4. Nateplate Rating (Gross MWe):

1305*

Notes INameplate Rating

5. Design Eltctrical Rating (Net MWe):

1145 (Srcss MWe) calculated as

6. Maxieue Dependable Capattty (Eress MWe):

1192 1450.000 MVA x.00 pcrer

7. Maxieue Dependable Capacity (Net MWe):

1129 factor per Page lii,

8. If Changes Cccur in Capacity Ratings (Itess Number 3 Through 1) Since Last NUCES-0020.

R pert. Give Reascos:

9. Fewer Level To Which Restricted, If Any (Net MWe):
10. Reason Fcr Restrictions, If any:

This Month Yr.-to-Date Cumulative

11. Hours in Feperting Feried 672.0 1416.0 32165.0
12. Number Df Hours Reactor Was Critical 595.7 595.7 22779.5
13. Reatter Reserve Shutdown Hours -

- - 14. Fours Generator Dn-Lirs 499.9 459.9 2207.1

15. Unit Feserve Shutdent Hours

~ 0--

--0--

- 16. Srcss Thereal Energy Generated (MWH1 1491051 1481051 70419437

17. Gross Electrical Energy Generated (MWH) 495036 495038 24629659
18. Net Electrical Energy Ger:erated (MWH) 458125 443562 2307?084
19. Unit Service Factor 72.9 24.6 68.7
20. Unit Availability Factor 72.9 34.6 69.7
21. Unit Capaci+v Factor (Us!ng MDC Net) 60.4 27.8 62.9
22. Unit Capaciti Factor (Using TER Wet) 59.5 27.4 f2.6
23. Onit Fcrced Lutage Rate 8.9 8.0 15.4
24. Ehutdcun Schehled Dver Ne:t 6 Months (Type, Date, and Duration of Ea:hh None
25. If Shut Down At End Cf Feport Period. Estiaated Date of Starttp:
26. Units In Test Status (Frict to Cessercial Operation):

Forecast Achieved IhlTIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL 0FERA110N g222pg 13$3 n%

ji-}g.

8

.]

3 l1 o>

1 l'

1

' CPERATING DATA REPORT-

.)

j l

l DOCKET NO 50-413-

~;

. UNIT Catanta 1

.DATEMarch 15,1989

{

COMPLETED BY R.A. Willises i

TELEPHONE 704-373-5987 90 NTH _ February, 1989 i

l i

E AVERASE DAILY POWER LEVEL DE AVERAGE DAILY POWER LEVEL

j (MWe-Net)

(MWe-Net)

.1 0

17 1105 2 ~

'O 18 1103 3

0 19 1103

~4 0

20 1100

'5 0

21 1092 6

0 22 1101 7.

0 23 1030 8

34 24 1034 9

129 25 1059

'10 429 26 1087 11 719 27 1106 12 819 28 1107 13 962 14 1084 15 1080 16 1092

"y

)]jI)ll h Q s(

Q otn c

r-P iae r

f-2 I

I tDc u

6 H

R c

i o

7 T. '

T u f L )R )

S 5

E' O

X N

ro.

D G

T E ~

R

.E t

rE1 e

EC E

snoL6 m

(

1 A 3 A

N' 9

E 7 T

E0 I

VI RX noF(1 a

A 8 M 3 E

U U1 B

T IF UR Ii 0

S 3

B /

V E'

O D

R S

TF T(

tst-I C

U E

IE S

atrG 1 W 5

. )

_4 A 1 J 4

.T N

G E

T' T

SO IL reoE

- T /

0 C

E N

C8 OC OE GaepR I

O P

P MV ph e U 0 A 3

. 7 E

R I

I

,)

ROR L

V 7,L T

I E

E teSRN t

5 C 0 J

(

A R

OR HL' ir

(

i R '6 C RTU E

E E

T TU G

b P yt b

O C

U

.EEYE CNE F

S#I U

T IR' i

rne i

OMTBN OR E

T DG D

EA HE hrtel h

NAA O

DI R

MEI N

E UR T

xonvi x

E EfEEF NDDH NTT OHR NI E

DE OA

)

)

.T EP ACN 3

RTC OT P

P TE 4

5 ET TE AE F

IS S

RM H

(

(

KI EL E

V E

NX TE R

EE EE CN LE S

E L

DOR CT E

WT UR U

V O.

D OU PT U

R C

E

(

D M

A P

Y VN DD O)

PR R)

O C

C OOS EE L

.O POL m ).

C MIG RE EA GT ITA an F

ETN P

NC NA RAC ri O

RAI RS II IR TRI mca RR ER BT DE ET aSl D

GBA WE RI LD GPI r

p N

/ IE OV UR OO

/ ER ccx E

TVB PO TC HM TSC SiEt(

S

- lla

.N

aamr O

T duuoe I

N X

U N

U x

H onnth E

X R

I R

x C'

haaut T

)

C 9

5 NE L

T B

T x

X tMMAO E

e-OD E

S R

S x

U 8

(

T' M1234 D

9 PO U

N U

N x

)

E 1

MC F

I T

I x

H 3

(

R O

y C

R r

n E

a E

o SMD C

A A

A C

B i

W u

)

O r

4 YEO R

H H

H R

H t

STC a

P b

(

e n

F i

DN m

A E

a S

T x

S NTR E

.N ENO e

W H

CEPO

)

O T

IVEN n

s

.D N

LER i

n T

O a

e

)

U H

l c

n

.H TN p

ni i

T D' UWX x

oL a

.S T

)

R 3EOFHO/

1 1

E i

l MHOSDR (t

t&

p T

O

(

I P

s c

x ee i g E

.N E

)

U R

2 C

A B

B H

A rt rn

(

REASON u

ti

)

(

lr snern io eivoi N

0 5

8 3

a Raira O

6 7

8 8

Fe r t rl c

yTaEp IS TR 2

9 1

7 tngr r

x AU 3

3 nanortrE RO 1

enitoso(

UH melatit ptel anar D

ninuurire o uif g e m eh s q a e e pd pt

)

1 TYPE S

F S

S F

F aEMRROAOO e-(

RABCDEFGH

)

2 1

6 8

8 8

8

(

E 2

2 2

2 2

2 d

3 T

e A

l F

D 9

9 9

9 9

9 du O

8 8

8 8

8 8

ed ce 1

rh P

P oc E

FS G

NO 1

2 1

3 2

4 FS A

)

P 1

(

L l

l ll!

llll!!ij!(!

(l1 ll lllll!

i

!llll(ll!ll

l;I C

nns e

otn c

iae r

2 F

tDc u

6 O

c i

o 7

ufL)

S r o'r E 1 R) 5 T

D-L G

N e

t 1

A3 O

N E

E snoL6 m

9 E7 R

I M

R noF(1 a

A8 M3 E

T P

E N

N U

Ii 0

S 3B/

V E

MN P

C O

O 2T tst -

1W5

.)

I C

AO A

A RI RI BP

- atrG 4A1 J4 T

N ECS M

L AT AT 1U reoE T/

0 C

E T

M P

EA EA R

GaepR I

0A3 7

E R

SRE X

E LR LR O

pheU 5C0 J(

ROR EL U

R CB CB TE teSRN t

RTU OTB L

2 UI UI B

ir

. (

i O

C TAO F

RG NL NL EU b P yt b

.EEYE CNE WR O7 A

A UT i

rne i

OMTBN OR EDP R

F8 RC RC D

hrtel h

NAA O

DI UE O

O O

R xonvi x

NDDH NTT DEG F

NY FN FN NE EfEEF E

)

)

T EF ACN FN OA O

O OT 4

5 ET TE AE R

I R

IL RI RI IA

(

(

KI EL E

V EDT E

TE ET ET TE CN LE S

E W1A W

CR WA WA CH OU PT U

R O

R O

U OT OT U

D M

A P

PRE P

DR PN PN DR O

C OP EO E

E EE m)

C GTO G

RT GM GM RT an NA N

A NU NU A

ri IRE I

RR IR IR RW mca DEV D

EE DT DT ED aSl LNL L

WN LS LS WE r

p OEA O

OE ON ON OE ccx HGV H

PG HI HI PF SiEt(

S lla aamr N

O T

duuoe I

N X

x A

U U

H onnth E

E x

R R

R C

haaut T

)

C 9

5 NE V

x E

T T

X tMMAO OD L

x N

S S

E e-U 8

(

M1234 D

9 PO A

x E

N N

T

)

E 1

MC V

x G

I I

H 3

R O

(

y C

R r

n E

a E

o SMD H

E E

E E

B i

W u

)

O r

4 YEO H

I E

I I

H t

STC a

P b

(

e n

D F

i N

m A

E a

S T

x S

NTR E

N ENO e

W H

CEPO

)

O T

IVEN n

s D

N LER i

n T

O a

e

)

U M

l c

n H

TN p

ni i

TD UWX x

oL a

S T

)

R 3EOFHO/

E i

l t

t&

p T

O MHOSDR

(

(

I P

s c

x ee i g E

N E

)

U R

2 A

B A

B B

A rt rn

(

REASON u

ti

)

(

lr snern io eivoi N

a Raira O

Fe rtrl IS c

yT a E p TR tngr r

x AU nanortrE RO enitoso(

UH melatit ptel anar D

ninuurire ouifgemeh s q a e e pd pt

)

1 TYPE F

S F

S S

F aEMRROAOO e-(

RABCDEFGH

)

2 9

9 0

0 1

1

(

1 1

1 1

E 2

2 2

2 2

2 d

3 T

e A

l F

D 9

9 9

9 9

9 du O

8 8

8 8

8 8

ed ce 2

rh P

P P

P P

P oc E

FS 3

4 5

6 7

8 G

NO FS

)

A 1

P

(

1W5

.)

I C

A A

- atrG 4A1 J4 T

N M

R 'B M

reoE

- T/

0 C

E I1 GaepR 0A3 7

E R

X A'

X ph e U 5C0J(

ROR U

P U

't e S R c

RTU L

ER L

ir O

C F

RO F

b P yt -

EEYE CNE T

i.rne OMTBN

- OR R

RO R

hrtel NAA - O DI -.

O OM O

xonvi NDDH NTT F

F F

EfEEF

)

T EP ACN Y

4 L

ET TE AE R'

RL R

(

KI EL E~

V E

EB E

CN LE S

E W

WM W

OU PT U

R O

OE O

D M

A P

P PS P

O C

S m

C G

GA G

a N

N N

r I

IE I

mc D

DV D

aSl L

LI L

rp O

OR O

cc H

HD H

SiE

- t S

lla.

aamr N

O T

duuoe I

N x

X Y

onnth E

x R

Y haaut T

)

C 9

5 N E x

O Y

tMMAO O D x

T Y

e-U 8

(

M1234 D

9 P O x

O Y

)

~

E 1

M C x

M Y

3 R

O

(

y C

R r

E a

E SM D

E E

E W

u

)

O r

4 YE O

I I

I ST C

P b

(

.e D

F NA E

S T

S NTR N

ENO W

H CEP O

)

O T

IVE N

n D

N LER i

T O

a U

M l

H TN p

TD UW X x

S T

)

R 3EO FHO

/

E t

T O

MH OSD R

(

(

I P

s ee N

E

)

U R

2 B

A B

rt RE ASO N

u

(

lr io N

a O

Fe IS c

TR tngr AU nano RO enit UH melat ptel a D

ninuur ouif gem s q a e

)

1 TYPE S

F S

aEMRR e-(

RABCD

)

2 1

2

. 2

(

1 1

1 E

2 2

2 d

3 T

e A

l F

D 9

9 9

du O

8 8

8 ed ce 3

rh P

P P

oc E

FS G

NO 9

0 1

FS A

1 1

)

P 1

(

L

J DOCKET NO

'50-413 UNIT:

Catawba 1 i

DATE:

03/15/89 1

1 NARRATIVE

SUMMARY

Month: February, 1989 Catawba Unit 1 began the month of February off line for its End of Cycle 3 Refueling Outage. The unit returned to service at 1236 on 2/06, and was subsequently removed from service due to high vibration on the main Turbine.

The unit then returned to service at 0504 on 2/08, and was removed from service at 1326 the same day for a Turbine Overspeed Trip Test. The unit returned to service at 1519 on 2/08, and following a hold for moderator temperature coefficient, the Turbine tripped off line due to a High Moisture Separator Reheater level. The unit then returned to service at 0431 on 2/09, and following several startup related holds, as well as unplanned holds for Feedwater Control Valve problems, Generator Relay replacement, Feedwater Heater problems and Incore Nuclear Instrumentation Drive Assembly Motor problems, reached 100% power at 1730 on 2/13. The unit then operated at or near 100%

power, without further significant reductions, for the remainder of the month.

Prepared by:

J. J. Mead Telephone: 704-373-5762 2

4

4 MONTHLY REFUELING INFORMATION FEQUEST 1.

Facility name: Catawba, Unit 1 2.

Scheduled next refueling shutdown: Jtnuary, 1990 3.

Scheduled restart following refueling: March 1990 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting-information: N/A 6.

Important. licensing considerations (new or'different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 196 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: September, 2011 DUKE POWER COMPANY DATE:

March 15, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 i

l

m, x

.m f

4 E!;

0FERATING DATA REPORT.

t DOCKET NO-50-414 DATEMarch 15. 1989 DPERATING STATUS COMPLETED EV R.A. Williass-TELEPHONE 704-373-5987

.1. Unit Nase: Catawba 2

2. Reporting Period: February.1, 1989-February 28,1989 3.; Licensed Thereal Power (MWt):

3411 4.'Nateplate Rating (Gross MWe):-

1305*

Notes (Naseplate Rating

5. Design Electrical Rating (Net MWeh.

1145-(Stoss MWel calculated as

6. Maximus Dependable Capacity (Gross MWe):

1192 1450.000 MVA x.90 power

? 7. Maximus Dependable Capacity (Net MWeh 1129.

factor per Page iii,

'B. If Changes Occur.in Capacity Ratings.(Itees Wusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons:

I 9; Power Level To Which Restricted, If Any (Net MWe):

L10.ReasonForRestrictions,Ifany:

This Month Yr.-to-Date Cumulative 1

i

!!. Hours In Reporting Period 672.0 1416.0 22201.0

12. Number Of Hours Reactor Was Critical 625.2 1295.8 16398.1
13. Reactor Reserve Shutdown Hours

--0--

---0--

--0--

14. Hours Generator On-Line 614.0 1267.3 15918.0 l
15. Unit Reserve Shutdown Hours -

--0--

--0--

16. Brass Thersal Energy Benerated (MWH) 1902721 3925044 48489269

)

17. Gross Electrical Eriergy Generated IMWH) 680766 1405625 17093806 i

.18. Net Electrical Energy Generated (MWH) 642510 1324083 15960915 i

19. Unit Service Factor 91.4 89.5 71.7
20. Unit Availability factor 91.4 29.5 71.7

'21. Unit Capacity factor (Using MDC Net) 84.7 82.8 63.2

22. Unit Capacity Factor (Using DER Net) 83.5 81.7 62.8
23. Unit forced Outage Rate B.6 10.5 21.6 i
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh Refueling - flarch f0,1989 - 9 weeks
25. If Shut Ecwn At End 0f Report Feriod. Estimated Date of Startup:
26. Units In Test Status (Prior to Consercial Operation h Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

=

g

, -:J l

< o Y'

. ' i; n:f;.,

s s,

-l' 4

OPERATING DATA REPORT i

)

-i

.i DOCKET NO 50-414-

i 1

UNIT Catawba 2' t

DATEMarch 15. 1989 LCOMPLETED BY R. A. Williaes.

. TELEPHONE < -704-373-5987' MONTH February. 1989 3

.g AVERASE DAILY POWER LEVEL

..f D

AVERAGE DAILY POWER LEVEL E

(MWe-Net)

(MWe-Net) 1 1080 17 1095 2

1076 IB 1099 73 1075i 19 1100 "4-1086 20 1099 5

1089 21 14

~

.6.

1096 22 0

7.

1084 23 5

8 1089 24 758 9

1097 25 1067 10 1094 26 1067 11 1092 E7 1073

- 121 1091 28 1072 13 1093 f

14 1087 15 1069 16 1085 E

l l:

l u

l.

[_-

1W5 I

C VE NE NE R

T RI

- atrG

.)

4A1J4 T

N DV IR IR O

A AT reoE

- T/

0 C

E AE LU LU T

W EA GaepR 0A3 7

E R

NL L

L C

D LR ph e U 5C0J(

ROR I

FI FI A

E CB teSRN RTU R

FA FA E

E UI ir

(

O C

OO OF OF RN F

NL b P yt

.EEYE CNE TT O

A i

rne OMTBN OR A

RR RR RI R

RC hrt el NAA O

DI ER OE OE OT O

O xonvi NDDH NTT UE TK TK FA F

FN EfEEF

)

T EP ACN DN AA AA L

O 4

ET TE AE E

RE RE RU R

RI

(

KI EL E

V PG ER ER EC E

ET CN LE S

E I

NB NB WL WP WA OU PT U

R RMN E

E OA OA OT D

M A

P T AO GR G R P C PW P N O

C EI O

O S

E m)

C R TT ET E T G E G

G M an O SA NA N A N G NE N U ri T

C IR I R I A IL I R mca C CI BE B E D K DZ D T aSl A

D RN R N L A LZ L S r

p E ON UE U E O E OO O N ccx R LI TG T G H L HN H I SiEt(

S lla aamr N

O T

duuoe I

N H

R R

U x

U onnth E

C K

K R

x R

haaut T

)

C 9

5 N E X

B B

T x

T tMMAO O D E

T T

S x

S e-U 8

(

D 9

P O T

K K

N x

N M1234

)

E 1

M C H

C C

I x

I 3

R O

(

y C

R r

E a

E SM D

Z A

A B

H E

W u

)

O r

4 YE O

Z H

H C

C I

ST C

P b

(

e D

F NA E

S T

S N TR N

E NO W

H C EP O

)

O T

I VE N

n D

N L ER i

T O

a U

H l

H TN p

n TD UW X x

o S

T

)

R 3 EOF HO

/

3 E

i t

t&

T O

MHO SD R

(

(

I P

s c

ee i

N E

)

U R

2 A

A A

B H

B rt r

REASON u

ti

(

l r s

io e

N 0

3 8

a R

O 0

2 7

Fe c

y IS TR 5

2 0

tngr AU 5

nanortr RO enitoso UH mel atit ptel anar D

ninuurire ouif gemeh s q a e e pd

)

1 TYPE F

F F

S S

S aEMRROA e-(

RABCDEFG

)

2 2

1 3

3 3

3 4

(

f 2

2 2

2 2

2 o

E 2

2 2

2 2

2 d

1 T

e A

l e

D 9

9 9

9 9

9 du g

8 8

8 8

8 8

ed a

ce P

rh P

P P

oc FS NO 3

4 5

3 4

5 FS

)

1

(

(

1

.)

I C

RI atrG 1W5 4A1 J4 T

N AT reoE

- T/

0 C

E EA GaepR 0A3 7

E R

LR ph e U 5C0J(

ROR CB teSRN RTU UI ir O

C NL bPyt

. E' EYE CNE A

i rne OMTBN OR RC hrtel NAA O

DI O

xonvi NDDH NTT FN EfEEF

)

T EP ACN O

4 ET TE AE RI

(

KI EL E

V ET CN LE S

E WA OU PT U

R OT D

M A

P P N O

C E

m C

G M a

N U r

I R

mc D T aSl L S r

O N ccx H I SiEt S

ll a aamr N

O T

duuoe I

N U

onnth E

R haaut T

)

C 9

5 N E T

tMMAO O D S

e-U. _

8

(

M1234 9

P O N

)

E 1

M C I

3 R

O

(

y C

R r

E a

E SM D

E W

u

)

O r

4 YE O

I ST C

P b

(

e D

F NA E

S T

S NTR N

ENO W

H CEP O

)

O T

IVE N

n D

N LER i

T O

a U

M l

H TN p

TD UW X x

S T

)

R 3EO FHO

/

E t

MH OSD R

T O

(

(

I P

s ee N

E

)

U R

2 B

rt RE ASO N

u

(

lr i o N

a O

Fe IS c

TR tngr AU nanor RO enito UH melat pt el D

ninuuri ouif geme s q a e e

)

1 TYPE S

aEMRRO e-(

RABCDE

)

2 2

(

4 f

2 o

E 2

d 2

T e

A l

e D

9 du g

8 ed a

ce P

rh P

oc FS NO 6

FS

)

1

(

l

' i l

l

F i

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: Catawba, Unit 2 2.

Scheduled next refueling shutdown: March, 1989

-3.

Scheduled restart following refueling:

May, 1989 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

64 8.

Present licensed fuel pool capacity:

1418 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: January, 2013 l

l DUKE POWER COMPANY DATE:

March 15, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

y

.g q,,.. v.

' (,.

Q (( '

4 1:

DOCKET NO:

50-414-UNIT:

' Catawba 2 DATE:

03/15/89.

NARRATIVE

SUMMARY

l

'. February, 1989~

Month:

. Catawba Unit _2 began the month.of: February withou't'any significant reductions from 100% power. The1 unit tripped'off line at 0112 on 2/21 due to an indication of-Lo' Lo Steam Generator level..The unit then re' urned -to service at 1113 on t

2/23, following two unsuccessful. attempts to put the Generator back on line due to Generator Breaker. failures.

Following several startup related. power holds,

-- the unit returned to,near full power on 2/24. The unit then operated at or near

~

- full power,'without further significant reductions, for the remainder of.the month.

l l Prepared by:

J. J. Mead Telephone: 704-373-5762