Forwards Safety Evaluation Re Reactor Coolant Piping Sys Insp Performed During Spring 1986 Refueling Outage.Igscc Insp Provided Sufficient Assurances That Plant Can Be Safely Operated for Next 18-month Fuel Cycle
ML20214Q364
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 11/17/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20214Q367 List:
References
TAC-59859, NUDOCS 8612050125
Download: ML20214Q364 (2)


Text

P

< November 17, 1986 Docket No. 50-264 DISTRIBUTION:

Docket File J. Partlow NRC PDR N. Thompson Local PDR T. Rotella Mr. Dennis L. Farrar BWD1 Reading C. Jamerson Director of Nuclear Licensing R. Bernero ACRS (10)

Commonwealth Edison Company EJordan Quad Cities File Post Office Box 767 BGrimes OGC-BETH (info only)

Chicago, Illinois 60690 RDiggs WKoo JZwolinski

Dear Mr. Farrar:

SUBJECT:

SAFETY EVALUATION OF REACTOR COOLANT PIPING SYSTEMS INSPECTION (TAC 59859)

Re: Quad Cities Nuclear l'ower Station, Unit 1 NRC staff has completed a technical review of your submittal dated March 12, 1986 regarding the inspection performed on the reactor coolant piping systems.

The inspection was conducted during the Spring 1986 refueling outage. NRC staff has concluded that the Intergranular Stress Corrosion Cracking (IGSCC) inspection performed during the 1986 outage provided sufficient assurances that Quad Cities Unit 1 can be safely operated for the next 18-month fuel cycle.

NRC staff notes, however, that because of uncertainties about the long-term behavior of the IGSCC phenomena and the subject piping, we require that the plan for inspection and/or mcdification to the recirculation piping as well as any other service sensitive austenitic stainless steel piping systems, operating above 200 F during the next operating cycle, be submitted for our review and comment at least 3 months before the start of the next refueling outage.

An NRC staff Safety Evaluation (SE) for the IGSCC inspection is enclosed.

If you should have any questions regarding the above request, or the evaluation prov'ded in the SE, Tom Rotella on (301)please contact your NRC Quad Cities Project Manager, 492-9413.

Sincerely,

_0riginal signed by John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DBL:BWD#1 DBL:BWD# DBL:BWD#1 CJamerson TRote11a/pn JZwolinski 11/ib /86 11/ 5/86 11/$/86 8612050125 861117 ~

PDR ADOCK 05000254 G PDR

P Mr. Dennis L. Farrar Quad Cities Nuclear Poser Station Commonwealth Edison Company Units 1 and 2 ,

1 cc:

Mr. B. C. O'Brien l President Iowa-Illinois Gas and Electric Company 706 East Second Avenue Davenport, Iowa 52801 Mr. Michael I. Miller Isham, Lincoln & Beale ,

Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. Nick Kalivianakis Plant Superintendent Quad Cities Nuclear Power Station 22710 - 206th Avenue - North Cordova, Illinois 61242 Resident Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors Rock Island County Court House Rock Island, Illinois 61201 Mr. Michael E. Parker Division of Engineering Illinois Department of Nuc. lear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l